International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG06 : Meeting Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG06  ALL (2007-11-19) 

ITU-T SG06

Outside plant and related indoor installations

Study Period 2005

Meeting  from 2007-11-19 to 2007-11-23

held in Switzerland [Geneva]

Collective Letters  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 5 ]  
 
Meeting of Study Group 6, Geneva, 19 - 23 November 2007     SG 6     2007-09-17
 

 
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 49 ]  
 
Revised draft proposal for a new recommendation for optical cabling systems in buildings     France Telecom   Q2/6   2007-11-09
[ 48 ]  
 
Contribution for a Draft new Recommendation L.coloop "Developing the copper loop requirement, including indoor and structured cabling, for various access technologies"     Korea   Q5/6   2007-11-08
[ 47 ]  
 
Japanese experience on optical fiber joints for appendix of ITU-T Rec. L.12     NTT   Q9/6   2007-11-07
[ 46 ]  
 
Information about optical fibre identification technique for operation and maintenance of optical fibre communication networks     NTT   Q6/6   2007-11-07
[ 45 ]  
 
Proposed initial Updated proposal for a draft new for new ITU-T Recommendation L.iirud "Methods for Improved methods for installing, inspecting and repairing underground ducts"     Korea Telecom   Q2/6   2007-11-05
Currently viewing 5 of 7  documents related to this meeting (more...)  

 
Temporary Documents  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 322-GEN ]  
 
Final list of participants     TSB   QALL/6   2007-11-23
[ 321-GEN ]  
 
OUTGOING LS - Draft LS to ITU-T SG4 on OSS requirements works     Rapporteur Q4/6   Q4/6   2007-11-22
[ 320-GEN ]  
 
First revised draft for Qx/6 for next Study Period     Rapporteur Q4/6   Q4/6   2007-11-22
[ 319-GEN ]  
(Rev.1) 
Draft Report of the fourth meeting of Study Group 6 "Outside plant and related indoor installations" (Geneva, 19-23 November 2007)     TSB   QALL/6   2007-11-23
[ 318-GEN ]  
 
OUTGOING LS - Reply to Q1/15 onupdate on Access Network activities in SG6     Liaison Officer to SG15   QALL/6   2007-11-22
Currently viewing 5 of 61  documents related to this meeting (more...)  

 
Reports  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 5 ]  
 
Report of the fifth meeting of Study Group 6 "Outside plant and related indoor installations" (Geneva, 19-23 November 2007)     SG 6   QALL/6   2007-12-21
 

 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-12