Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 219 ]
+Ann.5-12 |
Chairman's Report of the Working Party 9B meeting (Geneva, 7-14 April 2003)
|
Chairman, WP 9B
|
|
2003-04-29 |
|
[ 218 ]
|
Final list of Participants
|
Director, BR
|
|
2003-04-11 |
|
[ 217 ]
|
Proposal for a preliminary draft new Recommendation ITU-R [9B/FS IMT-2000 ISN] - Use of the fixed service in the deployment of IMT-200 infrastructure networks
|
Germany (Federal Republic of)
|
221/9
|
2003-04-07 |
|
[ 216 ]
|
Liaison statement to ITU-R Study Group 6 Working Parties 6P, 6S, Task Group 6/9, Study Group 8, Working Party 9B, ITU-T SG9, IEC TC10, MPEG, SMPTE
|
Chairman, WP 6M
|
|
2003-04-03 |
|
[ 215 ]
|
List of documents issued
|
BRSGD
|
|
2003-04-04 |
|
[ 214 ]
|
Spectrum vision: World-wide standards for converged FWA + NWA
|
Alvarion
|
|
2003-04-03 |
|
[ 213 ]
|
Proposed new Annex 3 to Recommendation ITU-R F.1609
|
United States of America
|
212/9
|
2003-04-01 |
|
[ 212 ]
(Rev.1) |
Proposed Preliminary Draft New Recommendation ITU-R F.[HAPS-RRS] - Interference evaluation from fixed service system using high altitude platform stations (HAPS) to radio-relay system in the bands above 3 GHz
|
Korea (Republic of)
|
212/9
|
2003-04-01 |
|
[ 211 ]
|
Proposed revision of the working document on spectrum vision for the fixed service
|
Region 3 Coordinator for FS Vision CG
|
221/9
|
2003-03-31 |
|
[ 210 ]
|
Porposed modifications to draft new Question ITU-R [9A/DOEP] /9 and comments on preliminary draft new Recommendation ITU-R F.[9A/DOEP]
|
Japan
|
|
2003-03-31 |
|
[ 209 ]
|
Technical characteristics of broadband FWA systems conveying IP packets or ATM cells
|
Japan
|
220/9
|
2003-03-31 |
|
[ 208 ]
|
Spectrum vision for the fixed service
|
Japan
|
221/9
|
2003-03-31 |
|
[ 207 ]
|
Use of the fixed service in the deployment of IMT-2000 infrastructure networks
|
Japan
|
221/9
|
2003-03-26 |
|
[ 206 ]
|
Proposed modifications to Recommendation ITU-R F.1609 - An example of stochastic interference evaluation from a high altitude platform station to fixed wireless access systems in the 27.5-28.35 GHz band
|
Japan
|
212/9
|
2003-03-27 |
|
[ 205 ]
|
Proposal for a revision of Recommendation ITU-R F.1568 - Radio-frequency block arrangements for fixed wireless access systems in the range 10.15-10.3/10.5-10.65 GHz
|
Brazil (Federative Republic of)
|
136/9, 229/9
|
2003-03-25 |
|
[ 204 ]
|
Draft new Question - Characteristics of fixed wireless systems operating in frequency bands above about 60 GHz and associated sharing issues
|
United Kingdom of Great Britain and Northern Ireland
|
|
2003-03-21 |
|
[ 203 ]
|
Draft revision of Recommendation ITU-R F.384-7 - Radio-frequency channel arrangements for medium and high capacity analogue or digital radio-relay systems operating in the upper 6 GHz band
|
United Kingdom of Great Britain and Northern Ireland
|
136/9
|
2003-03-21 |
|
[ 202 ]
|
Spectrum vision for the Fixed Service
|
Region 2 Rapporteur
|
221/9
|
2003-03-21 |
|
[ 201 ]
|
Status of Questions assigned to WP 9B
|
Chairman, WP 9B
|
|
2003-03-20 |
|
[ 200 ]
|
Report of the fifth meeting - Geneva, 16-20 September 2002
|
Principal Rapporteurs, Joint Rapporteur Group
|
|
2003-02-27 |
|
[ 199 ]
|
Proposed modification of preliminary draft new Recommendation ITU-R F.[9B/Coordination-FWS] - A coordination process for area-licensed fixed wireless systems
|
Canada
|
231/9
|
2003-02-24 |
|
[ 198 ]
|
Draft revision of Recommendation ITU-R F.1401
|
Canada
|
|
2003-02-24 |
|
[ 197 ]
|
Report on reconsideration of DRR ITU-R F.1401: Frequency bands for FWA systems and the identification methodology
|
9B-FWA Correspondence Group
|
140/9, 215/8
|
2003-02-21 |
|
[ 196 ]
|
Liaison statement: Information Security Management System for Telecommunication use
|
ITU-T Study Group 17
|
|
2003-02-18 |
|
[ 195 ]
|
Reconsideration of Draft Revision of Recommendation ITU-R F.1401
|
Director, BR
|
|
2003-02-14 |
|
[ 194 ]
|
Report of the sixth meeting
|
JRG 8A-9B
|
|
2003-02-04 |
|
[ 193 ]
|
Liaison to ITU-R Working Parties 9A, 9B and 9D on Coexistence between ultra-wide band (UWB) applications and the fixed service
|
TG 1/8
|
|
2003-01-30 |
|
[ 192 ]
|
Liaison statement to WP 9B (copy to JRG 8A-9B for information) - Frequency bands for fixed wireless access (FWA) systems
|
WP 8A
|
140/9, 215/8
|
2002-10-03 |
|
[ 191 ]
|
Liaison statement to WP 9B (and copy to WP 8A for information) - Technical characteristics of broadband FWA systems conveying IP packets or ATM cells
|
JRG 8A-9B
|
|
2002-10-02 |
|
[ 190 ]
|
Liaison Statement to Working Party 9B (copy to Working Party 8A for information) - Frequency bands for fixed wireless access (FWA) systems
|
JRG 8A-9B
|
|
2002-09-20 |
|
[ 189 ]
|
Liaison statement to Working Party 8B - Correspondence Group on Dynamic frequency selection (DFS)
|
JRG 8A-9B
|
|
2002-09-17 |
|
[ 188 ]
|
Use of out-of-band and spurious domains
|
WP 1A
|
|
2002-08-06 |
|
[ 187 ]
|
Liaison statement to WPs 9A, 9B and 9D - Proposed deletion of Recommendation ITU-R SF.615-1
|
WP 4-9S
|
|
2001-10-01 |
|
[ 186 ]
|
Liaison statement to ITU-R Working Parties 1B, 4A, 6E, 6M, 7E, 8A, 8A, 8F, 9B, JRG 8A-9B and ITU-T SG 16 (Q.6/16)-Terrestrial wireless interactive multimedia applications (WRC-03)
|
JTG 1-6-8-9
|
|
2001-10-01 |
|
[ 185 ]
|
Liaison statement to ITU-R WP 9B - Response to ITU-R WP 9B liaison tracking to access network transport (ANT) work plan and standardization plan
|
ITU-T SG 15
|
|
2001-10-01 |
|
[ 184 ]
|
Liaison statement to Working Parties 4B and 9B and Joint Rapporteur Group 8A-9B - New versions of the access network transport (ANT) standardization plan and work plan
|
ITU-T SG 15
|
|
2001-10-01 |
|
[ 183 ]
|
Liaison statement to ITU-R Joint Task Group 1-6-8-9 - Terrestrial wireless interactive multimedia systems
|
WP 8A
|
|
2001-10-01 |
|
[ 182 ]
+Add.1 |
Chairman's Report of the Working Party 9B meeting (Geneva, 3-11 April 2002)
|
Chairman, WP 9B
|
|
2001-10-01 |
|
[ 181 ]
|
Results of the submissions from JRG 8A-9B on FWA to Working Parties 9B, 9D and Study Group 9
|
JRG 8A-9B
|
|
2001-10-01 |
|
[ 180 ]
|
Report of the fourth meeting of JRG 8A-9B (Geneva, 3-9 April 2002)
|
JRG 8A-9B
|
|
2001-10-01 |
|
[ 179 ]
|
Liaison from WP 4A
|
WP 4A
|
|
2001-10-01 |
|
[ 178 ]
|
Liaison statement to Working Parties 8A, 9B and 9D- Characteristics of FWA systems to be used in performing sharing studies
|
JRG 8A-9B
|
|
2001-10-01 |
|
[ 177 ]
|
Liaison statement to ITU-R WP 9B - Preliminary draft new Recommendation ITU-R F.[9A/DOEP] and preliminary draft new Question ITU-R [9A/DOEP]/9 - Diagnosis and optimization of the error performance of digital fixed wireless systems
|
WP 9A
|
|
2001-10-01 |
|
[ 176 ]
|
Liaison statement to WPs 8A and 9B - Draft revision of Recommendation ITU-R F.757-2
|
JRG 8A-9B
|
|
2001-10-01 |
|
[ 175 ]
|
Liaison statement to WP 9B - Preliminary draft revision to Recommendation ITU-R F.1520
|
WP 9D
|
|
2001-10-01 |
|
[ 174 ]
|
List of documents issued
|
BRSGD
|
|
2001-10-01 |
|
[ 173 ]
|
Frequency bands used for FWA systems
|
Israel (State of)
|
|
2001-10-01 |
|
[ 172 ]
|
Review of the term "radio-relay" in the texts within WP 9B
|
Correspondence Group on Terminology
|
|
2001-10-01 |
|
[ 171 ]
|
Compatibility between Earth Exploration Satellite System (passive) operating in the band 31.3-31.5 GHz and Fixed Service Systems operating in the band 31.0-31.3 GHz
|
France
|
|
2001-10-01 |
|
[ 170 ]
|
Revision of Recommendation ITU-R F.746-5 concerning Channel arrangements for FS systems in the band 31.0-31.3 GHz
|
France
|
|
2001-10-01 |
Resultados :219 documentos Resultados :
1 -
2 -
3 -
4 -
5
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):