International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP7C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP7C  C 

ITU-R R23-WP7C

Remote Sensing Systems

Results:156 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 56 ]  
 
Liaison statement to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D (copy to Working Party 7C for information) - Information to support studies under WRC-27 agenda item 1.1     WP 4A   AI1.1   2024-05-13
[ 55 ]  
 
Liaison statement to Working Parties 5A, 5C, 3M and 7D (copy to Working Party 7C) - WRC-27 agenda item 1.3     WP 4A   AI1.3   2024-05-13
[ 54 ]  
 
Liaison statement to Working Parties 3M, 5A, 5B, 5C, 6B and 7C (copy to Working Party 4B for information) - WRC-27 agenda item 1.4 (copy to Working Party 4B for information)     WP 4A   AI1.4   2024-05-13
[ 53 ]  
 
Liaison statement to Working Parties 3M, 5B, and 7B (copy to Working Parties 5A, 5C, 7A and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2     WP 4A   AI1.2   2024-05-13
[ 52 ]  
 
Reply liaison statement to Working Party 7C on EESS-RNSS matters     WP 4C   Q288/4, Q217/4   2024-05-02
[ 51 ]  
 
Liaison statement to Working Parties 3L, 4B, 5A, 5C, 5D, 7B, and 7C (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.14     WP 4C   AI1.14   2024-05-01
[ 50 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13     WP 4C   AI1.13   2024-05-01
[ 49 ]  
 
Liaison statement to Working Parties 3L, 3M, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.12     WP 4C   AI1.12   2024-05-01
[ 48 ]  
 
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D - WRC-27 agenda item 1.11     WP 4C   AI1.11   2024-05-01
[ 47 ]  
 
Reply liaison statement to Working Party 7C regarding WRC-27 agenda item 1.17 - Technical information to support studies under WRC-27 agenda item 1.17     WP 4C   AI1.17   2024-05-01
[ 46 ]  
 
Reply liaison statement to Working Parties 7C and 7D WRC-27 agenda item 1.18 - Technical information to support studies under WRC-27 agenda item 1.18     WP 4C   AI1.18   2024-05-01
[ 45 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chair, CCV     2024-04-22
[ 44 ]  
 
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 7B   AI1.15   2024-03-27
[ 43 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7     WP 7B   AI1.7   2024-03-27
[ 42 ]  
 
Liaison statement out to key SDOs on the publication of GR THz 001 and GR THz 002     ETSI     2024-03-27
[ 41 ]  
+Ann.1-19 
Report of the meeting of Working Party 7C (Geneva, 18-22 March 2024)     Acting Chair, WP 7C     2024-03-22
[ 40 ]  
 
Final list of participants - Working Party 7C (Geneva, 18-22 March 2024)     Director, BR     2024-03-22
[ 39 ]  
 
Note to CPM Steering Committee (copy to Working Parties 3M, 4B, 5A, 5B, 5C and 7C) - WRC-27 agenda item 1.4     Acting Chair, WP 6B   AI1.4   2024-03-20
[ 38 ]  
(Rev.1) 
List of documents issued (Documents 7C/1 - 7C/39)     BR, Study Groups Department     2024-03-18
[ 37 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6     WP 6A   AI1.6   2024-03-18
[ 36 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10     WP 6A   AI1.10   2024-03-18
[ 35 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5A, 5C, 6B, 7A, 7C and 7D for information) - Role of powerline telecommunications in home-networking     WP 6A     2024-03-18
[ 34 ]  
 
Liaison statement to CPM Management Team (copy to Working Parties 3L, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.11     WP 6A   AI1.11   2024-03-18
[ 33 ]  
 
Liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.13     WP 6A   AI1.13   2024-03-18
[ 32 ]  
 
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17     WP 6A   AI1.17   2024-03-18
[ 31 ]  
 
Proposed revision to Report ITU-R RS.2489-0 - Technical and operational characteristics of ground-based passive sensors operating in the 51-58 GHz frequency range     France , Switzerland     2024-03-06
[ 30 ]  
 
Update of the "ITU/WMO Handbook on use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" (Edition 2017) - Chapter 7     France     2024-03-06
[ 29 ]  
 
Preliminary position on WRC-27 agenda     WMO     2024-03-06
[ 28 ]  
 
Proposed update to the list of contributors to the work on updating the "ITU/WMO Handbook on use of radio spectrum for meteorology" and proposed way of working     Chair, SG 7     2024-03-06
[ 27 ]  
 
Status of issues related to EESS (passive) above 86 GHz     European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellites     2024-03-06
[ 26 ]  
 
Preliminary draft new Report on interference in the 18.6-18.6 GHz band     European Space Agency (ESA)     2024-03-06
[ 25 ]  
 
SST measurements in the bands 4.2-4.4 and 8.4-8.5 GHz     European Space Agency (ESA)     2024-03-06
[ 24 ]  
 
Draft liaison statement on WRC-27 agenda item 1.19     European Space Agency (ESA)   AI1.19   2024-03-06
[ 23 ]  
 
Updates to preliminary draft new Report ITU-R - Analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections     Institute of Electrical and Electronics Engineers, Inc. (IEEE)     2024-03-05
[ 22 ]  
 
Organization of the work for WRC-27 agenda item related to Earth exploration-satellite service under Working Party 7C     Mexico   AI1.7, AI1.19   2024-03-05
[ 21 ]  
 
Proposed liaison statements to contributing groups on WRC-27 agenda item 1.18     European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellites   AI1.18   2024-03-01
[ 20 ]  
 
Proposed liaison statement to Working Party 5B on WRC-27 agenda item 1.8     European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellites   AI1.8   2024-03-01
[ 19 ]  
 
Draft liaison statement to Working Party 4A related to WRC-27 agenda item 1.1     European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellites   AI1.1   2024-03-01
[ 18 ]  
 
Draft liaison statement to Working Party 4A related to WRC-27 agenda item 1.3     European Space Agency (ESA) , European Organisation for the Exploitation of Meteorological Satellites   AI1.3   2024-03-01
[ 17 ]  
 
Draft liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D related to WRC-27 agenda item 1.17     European Space Agency (ESA)   AI1.17   2024-03-01
[ 16 ]  
 
Proposed work plan for WRC-27 agenda item 1.17     European Space Agency (ESA)   AI1.17   2024-03-01
[ 15 ]  
 
Proposed draft liaison statement to Working Parties 4A, 5A, 5B, 5C, 5D and 7B (copy to Working Party 3M for information) - Preparation for WRC-27 agenda item 1.19     Japan   AI1.19   2024-03-01
[ 14 ]  
 
Proposed draft liaison statement to Working Parties 4A, 4C, 5A, 5B and 5C (copy to Working Parties 3J and 3M for information) - Preparation for WRC-27 agenda item 1.18 (resolves 1)     Japan   AI1.18   2024-03-01
[ 13 ]  
 
Proposals for working document towards a preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors     Japan     2024-03-01
[ 12 ]  
 
Proposed liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Preparations for WRC-27 agenda item 1.17     Japan   AI1.17   2024-03-01
[ 11 ]  
 
Proposed liaison statement and Working Party 7C work plan regarding WRC-27 agenda item 1.17     United States   AI1.17   2024-02-28
[ 10 ]  
 
Proposed draft liaison statement to Working Parties 3J, 3M, 4A, 4C, 5A, 5B and 5C relating to WRC-27 agenda item 1.18     United States   AI1.18   2024-02-28
[ 9 ]  
 
Proposed draft reply liaison statement to Working Party 5D relating to WRC-27 agenda item 1.7     United States   AI1.7   2024-02-28
[ 8 ]  
 
Draft revision of Report ITU-R RS.2310-1 - Worst-case interference levels from mainlobe-to-mainlobe antenna coupling of systems operating in the radiolocation service into active sensor receivers operating in the Earth exploration-satellite service (active) in the 35.5-36.0 GHz band     United States     2024-02-28
[ 7 ]  
 
Preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections     United States     2024-02-28
Results:156 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-10-08