Contributions
[ AI/Question: Q11/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 403 ]
|
Requirements for passive Metro DWDM interfaces
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2013-06-18 |
|
[ 402 ]
|
Requirements for Beyond 100G OTN
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q11/15
|
2013-06-18 |
|
[ 401 ]
|
Application scenarios using new Metro DWDM interfaces
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2013-06-18 |
|
[ 400 ]
|
The difference of the trib and line side between the existing OTN and B100G OTN
|
FiberHome Technologies Group
|
Q11/15
|
2013-06-18 |
|
[ 399 ]
|
The requirement of optical overhead extend at IrDI
|
China Unicom
,
FiberHome Technologies Group
|
Q11/15
|
2013-06-18 |
|
[ 397 ]
|
The discussion about OTM- n.m IaDI interface of B100G
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
|
Q11/15
|
2013-06-18 |
|
[ 396 ]
|
The suggestion about OTM-0.mvn IrDI interface of B100G
|
China Mobile Communications Corporation
,
China Mobile Communications Corporation
|
Q11/15
|
2013-06-18 |
|
[ 386 ]
|
Mapping specification of single channel OTU3 and OTU4 using coherent techniques
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2013-06-18 |
|
[ 385 ]
|
Strong FEC for OTU4 and Beyond 100G
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2013-06-18 |
|
[ 352 ]
|
Proposal to add OTU0 frame format into G.709
|
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
SK Telecom
|
Q11/15
|
2013-06-18 |
|
[ 331 ]
|
G.698.3 considerations to add OTU0 frame format into G.709
|
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
SK Telecom
|
Q11/15
|
2013-06-18 |
|
[ 330 ]
|
Signal format considerations for optical network media channels of OTN Beyond 100G
|
PMC-Sierra, Inc.
|
Q11/15
|
2013-06-18 |
|
[ 328 ]
|
"Beyond 100G" OTUCn to OTLCn adaptation and commonality with n x 100G OTU4/OTL4 implementations
|
Cortina Systems, Inc.
|
Q11/15
|
2013-06-18 |
|
[ 327 ]
|
Logical Lane vs. Physical Lane Granularity and Rate selection for "Beyond 100G" Multilane OTL OTUCn interfaces
|
Cortina Systems, Inc.
|
Q11/15
|
2013-06-18 |
|
[ 326 ]
|
Reuse of 100G FECs for B100G
|
Cortina Systems, Inc.
|
Q11/15
|
2013-06-18 |
|
[ 323 ]
|
Interaction between GFEC and OTL4.10/OTL4.4
|
Cortina Systems, Inc.
|
Q6/15, Q11/15
|
2013-06-18 |
|
[ 320 ]
|
Frame format considerations for OTN Beyond 100G
|
PMC-Sierra, Inc.
|
Q11/15
|
2013-06-18 |
|
[ 318 ]
|
Updates to the Stair-Case Forward-Error-Correction Code for OTU4 & Beyond 100G Multi-Vendor IaDI "Black Link" and Beyond 100G IrDI
|
Cortina Systems, Inc.
|
Q6/15, Q11/15
|
2013-06-18 |
|
[ 317 ]
|
Parallel 40G SDH client adaptation model in G.798 for mapping into LO OPU3
|
Cortina Systems, Inc.
|
Q11/15
|
2013-06-18 |
|
[ 299 ]
|
Network media channel filtering considerations
|
Infinera Corporation
|
Q6/15, Q12/15, Q11/15
|
2013-06-17 |
|
[ 278 ]
|
Beyond 100G OTN relationships to IEEE Standardization Schedule
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2013-06-17 |
|
[ 277 ]
|
ODUflex hitless resizing beyond 100G
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2013-06-17 |
|
[ 276 ]
|
Multi-vendor IaDI
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2013-06-17 |
|
[ 273 ]
|
Timing for standardization of OTN beyond 100G
|
Alcatel-Lucent USA Inc.
|
Q6/15, Q11/15
|
2013-06-17 |
|
[ 255 ]
|
OTUCn/ODUCn proposal after Q11/15's Feb 2013 meeting
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 254 ]
|
N*100G flexible bit rate OTUCn proposal
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q11/15
|
2013-06-17 |
|
[ 228 ]
|
Extension of OTN hybrid equipment
|
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 227 ]
|
Enhancements of OTN hybrid equipment
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15, Q10/15
|
2013-06-17 |
|
[ 226 ]
|
Multilayer protocol stack of OTN interface
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 225 ]
|
Comparison of OTU4Cn vs OTUCn
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 224 ]
|
Beyond 100G use case and design considerations
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 223 ]
|
Answers to B100G questions from Q11/15 rapporteur (TD22/GEN)
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2013-06-17 |
|
[ 222 ]
|
Multi-carrier OCh signal and connection behaviour under optical layer faults
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 220 ]
|
OTM-1 multi vendor IaDI management capability requirements
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 219 ]
|
Proposal to add a description of a multi-carrier OCh for the transport of an OTUk
|
Huawei Technologies Co. Ltd.
|
Q14/15, Q11/15
|
2013-06-17 |
|
[ 217 ]
|
Use of BIP monitors behind a HD or SD FEC process
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 216 ]
|
Block diagram example of n x OTU4 and OTUCn framer
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 215 ]
|
Beyond 100G tributary slot structure considerations
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2013-06-17 |
|
[ 214 ]
|
Proposal to add HAO capable ODUflex to MPLS-TP adaptation function
|
Huawei Technologies Co. Ltd.
|
Q11/15, Q10/15
|
2013-06-17 |
|
[ 189 ]
|
Multilayer protocol stack of OTN interface
Withdrawn: Duplicate of C-0226
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q11/15
|
2013-06-17 |
|
[ 169 ]
|
B100G bit interleaving
|
ZTE Corporation
|
Q11/15
|
2013-06-17 |
|
[ 146 ]
|
Consideration on per-OCh monitor function for OTN beyond 100G interface
|
KDDI Corporation
|
Q11/15
|
2013-06-16 |
|
[ 126 ]
|
Proposed approach for work on OTN beyond 100G
|
ZTE Corporation
|
Q6/15, Q14/15, Q12/15, Q11/15
|
2013-06-15 |
|
[ 125 ]
|
Proposed model for the OTUCn and OCh layer for OTN beyond 100G
|
China Telecommunications Corporation
,
China Unicom
,
ZTE Corporation
|
Q6/15, Q14/15, Q12/15, Q11/15
|
2013-06-15 |
|
[ 110 ]
|
OTN Sec : Security for OTN beyond 100 Gbit/s
|
Applied Micro Circuits Corporation (AMCC)
|
Q11/15
|
2013-06-14 |
|
[ 98 ]
|
Considerations on flexible ODU and OTU overhead [SP7]
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 97 ]
|
Comparisons between single and multi OTUCm/OCh signal approaches [SP4, SP5]
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 96 ]
|
Considerations on B100G OTN multiplexing hierarchy [SP23]
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 95 ]
(Rev.1) |
Consideration on B100G OTN multiplexing
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 93 ]
|
Consideration on 400GE signal transmission over B100G OTN
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
Results:58 total items. Result page:
1 -
2
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):