Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP4A : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP4A  C 

UIT-R WP4A

Utilización Eficaz de la Orbita y del Espectro para el SFS y el SRS

Resultados :132 documentos
Resultados :  Anterior -  1 - 2 - 3
Contribuciones  [ AI/Cuestión: AI7 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 313 ]  
 
Comments on the proposed harmonization of some of the provisions of Appendix 30B with those of Appendix 30/30A     Canada   AI7   2017-04-26
[ 310 ]  
 
Bringing into use of frequency assignments to non-geostationary satellite networks or systems     Canada   AI7   2017-04-26
[ 309 ]  
 
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12A and 9.13 or 9.21     Canada   AI7   2017-04-26
[ 308 ]  
 
Proposed new issue under WRC-19 agenda item 7 - Issue XX: Modifications to Appendix 4 data elements to be provided for non-Geostationary satellite networks/systems     Canada   AI7   2017-04-26
[ 305 ]  
 
Issue[XX]: Application of Paragraph 6.6 and 6.16 of Article 6 of Appendix 30B - WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 304 ]  
 
Issue[Y]: Extension of the date of bringing into use of assignments due to force-majeure - Under WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 303 ]  
 
Issue[X]: Establishment a facility to the administrations in order to observe their comments/objections under No. 9.51 and No. 9.52 for coordination under Nos.9.7 - WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 302 ]  
 
Comments on Annex 24 to Working Party 4A Chairman's Report - Working document - Enhancement of the regulatory provisions of RR Appendix 30B to observe the principles based on which it was initially established - WRC-19 agenda item 7 - Issue F     Iran (Islamic Republic of)   AI7   2017-04-26
[ 301 ]  
 
Issue [Z]: Frequency bands submitted under Article 6 for additional use - Under WRC-19 agenda item 7     Iran (Islamic Republic of)   AI7   2017-04-26
[ 292 ]  
 
Some aspects of the proposed revision of paragraph 4.1.18 in Appendices 30 and 30A of the Radio Regulations     Bulgaria (Republic of)   AI7   2017-04-25
[ 280 ]  
 
Input on working document - Updating the reference situation for networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments - WRC-19 agenda item 7 - Issue G     United States of America   AI7   2017-04-21
[ 279 ]  
 
Proposal related to WRC-19 agenda item 7 - Issue F     United States of America   AI7   2017-04-21
[ 278 ]  
 
Proposal related to WRC-19 agenda item 7 - Issue E     United States of America   AI7   2017-04-21
[ 268 ]  
 
Updating the reference situation for networks under Appendix 30 and 30A when provisional recording is used - WRC-19 agenda item 7     Netherlands (Kingdom of the)   AI7   2017-04-20
[ 265 ]  
 
List of affected frequency assignments for satellite networks identified under No. 9.36.2 of the Radio Regulations (WRC-19 agenda item 7)     Korea (Republic of)   AI7   2017-04-18
[ 246 ]  
 
Proposal relating to issue of modification of Section 1, Annex 1 of AP30 under agenda item 7     Japan   AI7   2017-03-28
[ 245 ]  
 
Views relating to the treatment of issue G - Under agenda item 7     Japan   AI7   2017-03-28
[ 243 ]  
 
Proposed draft CPM text for WRC-19 agenda item 7 issue G - Updating the reference situation for networks under Appendix 30 and 30A when provisional recording is used     Norway   AI7   2017-03-27
[ 240 ]  
(Rev.1) 
WRC-19 agenda item 7 - Issue F - Enhancement of RR Appendix 30B     Director, BR   AI7   2017-03-08
[ 232 ]  
 
Proposed amendments to the working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12, 9.12A or 9.13 - Agenda item 7     United Kingdom of Great Britain and Northern Ireland   AI7   2017-02-15
[ 174 ]  
 
Working document towards preliminary draft CPM text for WRC-19 AI 7 - Issue [A]: Factors related to the bringing into use of frequency assignments of non-GSO systems subject to coordination     PT Bank Rakyat Indonesia   AI7   2016-09-21
[ 167 ]  
 
WRC-19 agenda item 7 - Issue A - Bringing into use of frequency assignments to non-geostationary satellite systems     France   AI7   2016-09-21
[ 166 ]  
 
WRC-19 agenda item 7 - Quantifying the application of no. 11.32A for cases of coordination under no. 9.12A in the bands 28.6-29.1 GHz and 18.8-19.3 GHz     France   AI7   2016-09-21
[ 147 ]  
 
Proposals relating to the treatment of Issue A under agenda item 7     Canada   AI7   2016-09-20
[ 141 ]  
 
The inclusion of the issue "Application of coordination arc in the Ka band, to determine coordination requirements between FSS and MSS" into consideration within the framework of agenda item 7     Russian Federation   AI7   2016-09-20
[ 125 ]  
 
Harmonization of Appendices 30 & 30A for Regions 1 & 3 with that of Region 2 - Harmonization of Appendix 30B with Appendices 30 & 30A - Enhancement of Regulatory Provisions of Appendix 30B to observe the principles based on which it was initially established - WRC-19 agenda item 7 (Issue X)     Iran (Islamic Republic of)   AI7   2016-09-18
[ 118 ]  
 
Modification to Annex 24 to Working Party 4A Chairman's Report - Working document toward preliminary draft CPM text for WRC-19 agenda item 7 - Issue C: Discrepancy and / or inconsistency between the regulatory provisions dealing with any changes to the characteristics of an assignment     Iran (Islamic Republic of)   AI7   2016-09-18
[ 117 ]  
 
Comments on Annex 23 to Working Party 4A Chairman's Report - Working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue B: Modification (characteristics reduction) of a recorded assignment under RR Appendices 30 and 30A Regions 1 & 3 List     Iran (Islamic Republic of)   AI7   2016-09-18
[ 116 ]  
 
Comments to Annex 22 to Working Party 4A Chairman's Report - Working document toward preliminary draft CPM text for WRC-19 agenda item 7 - Issue A: Factors related to the bringing into use of frequency assignments of non-GSO systems subject to coordination     Iran (Islamic Republic of)   AI7   2016-09-18
[ 107 ]  
 
List of affected frequency assignments for satellite networks identified under No. 9.36.2 of the Radio Regulations (WRC-19 agenda item 7)     Korea (Republic of)   AI7   2016-09-13
[ 34 ]  
 
Modification (characteristics reduction) of a recorded assignment under RR Appendices 30 and 30A Regions 1 & 3 List - Agenda item 7     Israel (State of)   AI7   2016-04-05
[ 20 ]  
 
Working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue [A]: Factors related to the bringing into use of frequency assignments of non-GSO systems subject to coordination     United States of America   AI7   2016-04-01
Resultados :132 documentos
Resultados :  Anterior -  1 - 2 - 3  
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2024-11-18