Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 205 ]
|
Liaison statement - New versions of the Access Network Transport (ANT) - Standardization plan and Workplan
|
ITU-T Study Group 15
|
|
2012-01-03 |
|
[ 204 ]
|
Liaison statement to Working Party 5B (copy to Working Party 4B for information) - Propagation end-to-end link availability of unmanned aircraft system operating with dual beyond line-of-sight (BLOS) satellite communications links to achieve the assume link availability
|
WP 3J and WP 3M
|
|
2011-10-26 |
|
[ 203 ]
|
Liaison statement to the Coordination Committee for Vocabulary (copy to Study Group 4 and Working Party 4B) - Proposed definitions for "Integrated MSS system" and "Hybrid satellite/Terrestrial system" terminals
|
SG 6
|
|
2011-10-19 |
|
[ 202 ]
|
Liaison statement to ITU-R Working Party 5D (Copy to ITU-R Working Party 4B and ITU-T Study Group 13) - Access technology for broadband telecommunications including IMT, for developing countries
|
ITU-D SG 2, Question 25/2
|
|
2011-10-06 |
|
[ 201 ]
|
Liaison statement to ITU-T Study Groups 11, 13 and 17, and to ITU-R Working Parties 4B and 5C - Migration from existing networks to next-generation networks for developing countries: technical, regulatory and policy aspects
|
ITU-D SG 2, Question 26/2 (W)
|
|
2011-10-05 |
|
[ 200 ]
+Ann.1-15 |
Report on the thirty first meeting of Working Party 4B (Geneva, 19 - 23 September 2011)
|
Chairman, WP 4B
|
|
2011-09-23 |
|
[ 199 ]
|
Final List of Participants - Working Party 4B (Geneva, 19-23 September 2011)
|
Director, BR
|
|
2011-09-23 |
|
[ 198 ]
|
List of documents issued
|
BR Study Group Department
|
|
2011-09-16 |
|
[ 197 ]
|
Preliminary draft new Report ITU-R S.[CROSS_LAYER] - Cross-layer QoS for IP-based hybrid satellite-terrestrial networks
|
United States of America
|
287/4
|
2011-09-07 |
|
[ 196 ]
|
Preliminary draft new Recommendation ITU-R S.[CROSS_LAYER] - Cross-layer QoS provisioning in IP-based hybrid satellite-terrestrial networks
|
United States of America
|
287/4
|
2011-09-07 |
|
[ 195 ]
|
Working document - Preliminary self-evaluation of candidate satellite radio transmission technology for IMT-Advanced, "SAT-OFDM"
|
Korea (Republic of)
|
|
2011-09-06 |
|
[ 194 ]
|
Working document towards preliminary draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-Advanced (IMT-Advanced): SAT-OFDM
|
Korea (Republic of)
|
|
2011-09-06 |
|
[ 193 ]
|
Proposed preliminary draft revision of Recommendation ITU-R M.1850 - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-2000 (IMT-2000)
|
Korea (Republic of)
|
|
2011-09-06 |
|
[ 192 ]
|
Draft new Recommendation ITU-R M.[SATIMT_CIRCUL] - Global circulation of IMT-2000 satellite terminals
|
France
|
|
2011-09-12 |
|
[ 191 ]
|
Proposed modification to Working Document towards a preliminary draft new Recommendation ITU-R S.[ACM] - Impact of adaptive coding and modulation on availability objectives
|
Japan
|
|
2011-09-01 |
|
[ 190 ]
|
Liaison statement to ITU-R Working Party 4A, Working Party 5A, Working Party 5B, Working Party 6A, Working Party 7B for information only - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
|
WP 5D
|
|
2011-07-27 |
|
[ 189 ]
|
Liaison statement - revision of Resolutions ITU-R 17-3, ITU-R 56 and ITU-R 57
|
WP 5D
|
|
2011-07-26 |
|
[ 188 ]
|
Proposed liaison statement to the coordination committee for Vocabulary (copy to Study Group 6 and Working Party 6B) - Proposed definitions for "Integrated MSS Systems" and "Hybrid Satellite/Terrestrial System" terminals
|
France
|
|
2011-07-11 |
|
[ 187 ]
|
Liaison statement to Workin gparty 4B - Revision of Recommendation ITU-R M.1224
|
WP 5D
|
|
2011-07-26 |
|
[ 186 ]
|
Liaison statement to Working Party 4B (copy to ITU-D Study Group 2) - Development of a Handbook on "Global Trends in IMT"
|
WP 5D
|
|
2011-07-26 |
|
[ 185 ]
|
Liaison statement to Working Party 4B - Revision of Resolution ITU-R 50-1 and Opinion ITU-R 92-1
|
WP 5D
|
|
2011-07-26 |
|
[ 184 ]
|
Liaison statement to Working Parties 3J and 3M (copy to Working Party 4B for information) - Propagation End-to-End link availablility of unmanned aircraft system operating with dual beyond Line-of-Sight (BLOS) satellite communications links to achieve the assumed link availability
|
WP 5B
|
|
2011-07-01 |
|
[ 183 ]
|
Liaison statement to Working Party 4B (copy to Working Party 4A and Working Party 4C for information) - Potential link availability for unmanned aircraft control and non-payload communications (CNPC) links
|
WP 5B
|
|
2011-07-01 |
|
[ 182 ]
|
Revision of ITU-R Recommendations
|
Chairmen, WPs 4A, 4B and 4C
|
|
2011-06-24 |
|
[ 181 ]
|
Liaison statement to Working Parties 4A, 4B, 4C, 6A, 6B and 6C - On possible action in relation to Opinion ITU-R 51
|
WP 5C
|
|
2011-06-24 |
Results:205 total items. Result page:
1 -
2 -
3 -
4 -
5
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):