International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2018-10-08 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2018-10-08) 

ITU-T SG 15

Transport, access and home

Study Period 2017

Meeting  from 2018-10-08 to 2018-10-19

held in Switzerland [Geneva]

Other Meetings : 2021-12-06  2021-04-12  2020-09-07  2020-01-27  2019-07-01  2018-01-29  2017-06-19 

Results:409 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1053 ]  
 
The effect of time accuracy caused by optical module latency     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q6/15, Q13/15, Q11/15   2018-09-25
[ 1052 ]  
 
Proposal of T-BC class C specification     Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2018-09-25
[ 1051 ]  
 
G.mgfast: Introducing QoS-awareness at the gamma reference point     ADTRAN (United States) , Nokia Corporation (Finland)   Q4/15   2018-09-25
[ 1050 ]  
 
G.lt: Accuracy requirements for MELT test voltages     ADTRAN (United States)   Q4/15   2018-09-25
[ 1049 ]  
 
G.mgfast: QoS and DTU time stamping     ADTRAN (United States)   Q4/15   2018-09-25
[ 1048 ]  
 
G.int: Update of G.999.1 working text     ADTRAN (United States)   Q4/15   2018-09-25
[ 1047 ]  
 
G.fast: Comments on the Draft Technical Paper about NT software upgrade     ADTRAN (United States)   Q4/15   2018-09-25
[ 1046 ]  
 
NNAI (CLI/CPND) in ITU-T Recommendation G.7718 Framework for ASON management     Russian Federation   Q14/15   2018-09-25
[ 1045 ]  
 
OSNR definition in G.698.2     Huawei Technologies Co., Ltd. (China)   Q6/15   2018-09-25
[ 1044 ]  
 
G.mgfast: On the trade-off between resource saving and FDMA update speed for G.mgfast P2MP transmission across homes     Nokia Corporation (Finland)   Q4/15   2018-09-25
[ 1043 ]  
 
Considerations about media element & media subnetwork definition in G.media & G.media-mgmt     Huawei Technologies Co., Ltd. (China)   Q14/15, Q12/15   2018-09-25
[ 1042 ]  
 
G.fast: Update of working text for Targeted Generalized Vectoring with active G.9701 supporting lines (TGVA)     Nokia Corporation (Finland)   Q4/15   2018-09-25
[ 1041 ]  
 
Proposed improvements of draft Recommendation L.cci responding to the Rapporter's proposal for improvements in TD111(WP2)     Waseda University (Japan)   Q16/15   2018-09-25
[ 1040 ]  
(Rev.1) 
G.fast: Update of working text for extended probelength in G.fast     Broadcom Corporation (United States) , Intel Corporation (United States) , Nokia Corporation (Finland)   Q4/15   2018-09-25
[ 1039 ]  
 
The considerations on the distributed time synchronization (DTS) and cnPRTC     China Mobile Communications Corporation   Q13/15   2018-09-25
[ 1038 ]  
 
Text proposal for the introduction and background clause of G.ctn5g     ZTE Corporation (China)   Q11/15   2018-09-25
[ 1037 ]  
(Rev.1-3) 
Proposal of new work Item for SCL layer network of Slicing Packet Network     Broadcom Corporation (United States) , China Mobile Communications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Microsemi Corporation (United States) , Ministry of Industry and Information Technology (MIIT) (China) , Telefónica S.A. (Spain) , Viavi Solutions Deutschland GmbH (Germany) , Xilinx Incorporation (United States) , ZTE Corporation (China)   Q11/15   2018-09-25
[ 1036 ]  
 
Proposal of new work item on new OAM tools for SCL layer network     China Mobile Communications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2018-09-25
[ 1035 ]  
 
Proposal to initiate a new work item on the draft of Recommendation G.8152.1 for MPLS-TP OAM information/data model     China Mobile Communications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q14/15   2018-09-25
[ 1034 ]  
 
A proposal to initiate a new work item on Management Aspects for SPN     China Mobile Communications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q14/15, Q12/15   2018-09-25
[ 1033 ]  
 
Proposal to initiate a new work item on the draft of Recommendation G.8152.2 for MPLS-TP resilience information/data model     China Mobile Communications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q14/15   2018-09-25
[ 1032 ]  
 
G.fast: ATP increase and CPE behaviour     British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom)   Q4/15   2018-09-25
[ 1031 ]  
 
Proposal on adding the contents of C.659 and C.660 into draft L.oha     FiberHome Technologies Group (China)   Q16/15   2018-09-25
[ 1030 ]  
 
SPN application in energy grid     ZTE Corporation (China)   Q11/15   2018-09-25
[ 1029 ]  
 
Proposal for SCL OAM     China Mobile Communications Corporation , ZTE Corporation (China)   Q11/15   2018-09-25
[ 1028 ]  
 
Consideration on Configuration and Performance Management in G.media and G.mediamgmt     Huawei Technologies Co., Ltd. (China)   Q14/15, Q12/15   2018-09-25
[ 1027 ]  
 
Considerations on M-OTN solution for 5G fronthaul     ZTE Corporation (China)   Q11/15   2018-09-25
[ 1026 ]  
 
Considerations on M-OTN solution for 5G backhaul     ZTE Corporation (China)   Q11/15   2018-09-25
[ 1025 ]  
 
Potential M-OTN solution for 5G transport network     ZTE Corporation (China)   Q11/15   2018-09-25
[ 1024 ]  
 
SPN protection consideration     ZTE Corporation (China)   Q11/15   2018-09-25
[ 1023 ]  
 
Analysis on Relationship among G.7701, G.7702 and G.8080     China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q14/15, Q12/15   2018-09-25
[ 1022 ]  
(Rev.1) 
Typical application scenarios for 5G transport network     China Telecommunications Corporation , ZTE Corporation (China)   Q11/15   2018-09-25
[ 1021 ]  
 
SPN can meet all the requirements for transport network listed in Draft_CTN5g     FiberHome Technologies Group (China)   Q11/15   2018-09-25
[ 1020 ]  
 
G.mgfast: how is QoS treated by other communication standards     Sckipio Technologies S.I. Ltd. (Israel)   Q4/15   2018-09-25
[ 1019 ]  
 
G.mgfast: some more explanations on the proposed architecture of the PMD     Sckipio Technologies S.I. Ltd. (Israel)   Q4/15   2018-09-25
[ 1018 ]  
 
G.fast: issues related to OLR request type 1     Sckipio Technologies S.I. Ltd. (Israel)   Q4/15   2018-09-25
[ 1017 ]  
 
Considerations on Control and Management for 5G slicing in GSTR-TN5G     China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q14/15, Q12/15   2018-09-25
[ 1016 ]  
 
Protection Techniques in transport networks to support IMT 2020/5G networks     FiberHome Technologies Group (China)   Q11/15   2018-09-25
[ 1015 ]  
 
G.fast: text for negotiating ANDEFTR as agreed in issue 10.77.1sc     Sckipio Technologies S.I. Ltd. (Israel) , British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom) , Broadcom Corporation (United States) , Intel Corporation (United States) , Metanoia Technologies, Inc. (United States)   Q4/15   2018-09-25
[ 1014 ]  
 
Model for PTP domain     ZTE Corporation (China)   Q14/15   2018-09-25
[ 1013 ]  
 
Model for Sync Path     ZTE Corporation (China)   Q14/15   2018-09-25
[ 1012 ]  
 
Proposal to initiate a new draft of Recommendation on requirements of transport network slice management and control     China Mobile Communications Corporation , ZTE Corporation (China)   Q14/15, Q12/15   2018-09-25
[ 1011 ]  
 
Resources mapping functions in the client context     ZTE Corporation (China)   Q14/15   2018-09-25
[ 1010 ]  
 
requirements and standard gap analysis about the STL of the SPN     ZTE Corporation (China)   Q6/15, Q11/15   2018-09-25
[ 1009 ]  
 
proposals on the modulation formats about the 200G and 400G DWDM system     ZTE Corporation (China)   Q6/15   2018-09-25
[ 1008 ]  
 
Considerations on supporting 3GPP network slice in the transport network     ZTE Corporation (China)   Q14/15, Q12/15   2018-09-25
[ 1007 ]  
 
considerations about the modulation format for the 25G optical interface     ZTE Corporation (China)   Q6/15   2018-09-25
[ 1006 ]  
 
Requirements analysis based on 3GPP progress in 5G network slice     ZTE Corporation (China)   Q14/15, Q12/15   2018-09-25
[ 1005 ]  
 
Proposed OCJ function in draft G.977.1     China Mobile Communications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q8/15   2018-09-25
[ 1004 ]  
 
Proposal for G.971 revision     China Mobile Communications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q8/15   2018-09-25
Results:409 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-14