International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2006-02-06 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D (2006-02-06) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2006-02-06 to 2006-02-17

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2008-02-11  2007-06-04  2006-10-30  [ 2006-02-06 ]  2005-05-16  2004-11-29 

Results:217 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
Delayed Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 573 ]  
 
Enhancement of LCAS SDL diagrams in G.7042/Y.1305     Huawei   Q11/15   2006-01-27
[ 572 ]  
 
Enhancement of LCAS process in G.7042/Y.1305     Huawei   Q11/15   2006-01-27
[ 571 ]  
 
Dynamic Transmitting Power Adaptation     Huawei   Q4/15   2006-01-27
[ 570 ]  
 
Modified Proposal for a Crosstalk Reduction Method on Channel Discovery Phase     Huawei   Q4/15   2006-01-27
[ 569 ]  
 
Comments on H248/MGCP management in OMCI     Huawei   Q2/15   2006-01-27
[ 568 ]  
 
Proposal to include non dispersion compensated applications in G.dapp2     ZTE   Q6/15   2006-01-26
[ 567 ]  
 
Proposal to include 32 and 40 channels in G.959.1     ZTE   Q6/15   2006-01-26
[ 566 ]  
 
Proposal for supporting the application codes of P1L1-2D2E and 1L1-2D2FE in G.959.1     ZTE   Q6/15   2006-01-26
[ 565 ]  
 
Proposal for Definitions of Reference Points in Clause 6 for G.otf     ZTE   Q6/15   2006-01-26
[ 564 ]  
 
Proposal for clarifying the definition of optical path penalty in G.959.1     ZTE   Q6/15   2006-01-26
[ 563 ]  
 
Proposal for including application codes of multichannel long-haul span transmission in G.959.1     ZTE   Q6/15   2006-01-26
[ 562 ]  
 
Transport Resource Address management in ASON     ZTE   Q12/15   2006-01-26
[ 561 ]  
 
The extension of label in GMPLS     ZTE   Q14/15   2006-01-26
[ 560 ]  
 
Multi-domain call and connection in ASON     ZTE   Q12/15   2006-01-26
[ 559 ]  
 
Proposal to modify the C-Type of FLOWSPEC object and SENDER_TSPEC object in Table2 of G.7713.2/Y.1704.2     ZTE   Q14/15   2006-01-26
[ 558 ]  
 
Contribution on adaptive chromatic dispersion compensator implementation     ZTE   Q7/15   2006-01-26
[ 557 ]  
 
Comments on SPC activation/deactivation functions     ZTE , China Mobile   Q14/15, Q12/15   2006-01-26
[ 556 ]  
 
Comments on application code 1V1-2C2F parameters of G.959.1     ZTE   Q6/15   2006-01-26
[ 555 ]  
 
Proposal of updating G.8121 for Transport MPLS and PWE3 support     Fujitsu   Q12/15, Q9/15   2006-01-26
[ 554 ]  
 
Proposal on additional state transition tables in G.8031 (1+1 Bi-directional)     Fujitsu   Q9/15   2006-01-26
[ 553 ]  
 
Proposed text for "Principle of operation of 1-phase protocol" in G.8031     Fujitsu   Q9/15   2006-01-26
[ 552 ]  
 
Comments and proposed update to G.8031     Fujitsu   Q9/15   2006-01-26
[ 551 ]  
 
Secure Ethernet VLANs for Multi-domain MCN and SCN for Transport MPLS and Ethernet Layer Networks     Fujitsu   Q14/15, Q12/15, Q9/15   2006-01-26
[ 550 ]  
 
Addition of OAM to Transport MPLS Architecture and Equipment - G.8110.1 and G.8121     Fujitsu   Q12/15, Q9/15   2006-01-26
[ 549 ]  
 
Proposal for characterizing transient response of optical amplifier systems from an aspect of WDM signal transmission     NTT   Q7/15   2006-01-26
[ 548 ]  
 
Proposal for characterizing transient response of optical amplifier systems in time domain     NTT   Q7/15   2006-01-26
[ 547 ]  
 
VLAN Switching (Cross-Connect)     Siemens AG   Q12/15   2006-01-26
[ 546 ]  
 
Proposed editorial modification for G.pactiming     Alcatel   Q13/15   2006-01-26
[ 545 ]  
(Rev.1) 
Proposed modification of F12 G.pactiming     Alcatel   Q13/15   2006-01-26
[ 544 ]  
 
Wander proposal for Annex A Case 2A of G.pactiming     Alcatel   Q13/15   2006-01-26
[ 543 ]  
 
Proposal for how to study the standardization of Home Network interfaces     NTT   Q1/15   2006-01-26
[ 542 ]  
 
Proposal of adjustments among SDH Recommendations concerning automatic discovery function     NTT   Q14/15, Q11/15, Q9/15   2006-01-25
[ 541 ]  
(Rev.1) 
Proposal of SDH overhead byte description in G.7714.1     NTT   Q14/15, Q11/15, Q9/15   2006-01-25
[ 540 ]  
 
Proposed Updates to G.7715 on RC-RC Communications for Route Query     Cisco   Q11/15, Q12/15, Q14/15   2006-01-25
[ 539 ]  
 
Proposed Additional form for components Interactions for Connection Setup in G.8080     Cisco   Q11/15, Q12/15, Q14/15   2006-01-25
[ 538 ]  
 
Contribution to Q11/15 regarding Implementing Ultra-High Rate Services with OTN Virtual Concatenation     Lucent , Deutsche Telekom , Alcatel (Germany) , Nortel Networks (UK)   Q11/15   2006-01-26
[ 537 ]  
 
Modelling Aggregation     Tellabs   Q12/15   2006-01-26
[ 536 ]  
 
New application code in G.959.1 based on adaptive PMD compensation     NTT   Q7/15, Q6/15, Q5/15   2006-01-25
[ 535 ]  
 
G.vdsl2: Interleaver reconfiguration: protocol & activation     Ikanos   Q4/15   2006-01-25
[ 534 ]  
 
G.vdsl2: Simultaneous use of U0 and U1     Ikanos   Q4/15   2006-01-25
[ 533 ]  
 
G.vdsl2, G.ploam: Proposal for a primitive and a parameter to monitor impulsive noise in the line     Infineon   Q4/15   2006-01-25
[ 532 ]  
 
Proposed text on relevant weather parameters and effects in G.fso     India   Q6/15   2006-01-25
[ 531 ]  
 
Proposed text for safety aspects in clause 7) for draft new Recommendation G.fso     India   Q6/15   2006-01-25
[ 530 ]  
 
Proposed terms & definitions for clause 3) & 4) and parametric table for clause 6) of G.fso     India   Q6/15   2006-01-25
[ 529 ]  
 
Proposed additional terms and definitions relevant but not essential to CLC in draft Recommendation G.fso     India   Q6/15   2006-01-25
[ 528 ]  
 
Effect of weather on crosstalk in clause 6.2/G.fso     India   Q6/15   2006-01-25
[ 527 ]  
 
Addition of Control Channel Management Component in G.8080     Etri   Q14/15   2006-01-25
[ 526 ]  
 
Architecture and Requirements of Control Channel Management for ASON     Etri   Q14/15   2006-01-25
[ 525 ]  
 
Characterization of Ethernet Frame Delay Variation using Time and Frequency Statistical Metrics     Nortel Networks (Canada)   Q13/15   2006-01-25
[ 524 ]  
 
Simulation and Test Configurations for Clock Synchronization over Packet Networks     Nortel Networks (Canada)   Q13/15   2006-01-25
Results:217 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2006-02-02