Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 505 ]
|
-Considerations about the application scenarios and the clarification of concerned problems of the RPOA
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2023-04-04 |
|
[ 504 ]
|
Requirements about the OA for new network scenarios
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2023-04-04 |
|
[ 503 ]
|
Considerations about the 800G DWDM of the G.698.2
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2023-04-04 |
|
[ 502 ]
(Rev.1-2) |
PTP message delays [G.781.1]
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2023-04-04 |
|
[ 501 ]
|
Proposals to update the fault management in G.7710
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
|
Q14/15
|
2023-04-04 |
|
[ 500 ]
|
Considerations on the bandwidth granularity of B400G P2MP metro applications
|
China Information Communication Technologies Group
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/15
|
2023-04-04 |
|
[ 499 ]
|
Proposed A.1 for the revision to G.7710
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q14/15
|
2023-04-04 |
|
[ 498 ]
|
Proposal of considering MFD related parameters values of G.654.E
|
China Unicom
|
Q5/15
|
2023-04-04 |
|
[ 497 ]
|
Considerations on 800G FlexO-8-RS interface
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q11/15
|
2023-04-04 |
|
[ 496 ]
|
Proposals to update G.7701 amd.1
|
China Information Communication Technologies Group
|
Q12/15
|
2023-04-04 |
|
[ 495 ]
|
Further discussion of AWGR and tunable laser used for optical switch
|
China Unicom
|
Q6/15
|
2023-04-04 |
|
[ 494 ]
|
Use case of PON with enhanced QoE abilities for eOLT
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q2/15
|
2023-04-04 |
|
[ 493 ]
|
Propose new use cases for NB-OWC TD
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q3/15
|
2023-04-04 |
|
[ 492 ]
|
Requirements of MTN supporting Ethernet CBR service for Industry Deterministic Applications
|
Ministry of Industry and Information Technology (MIIT) (China)
,
State Grid Corporation of China
|
Q11/15
|
2023-04-04 |
|
[ 491 ]
|
Discussion of Raman amplifiers application
|
China Unicom
|
Q7/15, Q6/15
|
2023-04-04 |
|
[ 490 ]
|
Discussion and new draft of G.dsssc
|
China Mobile Communications Co. Ltd.
,
China Unicom
,
HMN Technologies Co. Ltd. (China)
,
Jiangsu Zhongtian Technology Co.,Ltd. (China)
|
Q8/15
|
2023-04-04 |
|
[ 489 ]
|
Proposed cable level architecture content of L.250
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q7/15
|
2023-04-04 |
|
[ 488 ]
|
Proposal of initiating the revision of Recommendation L.360
|
China Information Communication Technologies Group
,
Hengtong Optic-electric Co., Ltd. (China)
,
Huawei Technologies Co., Ltd. (China)
,
Jiangsu Zhongtian Technology Co.,Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q7/15
|
2023-04-04 |
|
[ 487 ]
|
Analysis and instances of fgMTN frame format
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q11/15
|
2023-04-04 |
|
[ 486 ]
|
Proposal of metro 800G coherent interfaces
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2023-04-04 |
|
[ 485 ]
|
Proposal on enhanced BMCA for path accuracy selection
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q13/15
|
2023-04-04 |
|
[ 484 ]
|
Editorial updates to draft revised ITU-T G.8013/Y.1731
|
Nokia USA (United States)
|
Q10/15
|
2023-04-04 |
|
[ 483 ]
|
Proposal an architecture for G.fin-NM
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2023-04-04 |
|
[ 482 ]
|
Handling "for further study" items in draft revised ITU-T G.8013/Y.1731
|
Nokia USA (United States)
|
Q10/15
|
2023-04-04 |
|
[ 481 ]
|
Proposal for attributes with enumeration data type
|
ZTE Corporation (China)
|
Q13/15
|
2023-04-04 |
|
[ 480 ]
|
Proposals for SyncPhy attributes
|
ZTE Corporation (China)
|
Q13/15
|
2023-04-04 |
|
[ 479 ]
|
Operation and maintenance requirements for AI/ML and DTN
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q14/15, Q12/15
|
2023-04-04 |
|
[ 478 ]
|
Test results of 10G data rate single span FSO mobile backhaul interface parameters
|
China Unicom
,
Wuhan University (China)
|
Q6/15
|
2023-04-04 |
|
[ 477 ]
|
Correcting Figure VII.2 in ITU-T G.8013-Y.1731
|
Nokia USA (United States)
|
Q10/15
|
2023-04-04 |
|
[ 476 ]
|
Proposal for port data set
|
ZTE Corporation (China)
|
Q13/15
|
2023-04-04 |
|
[ 475 ]
|
Further discusses of the optical remote monitoring and optical layer OAM
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2023-04-04 |
|
[ 474 ]
|
Discussion on plug-and-play function of G.fin network
|
China Mobile Communications Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q3/15
|
2023-04-04 |
|
[ 473 ]
|
Clarification to concerns on FSO issue
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/15
|
2023-04-04 |
|
[ 472 ]
|
Chinese experience on optical infrastructure sharing and support new work item
|
China Information Communication Technologies Group
,
Hengtong Optic-electric Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q7/15
|
2023-04-04 |
|
[ 471 ]
|
Proposed enhanced security and performance management to G.7710
|
China Information Communication Technologies Group
|
Q14/15
|
2023-04-04 |
|
[ 470 ]
|
Proposal of new recommendation on free space optical interface requirement for mobile backhaul
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Unicom
,
Hengtong Optic-electric Co., Ltd. (China)
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Wuhan University (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
,
ZTE Corporation (China)
|
Q6/15
|
2023-04-04 |
|
[ 469 ]
(Rev.1) |
Proposal an outline for G.fin-NM
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q3/15
|
2023-04-04 |
|
[ 468 ]
(Rev.1) |
AI/ML management requirement
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q14/15, Q12/15
|
2023-04-04 |
|
[ 467 ]
|
The attribute member "PTP Enable/Disable" for PTP dataset [G.8275.1]
|
China Information Communication Technologies Group
|
Q13/15
|
2023-04-04 |
|
[ 466 ]
|
Further considerations on transport layer to SD-p layer adaption functions [G.781.1]
|
China Information Communication Technologies Group
|
Q13/15
|
2023-04-04 |
|
[ 465 ]
|
Proposed text of synchronization interfaces in G.781
|
China Information Communication Technologies Group
|
Q13/15
|
2023-04-04 |
|
[ 464 ]
(Rev.1) |
Requirements for G.Sup.VHSP
R1 version aligns the title with the web page
|
Verizon Communication Corporation (United States)
|
Q2/15
|
2023-04-04 |
|
[ 463 ]
|
Colorless Multi-Access Network - Continued discussion on operators requirement for PtP and PtMP services
|
AT&T, Inc. (United States)
|
Q2/15
|
2023-04-03 |
|
[ 462 ]
|
PTP Network Security
|
Meinberg Funkuhren GmbH & Co.KG (Germany)
|
Q13/15
|
2023-04-03 |
|
[ 461 ]
|
Updates on the draft list of parameters to be included the G.hn data model
|
Maxlinear Inc (United States)
|
Q3/15
|
2023-04-03 |
|
[ 460 ]
|
UML model reverse-engineered of RFC8632 for G.8052.1
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q14/15
|
2023-04-03 |
|
[ 459 ]
|
G.8273.2 SyncE transients for congruent networks
|
Nokia Corporation (Finland)
|
Q13/15
|
2023-04-03 |
|
[ 458 ]
|
Introduction of ATP technique for FSO
|
China Unicom
,
Hengtong Optic-electric Co., Ltd. (China)
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2023-04-03 |
|
[ 457 ]
|
Responses to Address the Remaining Issues in the G.owdm2 Draft
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2023-04-03 |
|
[ 456 ]
|
Study on the Use of O-band Optical Amplifiers for Energy-Efficient Optical Transceivers at 800G, 1.6T and Beyond
|
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2023-04-03 |
Results:290 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):