Contribuciones ![Documents / Contributions](/res/templates/dms/images/key.gif) |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 146 ]
|
Proposal on new study of possible coordination of space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz
|
China
|
|
2024-06-07 |
|
[ 145 ]
|
Proposal on the IMT parameters towards WRC-27 agenda item 1.13
|
China
|
AI1.13
|
2024-06-07 |
|
[ 144 ]
|
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 4 400-4 800 MHZ
|
China
|
|
2024-06-07 |
|
[ 143 ]
|
Proposed revision of work plan for the working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
|
China
|
|
2024-06-07 |
|
[ 142 ]
|
Proposal on the IMT parameters for the frequency band 14.8-15.35 GHz towards WRC-27 agenda item 1.7
|
China
|
AI1.7
|
2024-06-07 |
|
[ 141 ]
|
Proposals for modification of the working document towards a preliminary draft new Report ITU-R M.[IMT.A2G]
|
Russian Federation
|
|
2024-06-07 |
|
[ 140 ]
|
Analysis of the frequency plans of Recommendation ITU-R M.1036 for MSS applications and draft reply liaison statement to Working Party 4C
|
Russian Federation
|
|
2024-06-07 |
|
[ 139 ]
|
Proposed characteristics of IMT for sharing studies in the frequency band 4 400-4 800 MHZ
|
Russian Federation
|
|
2024-06-07 |
|
[ 138 ]
|
Proposals on the structure of Report ITU-R M.[IMT-RLAN] and detailed work plan
|
Russian Federation
|
|
2024-06-07 |
|
[ 137 ]
|
Liaison statement on revised ITU work related to ITS presented at 3GPP Stage-1 Workshop on IMT-2030 use cases
|
CITS EG-ComAD
|
|
2024-06-06 |
|
[ 136 ]
|
Liaison statement on parameters for 4400 to 4800 MHZ of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
|
Director, BR
|
|
2024-06-04 |
|
[ 135 ]
|
Update on activities in Region 2
|
Region 2 Rapporteur
|
|
2024-06-03 |
|
[ 134 ]
|
Considerations on capabilities towards preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
|
2024-06-03 |
|
[ 133 ]
|
Proposal of test environment for IMT-2030
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
|
2024-06-03 |
|
[ 132 ]
|
Reply liaison statement to Coordination Committee for Terminology (copy to Working Parties 5B, 5C and 5D for information) - Definition of utility radiocommunications systems
|
WP 5A
|
|
2024-05-30 |
|
[ 131 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15
|
WP 5C
|
AI1.15
|
2024-05-29 |
|
[ 130 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13
|
WP 5C
|
A1.13
|
2024-05-29 |
|
[ 129 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7
|
WP 5C
|
AI1.7
|
2024-05-29 |
|
[ 128 ]
|
Reply liaison statement to Working Party 7C (copy to Working Parties 3M, 4A, 5A, 5B, 5D and 7B for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.19
|
WP 5C
|
AI1.19
|
2024-05-29 |
|
[ 127 ]
|
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7
|
WP 5B
|
AI1.7
|
2024-05-28 |
|
[ 126 ]
|
Reply liaison statement to Working Party 4C (copy to Working Party 5D for information) - Relevant technical information for sharing studies under WRC-27 agenda item 1.13
|
WP 5B
|
AI1.13
|
2024-05-28 |
|
[ 125 ]
|
Support for approval and proposed edits to the preliminary draft revision of Recommendation ITU-R M.1036
|
Brazil
|
|
2024-05-24 |
|
[ 124 ]
(Rev.1) |
Working document on sharing and compatibility studies under WRC-27 agenda item 1.7
|
Brazil
|
|
2024-05-24 |
|
[ 123 ]
|
Proposed reply liaison statement to Working Party 4C on work related to WRC-27 agenda item 1.13
|
Brazil
|
|
2024-05-24 |
|
[ 122 ]
|
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-R Working Party 5D on IMT for broadband public protection and disaster relief
|
ITU-D SG1
|
|
2024-05-27 |
|
[ 121 ]
|
Liaison statement on initiation of draft new technical Report ITU-T TR.SP-UAV - Signalling requirements and protocols between unmanned aerial vehicles and unmanned aerial vehicle controllers using IMT-2020 networks and beyond
|
ITU-T SG11
|
|
2024-05-20 |
|
[ 120 ]
|
Draft framework for working document for sharing and compatibility studies of IMT systems in the frequency bands [XXX-YYY] MHZ
|
United States
|
|
2024-05-17 |
|
[ 119 ]
|
Liaison statement to Working Party 5D - Progress on the work on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]
|
WP 4A
|
|
2024-05-16 |
|
[ 118 ]
|
Initial reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WP 4A
|
AI1.7
|
2024-05-15 |
|
[ 117 ]
|
Liaison statement to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D (copy to Working Party 7C for information) - Information to support studies under WRC-27 agenda item 1.1
|
WP 4A
|
AI1.1
|
2024-05-13 |
|
[ 116 ]
|
Liaison statement to Study Groups 5 and 7 (copy to Study Group 1 for information) - Activities in response of Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 (RA-23)
|
SG 4
|
|
2024-05-10 |
|
[ 115 ]
|
This document has been withdrawn
|
N/A (no se aplica)
|
|
2024-05-10 |
|
[ 114 ]
|
Report on disaster relief
|
Disaster Relief Liaison Rapporteur
|
|
2024-05-06 |
|
[ 113 ]
|
Liaison statement on results of the sixth meeting of the FG-MV
|
ITU-T FG-MV
|
|
2024-05-06 |
|
[ 112 ]
|
Liaison statement to Working Parties 3L, 4B, 5A, 5C, 5D, 7B, and 7C (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.14
|
WP 4C
|
AI1.14
|
2024-05-01 |
|
[ 111 ]
|
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13
|
WP 4C
|
AI1.13
|
2024-05-01 |
|
[ 110 ]
|
Liaison statement to Working Parties 3L, 3M, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D (copy to Working Party 4A for information, and action if any) - Relevant technical information to support studies under WRC-27 agenda item 1.12
|
WP 4C
|
AI1.12
|
2024-05-01 |
|
[ 109 ]
|
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 7D - WRC-27 agenda item 1.11
|
WP 4C
|
AI1.11
|
2024-05-01 |
|
[ 108 ]
|
Initial reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WP 4C
|
AI1.7
|
2024-05-01 |
|
[ 107 ]
|
Reply liaison statement to Working Party 5D - Work related to WRC-27 agenda item 1.13
|
WP 4C
|
AI1.13
|
2024-05-01 |
|
[ 106 ]
|
Cognitive radio spectrum access and resource management for reconfigurable communication networks for future networks
|
General Authority of Communication and Informatics (Libya)
|
|
2024-04-28 |
|
[ 105 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
|
Chair, CCV
|
|
2024-04-22 |
|
[ 104 ]
|
Liaison statement on deliverables of FG-TBFXG
|
FG-TBFxG
|
|
2024-04-18 |
|
[ 103 ]
|
Contribution for ITU-R M.[IMT-2020.UNWANT.(MS/BS)] regarding DECT-2020 NR
|
European Telecommunications Standards Institute (France)
|
|
2024-04-17 |
|
[ 102 ]
|
Initial submission of updated material on "DECT 5G-SRIT" toward revision 3 of Recommendation ITU-R M.2150
|
European Telecommunications Standards Institute (France)
|
|
2024-04-17 |
|
[ 101 ]
|
Liaison statement on consent of draft new Recommendation ITU-T Y.3207 (ex Y.FMSC-INCA) - Fixed, mobile and satellite convergence - Integrated network control architecture framework for IMT-2020 networks and beyond
|
ITU-T SG13
|
|
2024-04-11 |
|
[ 100 ]
|
Liaison statement on agreement of new Supplement 81 to ITU-T Y.3200-Series (ex Y.Sat-Use-Cases) - Use cases of satellite communications in developing countries
|
ITU-T SG13
|
|
2024-04-11 |
|
[ 99 ]
|
Liaison statement on invitation to update the information in the IMT-2020 and Beyond roadmap
|
JCA IMT2020
|
|
2024-04-10 |
|
[ 98 ]
|
Liaison statement on initiation of the draft new technical Report ITU-T TR.URCN-REQ - Service requirements of ubiquitous real time communication network for future networks
|
ITU-T SG13
|
|
2024-04-09 |
|
[ 97 ]
|
Liaison statement on results of the fifth meeting of the FG-MV
|
ITU-T FG-MV
|
|
2024-04-02 |
Resultados :246 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5
- Siguiente
![Next](/res/templates/dms/images/next.gif)
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):