International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP4A  C 

ITU-R R23-WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:158 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 58 ]  
 
Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)     United States   AI1.3   2024-04-18
[ 57 ]  
 
Proposed draft reply liaison statement to Working Party 7C - Relevant technical information for sharing studies under WRC-27 agenda item 1.19     United States   AI1.19   2024-04-18
[ 56 ]  
 
Proposed draft reply liaison statement to Working Party 5D - Relevant technical information for sharing studies under WRC-27 agenda item 1.7     United States   AI1.7   2024-04-18
[ 55 ]  
 
Potential Handbook outline on best practices for sustainable use of radio frequency spectrum and associated orbits [HANDBOOK SPACE SUSTAINABILITY]     United States     2024-04-18
[ 54 ]  
 
Update to Report ITU-R S.2515-0     United States     2024-04-18
[ 53 ]  
 
Further work to study the alpha-table methodology and its use in Recommendation ITU-R S.1503     United Kingdom     2024-04-17
[ 52 ]  
 
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to enhance protection and sustainable development of broadcasting-satellite service in Regions 1 and 3 Plan band by addressing the significant discrepancies between service area and coverage area of networks operating as Region 2 fixed-satellite service in the frequency band 11.7-12.2 GHz     Iran (Islamic Republic of)   AI7   2024-04-17
[ 51 ]  
 
Proposed input on elements of the reply liaison statement to Working Party 7D on WRC-27 agenda item 1.16     South Africa   AI1.16   2024-04-17
[ 50 ]  
 
Proposed structure for the draft Report on RR Article 22 epfd limits     Luxembourg     2024-04-17
[ 49 ]  
 
Proposed liaison statement and Working Party 4A workplan regarding WRC-27 agenda item 1.1     Luxembourg   AI1.1   2024-04-17
[ 48 ]  
 
Proposed parameters regarding ESIMs to be used for studies under WRC-27 agenda item 1.1     Luxembourg   AI1.1   2024-04-17
[ 47 ]  
 
Comparison of current GSO links in Ku band with links used for the epfd derivation     Luxembourg     2024-04-17
[ 46 ]  
 
Proposed annex to working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO]     China     2024-04-17
[ 45 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO]     China     2024-04-17
[ 44 ]  
 
Proposed studies on Resolution 35 (Rev.WRC-23)     China     2024-04-17
[ 43 ]  
 
Proposed topic to be considered under WRC-23 agenda item 7 to develop possible regulatory measures to implement RR No. 4.4     China   AI7   2024-04-17
[ 42 ]  
 
A proposed questionnaire on the current status and future plan of FSS satellite networks/systems in the Q/V band for WRC-27 agenda item 1.6     China   AI1.6   2024-04-17
[ 41 ]  
 
Consideration on the preparations for WRC-27 agenda item 1.5     China   AI1.5   2024-04-17
[ 40 ]  
 
Proposal on working document towards a preliminary draft new Report ITU-R S.[SHARING AND COMPATIBILITY STUDIES ON FSS/BSS IN 17.3-17.7/17.8 GHZ FOR R3] - WRC-27 agenda item 1.4     China   AI1.4   2024-04-17
[ 39 ]  
(Rev.1) 
Considerations on preparations for WRC-27 agenda item 1.3     China   AI1.3   2024-04-17
[ 38 ]  
 
Proposal on the studies under WRC-27 agenda item 1.2     China   AI1.2   2024-04-17
[ 37 ]  
 
Proposed draft liaison statements to contributing Working Parties regarding WRC-27 agenda item 1.1     China   AI1.1   2024-04-17
[ 36 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[STUDIES OF ARTICLE 22 MECHANISM]     Burundi , Cameroon , Chad , Congo (Republic of the) , Democratic Republic of the Congo , Gabon , Guinea , Sao Tome and Principe     2024-04-17
[ 35 ]  
 
Medium Earth orbit earth station parameters for studies to be conducted under WRC-27 agenda item 1.3     SES   AI1.3   2024-04-16
[ 34 ]  
 
Amendments to working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO] - Methodology to assess the average throughput degradation and unavailability increase between non-geostationary FSS satellite system     Samoa     2024-04-12
[ 33 ]  
 
Workplan for WRC-27 agenda item 1.1     Germany   AI1.1   2024-04-12
[ 32 ]  
 
Proposed Working document on WRC-27 agenda item 1.1     Germany   AI1.1   2024-04-12
[ 31 ]  
 
Proposed liaison statement to contributing Working Parties of WRC-27 agenda item 1.1     Germany   AI1.1   2024-04-12
[ 30 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations     Russian Federation     2024-04-11
[ 29 ]  
 
Preliminary materials to support the study under WRC-27 agenda item 1.5     Kazakhstan , Russian Federation   AI1.5   2024-04-11
[ 28 ]  
 
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to restrain the use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time     Korea (Rep. of)   AI7   2024-04-11
[ 27 ]  
 
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to limit the practice of introducing a completely different orbital plane for non-geostationary-satellite systems that is not foreseen to be required for operation of the constellation     Korea (Rep. of)   AI7   2024-04-11
[ 26 ]  
 
Working document towards a preliminary draft revision to Report ITU-R BO.2029     Japan     2024-04-09
[ 25 ]  
 
Provisions to be possibly reviewed under WRC-27 agenda item 1.4     Japan   AI1.4   2024-04-10
[ 24 ]  
 
Liaison statement to Working Parties 4A and 4C (copy to Working Parties 3J, 3M, 5A, 5B, and 5C for information) - WRC-27 agenda item 1.18     WP 7D   AI1.18   2024-03-28
[ 23 ]  
 
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18     WP 7D   AI1.18, AI1.16   2024-03-28
[ 22 ]  
 
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16     WP 7D   AI1.16   2024-03-28
[ 21 ]  
 
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 7B   AI1.15   2024-03-27
[ 20 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7     WP 7B   AI1.7   2024-03-27
[ 19 ]  
 
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Information on active and passive sensors in the EESS for WRC-27 agenda item 1.8     WP 7C   AI1.8   2024-03-26
[ 18 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.17     WP 7C   AI1.17   2024-03-25
[ 17 ]  
 
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 5C, 5D, 7A and 7B (copy to ICAO for information) - WRC-27 agenda item 1.19     WP 7C   AI1.19   2024-03-25
[ 16 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7     WP 7C   AI1.7   2024-03-25
[ 15 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5B, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18     WP 7C   AI1.18   2024-03-25
[ 14 ]  
 
Liaison statement to Working Parties 3J, 3M (copy to Working Parties 4A, 4C, 5A, 5B and 5C) - Propagation aspects related to WRC-27 agenda item 1.18     WP 7C   AI1.18   2024-03-25
[ 13 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B (copy to Working Parties 5C, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18     WP 7C   AI1.18   2024-03-25
[ 12 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C and 7D for information) - WRC-27 agenda item 1.3     WP 7C   AI1.3   2024-03-25
[ 11 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D for information) - WRC-27 agenda item 1.1     WP 7C   AI1.1   2024-03-25
[ 10 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6     WP 6A   AI1.6   2024-03-18
[ 9 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10     WP 6A   AI1.10   2024-03-18
Results:158 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-07-22