International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN GSI : Meeting 2006-10-24 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN GSI  C (2006-10-24) 

ITU-T NGN GSI

NGN Global Standards Initiative

Study Period 2005

Meeting  from 2006-10-24 to 2006-11-03

held in Switzerland [Geneva]

Other Meetings : 2008-09-01  2008-05-12  2008-01-14  2007-09-11  2007-04-16  2007-01-08  2006-07-17  2006-04-22  2006-01-16 

Results:256 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 156 ]  
 
Some additional texts for convergence terminal capabilities to Y.ctmp     Korea (Republic of)   Q8/13   2006-10-16
[ 155 ]  
 
Proposed texts for signaling architecture in Y.ipv6sig     Korea (Republic of)   Q9/13   2006-10-16
[ 154 ]  
 
Proposed modification on Y.emsim     Korea (Republic of)   Q7/13   2006-10-16
[ 153 ]  
 
Proposed new draft Recommendation on "best effort IP network evolution to NGN"     Korea (Republic of)   Q7/13   2006-10-16
[ 152 ]  
 
Proposal for initial draft Recommendation "Recovery Requirements and Capabilities in NGN Environments"     Korea (Republic of)   Q2/13   2006-10-16
[ 151 ]  
 
Proposed Modifications to Y.cgoe-compts (Carrier grade open environment components)     NEC   Q16/13   2006-10-16
[ 150 ]  
 
Proposed modifications on General requirements for NGN multicast services of ITU-T Y.ngn-mcastsf     ETRI   Q2/13   2006-10-16
[ 149 ]  
 
Proposed modifications of End-to-end NGN multicast service scenario in Y.ngn-mcastsf     ETRI   Q2/13   2006-10-16
[ 148 ]  
 
Addition of QoS end-to-end requirements in Y.e2eqos     Motorola, Inc.   Q4/13   2006-10-16
[ 147 ]  
 
OMA work on Converged IP Messaging     Motorola Inc.   Q1/11, Q2/11, Q1/13, Q2/13, Q3/13, Q6/13, Q2/19, Q5/19   2006-10-16
[ 146 ]  
 
Next steps in Converged Services Framework Standardization in ITU-T     Motorola, Inc.   Q2/11, Q1/11, Q1/13, Q2/13, Q3/13, Q6/13, Q2/19, Q5/19   2006-10-16
[ 145 ]  
 
CSF Requirements vs. Use Case Analysis     Motorola, Inc. , Cisco Systems   Q3/13   2006-10-16
[ 144 ]  
 
Proposed modifications to Appendix I of draft Recommendation Y.csf (v2.0) - CSF example use cases     Motorola, Inc.   Q3/13   2006-10-16
[ 143 ]  
 
Proposed modifications for draft Recommendation Y.csf (v2.0)     Motorola, Inc. , Cisco Systems   Q3/13   2006-10-16
[ 142 ]  
 
Revised scope section in Y.csf     Motorola, Inc. , Cisco Systems   Q3/13   2006-10-16
[ 141 ]  
 
Recommendation Y.csf - proposed as a release independent document     Motorola, Inc.   Q3/13   2006-10-16
[ 140 ]  
 
Preparation of Y.csf for Consent     Motorola, Inc. , Korea Telecom   Q3/13   2006-10-16
[ 139 ]  
 
Draft Recommendation Y.csf (v2.1) - Editors' proposed version as baseline     Co-editors   Q3/13   2006-10-16
[ 138 ]  
 
Development models of network aspects of identification including RFID (N-ID) and proposal on approach for the standardization     NTT , NTT Comware Corporation   Q2/13   2006-10-16
[ 137 ]  
 
Input to the draft Recommendation Y.SecMechanisms on the GBA procedures     Lucent Technologies   Q15/13   2006-10-16
[ 136 ]  
 
Progression of Y.NGN-ET-Tech     Rapporteur, Q.3/13   Q3/13   2006-10-16
[ 135 ]  
 
Editorial Changes to draft Recommendation Y.NGN-ET-TECH     Co-Editor   Q3/13   2006-10-16
[ 134 ]  
 
Implementing NGN Identity Management     VeriSign, Inc.   Q15/13   2006-10-16
[ 133 ]  
 
Proposed Modification to Y.2701 Security Requirements for NGN Release 1     Nortel   Q15/13   2006-10-13
[ 132 ]  
 
Proposed modifications to Q.rcp.3 Rw Profile Annex B H.248 Alternative     NEC Corporation   Q5/11   2006-10-13
[ 131 ]  
 
Proposal for draft recommendation of splitting IP into Identifier and Locator in NG     ETRI   Q7/11, Q3/13   2006-10-13
[ 130 ]  
 
Proposed Modifications to Y.emsim     NEC Corporation   Q7/13   2006-10-13
[ 129 ]  
 
Proposed modification for Call-ID header on NNI signalling profile     ETRI   Q3/11   2006-10-13
[ 128 ]  
 
Proposal for modification of SDP profile in NNI profile     ETRI   Q3/11   2006-10-13
[ 127 ]  
 
Proposal for adding "P-Early-Media" header to extended headers in NNI profile     ETRI   Q3/11   2006-10-13
[ 126 ]  
 
Comments on the Media Availability in a SIP session     ETRI   Q3/11   2006-10-13
[ 125 ]  
 
Some editorial comments and typo error correction of NGN NNI Signalling Profile     ETRI   Q3/11   2006-10-13
[ 124 ]  
 
Proposed modifications for Proxy behaviour on NNI signalling profile     ETRI   Q3/11   2006-10-13
[ 123 ]  
 
Y.flowreq section 6.5     BT Group   Q4/13   2006-10-13
[ 122 ]  
 
Y.flowreq baseline text     Editor   Q4/13   2006-10-13
[ 121 ]  
 
Proposed an Active Flow Identification for CPEs without Flow-state-aware capability     ETRI   Q4/13   2006-10-13
[ 120 ]  
 
Proposed an Indication for Data Packets of Flow-State-Aware Capable Sources     ETRI   Q4/13   2006-10-13
[ 119 ]  
 
Proposed Flow Aggregation for Y.flowreq     ETRI   Q4/13   2006-10-13
[ 118 ]  
 
Proposed an Endpoint Admission Control for Y.flowreq     ETRI   Q4/13   2006-10-13
[ 117 ]  
 
Technical Paper on Service Mobility for new Multimedia Service Architecture (Rev. 0.7)     Rapporteur, Q.29/16   Q6/13, Q2/19, Q29/16   2006-10-13
[ 116 ]  
 
Some Proposals to complete the Draft FMC_Req     Huawei Technologies Co., Ltd. , China Mobile   Q6/13, Q5/19, Q2/19   2006-10-13
[ 115 ]  
 
Proposed modifications to time dependent routing service feature in Y.ngn- upt     Huawei Technologies Co., Ltd   Q2/13   2006-10-13
[ 114 ]  
(Rev.1) 
Proposal to add UPT-based Address Resolution service feature to Y.ngn- upt     Huawei Technologies Co., Ltd.   Q2/13   2006-10-13
[ 113 ]  
 
Proposal to Add Services Combination Scenario to Y.wsconv     Huawei Technologies Co., Ltd.   Q8/13   2006-10-13
[ 112 ]  
 
Proposal to add Service Combination Functional Requirements to Y.ngn- openenv     Huawei Technologies Co., Ltd.   Q2/13   2006-10-13
[ 111 ]  
 
Proposal to add one of service development support functional requirements to Y.ngn-openenv     Huawei Technologies Co., Ltd.   Q2/13   2006-10-13
[ 110 ]  
(Rev.1) 
Proposal to add flexible service provisioning requirement to Y.ngn-openenv     Huawei Technologies Co., Ltd.   Q2/13   2006-10-13
[ 109 ]  
 
Proposal to add content management requirement to Requirements and Capabilities for ITU-T NGN Release 2     Huawei Technologies Co., Ltd.   Q2/13   2006-10-13
[ 108 ]  
 
Add Customized background tone message flow     Huawei Technologies Co., Ltd.   Q2/13   2006-10-13
[ 107 ]  
 
Add content Screening into Y.wsconv     Huawei Technologies Co., Ltd.   Q8/13   2006-10-13
Results:256 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-27