Français
Español
Home
:
ITU-T
:
SG19
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG19 C
ITU-T SG19
Max # of documents displayed/page:
Mobile telecommunication networks
Study Period 2005
Results:
51
total items.
Result page:
1
-
2
-
Next
Contributions
Number
Title
Source
AI/Question
Filter...
Q2/19
Q3/13
Q3/19
Q4/19
Q5/13
Q5/19
Q6/13
QALL/19
Clear filter
Date
[ 51 ]
Discussion of multi-connection scenarios and architecture
China Mobile
Q6/13
,
Q5/19
2008-09-03
[ 50 ]
Input for Q.1741.5
ETSI
Q3/19
2008-04-03
[ 49 ]
ATIS Input to Rec. Q.1741.5 (3GPP Release 7 Specifications)
ATIS
Q3/19
2008-01-31
[ 48 ]
Text on Transport Level Convergence for Draft Rec. FMC-IMS
Samsung Electronics
Q6/13
,
Q5/19
2008-01-08
[ 47 ]
Proposed restructuring of Q.FMC-IMS
ZTE Corporation, Samsung Electronics Ltd.
Q6/13
,
Q5/19
2008-01-08
[ 46 ]
Revision of Section 8.4 in Q.MMF
ETRI
Q6/13
,
Q2/19
2008-01-08
[ 45 ]
Revised Text for Draft Recommendation Q.HCF (v0.8)
ETRI
Q6/13
,
Q2/19
2008-01-08
[ 44 ]
Revised Text for Location Query Procedure in Q.MMF
Korea Telecom
Q6/13
,
Q2/19
2008-01-08
[ 43 ]
Revised Inter-CN Location Management Architecture for Q.LMF
Korea, (Rep. of)
Q6/13
,
Q2/19
2008-01-08
[ 42 ]
Proposed Texts for Section 5 in Q.LMF
Korea, (Rep. of)
Q6/13
,
Q2/19
2008-01-08
[ 41 ]
Clarification of Texts in Section 7.1 in Q.MMF
Korea, (Rep. of)
Q6/13
,
Q2/19
2008-01-08
[ 40 ]
Proposed Texts for Section 6 in Q.HCF-
Korea, (Rep. of)
Q6/13
,
Q2/19
2008-01-08
[ 39 ]
(Rev.1)
Proposal for fast authentication procedure in Q.HCF
Korea, (Rep. of)
Q6/13
,
Q2/19
2008-01-08
[ 38 ]
(Rev.1)
Editorial Modification in Q.HCF
Korea, (Rep. of)
Q6/13
,
Q2/19
2008-01-08
[ 37 ]
Proposed modifications of draft Recommendation Q.HCF (version 0.6)
ZTE Corporation
Q5/13
,
Q2/19
2008-01-08
[ 36 ]
Mobility functional elements in NGN FRA R2
ETRI, Korea (Rep. of)
Q2/19
,
Q3/13
2008-01-08
[ 35 ]
Proposal for additional text for session/application layer handover
Huawei Technologies Co., Ltd.
Q2/19
,
Q6/13
,
Q3/13
2008-01-07
[ 34 ]
(Rev.1)
Operation of network-assisted mobility control
Huawei Technologies Co. Ltd
Q2/19
,
Q6/13
,
Q3/13
2008-01-08
[ 33 ]
Reconciling draft Rec. Q.mmf with Y.FRA
Huawei Technologies Co. Ltd
Q2/19
,
Q6/13
,
Q3/13
2008-01-07
[ 32 ]
Modified Pre-emptive Operations for Fast Handover
Korea (Republic of)
Q6/13
,
Q2/19
2008-01-07
[ 31 ]
Extensible IP Version 4 Network For Convergence
Public Access
China Telecom
Q6/13
,
Q5/19
2007-09-18
[ 30 ]
(Rev.1)
Review of Q.FMC-PAM Information Flows
Nortel Networks (Canada)
Q6/13
,
Q5/19
2007-09-11
[ 29 ]
Proposals of new text for mobility related clauses in NGN Release 2 documents
NTT Comware Corporation
Q2/19
2007-04-17
[ 28 ]
SAE as a FMC Network Scenario - Propose modification on FMC.req
China Mobile
Q5/19
2007-04-17
[ 27 ]
Network-based Location Management Procedure
ETRI
Q6/13
,
Q2/19
2007-04-12
Results:
51
total items.
Result page:
1
-
2
-
Next
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2008-04-03