Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1871 ]
|
GFP Management Information Model in G.8052
|
China Information Communication Technologies Group
,
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q11/15, Q10/15
|
2020-01-14 |
|
[ 1870 ]
|
GFP Management requirements in G.874, G.8051 and G.8151
|
China Information Communication Technologies Group
,
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q11/15, Q10/15
|
2020-01-14 |
|
[ 1869 ]
|
HSP LDPC Code Proposal
|
Broadcom Corporation (United States)
|
Q2/15
|
2020-01-14 |
|
[ 1868 ]
|
Proposed update to Table 8-3 of G.8051
|
China Information Communication Technologies Group
,
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q10/15
|
2020-01-14 |
|
[ 1867 ]
|
Proposed text for protection group commands in G.mtn-prot
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q11/15
|
2020-01-14 |
|
[ 1866 ]
|
Proposed text for protection architecture in G.mtn-prot
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q11/15
|
2020-01-14 |
|
[ 1865 ]
|
Proposed skeleton draft for G.mtn-prot
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q11/15
|
2020-01-14 |
|
[ 1864 ]
|
G.7712: Proposed appendix of time critical packet based DCN application
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q14/15
|
2020-01-14 |
|
[ 1863 ]
|
Comments on cable test methods in L.oha
|
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q16/15
|
2020-01-14 |
|
[ 1862 ]
|
Field trials of fibre deployment in home area
|
Huawei Technologies Co., Ltd. (China)
|
Q18/15
|
2020-01-14 |
|
[ 1861 ]
|
G.mgfast: Working text for clauses 11.3.and 11.4
|
Nokia Corporation (Finland)
|
Q4/15
|
2020-01-14 |
|
[ 1860 ]
|
Analysis of management communication channel in MTN section frame format
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q11/15
|
2020-01-14 |
|
[ 1859 ]
|
Use cases of enhanced BMCA
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q13/15
|
2020-01-14 |
|
[ 1858 ]
|
Thoughts and questions on Sub1G over OTN solution
|
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2020-01-14 |
|
[ 1857 ]
|
Further thoughts on OTN evolution
|
ZTE Corporation (China)
|
Q11/15
|
2020-01-14 |
|
[ 1856 ]
|
Discussion for Defects of Loss of FlexE Frame and overhead Multiframe
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-14 |
|
[ 1855 ]
|
Consideration about the needs for extending the number of channels for 200G/400G applications
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15, Q5/15
|
2020-01-14 |
|
[ 1854 ]
|
Considerations on MTN section layer
|
ZTE Corporation (China)
|
Q11/15
|
2020-01-14 |
|
[ 1853 ]
|
Considerations on 100GBASE-R over OTN
|
ZTE Corporation (China)
|
Q11/15
|
2020-01-14 |
|
[ 1852 ]
|
Cell based OTN solution for G.Sup.sub1G
|
ZTE Corporation (China)
|
Q11/15
|
2020-01-14 |
|
[ 1851 ]
|
Proposal for MTN alarms and fault management
|
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q11/15
|
2020-01-14 |
|
[ 1850 ]
|
Consideration on the commonality of FEC in 80km metro network
|
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15, Q11/15
|
2020-01-14 |
|
[ 1849 ]
|
Proposal of additional data encryption support in G.988
|
China Information Communication Technologies Group
|
Q2/15
|
2020-01-14 |
|
[ 1848 ]
|
Introduce CH-ID field to Allocation Structure
|
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2020-01-14 |
|
[ 1847 ]
(Rev.1) |
More Considerations on FlexE modeling
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q11/15
|
2020-01-14 |
|
[ 1846 ]
|
Use the DWLCH ID field to indicate the Wavelength option set for XGS PON
|
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2020-01-14 |
|
[ 1845 ]
(Rev.1) |
Proposed calendar configuration updates to G.8023 Amendment
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q14/15, Q11/15
|
2020-01-14 |
|
[ 1844 ]
(Rev.1) |
Some comments on the G.8023 draft
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2020-01-14 |
|
[ 1843 ]
(Rev.1) |
Draft G.9807.3
|
Google Fiber (United States)
|
Q2/15
|
2020-01-14 |
|
[ 1842 ]
|
Thoughts on OTUCn-M encryption support
|
Microsemi Corporation (United States)
|
Q11/15
|
2020-01-14 |
|
[ 1841 ]
|
OTNSec at the ODU layer
|
Microsemi Corporation (United States)
|
Q11/15
|
2020-01-14 |
|
[ 1840 ]
|
Thoughts on the overhead bandwidth requirements and impact on latency for OTN Security at the ODU layer
|
Microsemi Corporation (United States)
|
Q11/15
|
2020-01-14 |
|
[ 1839 ]
|
Channel Bonding for G.HSP: ONU state and control messaging
|
Nokia Corporation (Finland)
,
Nokia Shanghai Bell Co. Ltd. (China)
|
Q2/15
|
2020-01-14 |
|
[ 1838 ]
|
Thoughts on authentication of fields beyond ciphertext
|
Microsemi Corporation (United States)
|
Q11/15
|
2020-01-14 |
|
[ 1837 ]
|
Rogue ONU identification method for PON
|
Nokia Corporation (Finland)
,
Nokia Shanghai Bell Co. Ltd. (China)
|
Q2/15
|
2020-01-14 |
|
[ 1836 ]
|
Proposal on LLDP for MTN
|
China Mobile Communications Corporation
,
ZTE Corporation (China)
|
Q14/15
|
2020-01-14 |
|
[ 1835 ]
|
Timeout parameter of PTSF-lossSync [G.8275.2, G.8265.1, G.8275.1]
|
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
SK Telecom (Korea (Rep. of))
|
Q13/15
|
2020-01-14 |
|
[ 1834 ]
|
Consideration on delay asymmetry for synchronization
|
China Mobile Communications Corporation
,
ZTE Corporation (China)
|
Q7/15, Q6/15, Q13/15
|
2020-01-14 |
|
[ 1833 ]
|
Synchronization Uncertain used by BMC [G.8275.1, G.8275.2]
|
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2020-01-14 |
|
[ 1832 ]
|
Consideration on eQL-TLV
|
ZTE Corporation (China)
|
Q13/15
|
2020-01-14 |
|
[ 1831 ]
|
Relative Time Error [G.8273.2]
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1830 ]
|
A method of detecting clock failures via monitoring relative frequency offsets [G.Suppl.SyncOAM]
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2020-01-14 |
|
[ 1829 ]
|
Proposal for terminology of the time scale
|
ZTE Corporation (China)
|
Q13/15
|
2020-01-14 |
|
[ 1828 ]
|
Proposed text for clause 6 G.7719
|
Nokia Shanghai Bell Co. Ltd. (China)
|
Q14/15
|
2020-01-14 |
|
[ 1827 ]
|
Packet Timing Signal Fail function [G.8275.1]
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
SK Telecom (Korea (Rep. of))
|
Q13/15
|
2020-01-14 |
|
[ 1826 ]
|
Proposed object classes for G.7719
|
Nokia Shanghai Bell Co. Ltd. (China)
|
Q14/15
|
2020-01-14 |
|
[ 1825 ]
|
Proposed text for G.7718 clause 8
|
Nokia Shanghai Bell Co. Ltd. (China)
|
Q14/15
|
2020-01-14 |
|
[ 1824 ]
|
Performance parameter of optical component and performance monitoring parameters
|
Nokia Shanghai Bell Co. Ltd. (China)
|
Q7/15, Q6/15, Q14/15
|
2020-01-14 |
|
[ 1823 ]
|
PTP port of the APTS scenario [G.8271.2, G.8275.2, G.8273.4]
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2020-01-14 |
|
[ 1822 ]
|
Enhancement of the appendix I for G.807
|
Nokia Shanghai Bell Co. Ltd. (China)
|
Q12/15
|
2020-01-14 |
Results:436 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):