Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2010-05-31 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2010-05-31) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2010-05-31 al 2010-06-11

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultados :352 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 999 ]  
 
Functional Model of Hitless Adjustment of ODUflex     Huawei   Q9/15   2010-05-20
[ 998 ]  
 
G.inp: On Retransmission REIN overhead formula     Lantiq   Q4/15   2010-05-20
[ 997 ]  
 
G.inp: Further comments on SRA Proposals for G.998.4     Lantiq   Q4/15   2010-05-20
[ 996 ]  
 
Comments and way forward for distribution of ToD over VDSL2 links     Lantiq   Q4/15   2010-05-20
[ 995 ]  
 
Treatment of delay jumps in relation with MAFE/MATIE     Nokia Siemens Networks   Q13/15   2010-05-20
[ 994 ]  
 
Packet metrics applied to two-way delay patterns     Nokia Siemens Networks   Q13/15   2010-05-20
[ 993 ]  
 
Analysis of the floor delay window method     Nokia Siemens Networks   Q13/15   2010-05-20
[ 992 ]  
 
Applicability of MATIE as a phase stability metric     Nokia Siemens Networks   Q13/15   2010-05-20
[ 991 ]  
 
Document withdrawn     Ericsson   Q6/15   2010-05-20
[ 990 ]  
 
G.827x Slave Clock specification (for time)     Deutsche Telekom   Q13/15   2010-05-20
[ 989 ]  
 
Q13 Requirements structure for time supply (G.827x)     Deutsche Telekom   Q13/15   2010-05-20
[ 988 ]  
 
Input for G.827x Slave clock specification     Deutsche Telekom   Q13/15   2010-05-20
[ 987 ]  
 
SyncE Jitter tolerance (high frequency)     Deutsche Telekom   Q13/15   2010-05-20
[ 986 ]  
 
G.8265.1: Clarifications on the Telecom slave model with multiple slave-only OC instances     France Télécom   Q13/15   2010-05-20
[ 985 ]  
 
G.8265.1: Proposal for the PTP master selection process by a PTP slave in the PTPv2 telecom profile frequency-oriented     France Télécom   Q13/15   2010-05-20
[ 984 ]  
 
KL0bis and Estimation of Electrical Length in VDSL2     BT   Q4/15   2010-05-20
[ 983 ]  
 
Document withdrawn     N/A (no se aplica)     2010-05-20
[ 982 ]  
 
G.vdsl2: KL0bis Estimation for the optional Equalized FEXT UPBO method     Deutsche Telekom   Q4/15   2010-05-20
[ 981 ]  
 
Extension of Appendix I/G.806 to include waveband switching     NTT   Q9/15   2010-05-20
[ 980 ]  
 
Proposal for Desynchronizer Bandwidths, GMP Mapping Granularities, and Mapper Buffer Hysteresis Values for new OTN clients and ODUs, for ITU-T Recommendations G.8251and G.798     Huawei , Alcatel-Lucent Germany   Q9/15, Q13/15   2010-05-20
[ 979 ]  
 
Generic abbreviations for advanced modulation formats in G.Sup39     Ericsson   Q6/15   2010-05-20
[ 978 ]  
 
Applicability of Jitter Requirements for SyncE interfaces     Calnex Solutions   Q13/15   2010-05-20
[ 977 ]  
 
Transport of accurate Time Synchronization over access technologies     Ericsson   Q4/15, Q2/15, Q13/15   2010-05-20
[ 976 ]  
 
Proposal for ODCb Transient Response for G.8251 Section A.8, to Reflect New CBR Clients having ±100 ppm Frequency Tolerance     Huawei , Alcatel-Lucent Germany   Q13/15   2010-05-19
[ 975 ]  
 
ADSL2/ADSl2plus: L2bis mode operator requirements     BT   Q4/15   2010-05-19
[ 974 ]  
 
G.gen: G.vector: G.vdsl: G.hs: Proposal for G.993.2 Annex: G.vector friendly G.993.2 operation     Alcatel-Lucent , Bell N.V.   Q4/15   2010-05-19
[ 973 ]  
 
G.LT - Impulsive Noise Measurement     BT   Q4/15   2010-05-19
[ 972 ]  
 
Further Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN     Huawei   Q13/15   2010-05-19
[ 971 ]  
 
G.hn: Broadcast Radio Protection     BT   Q4/15   2010-05-19
[ 970 ]  
 
Timing Transparency over OTN     Alcatel-Lucent Germany   Q13/15, Q11/15   2010-05-19
[ 969 ]  
 
New Results for Serial Digital Interface Video Client Jitter and Wander Accumulation over OTN Islands     Huawei   Q13/15   2010-05-19
[ 968 ]  
 
G.LT Transmit PSD and Local Regulation     BT   Q4/15   2010-05-19
[ 967 ]  
 
Additional Simulation Results for Peak-to-Peak Phase and RMS Frequency Offset for Transport of a CPRI Client over OTN     Huawei   Q13/15   2010-05-19
[ 966 ]  
 
Proposed jitter tolerance specifications for G.8262     JDSU   Q13/15   2010-05-19
[ 965 ]  
 
Further Simulation Results for syncE and STM-1 Jitter and Wander Accumulation over Networks of OTN Islands     Huawei   Q13/15   2010-05-19
[ 964 ]  
 
Proposed text for a chapter on QoS in G.ptneq     Deutsche Telekom   Q9/15   2010-05-19
[ 963 ]  
 
Fibre Channel and Infiniband Jitter Accumulation over OTN Islands     Huawei   Q13/15, Q11/15   2010-05-19
[ 962 ]  
 
Future study on revision of ITU-T Rec. G.657     Draka Communications   Q5/15   2010-05-19
[ 961 ]  
 
G.8032 rings containing non-G.8032 devices     Ericsson UK   Q9/15   2010-05-19
[ 960 ]  
 
HO/LO ODUk SRP individual and group protection wavelength set     Huawei   Q9/15   2010-05-19
[ 959 ]  
 
Time and Phase Sync Interfaces (G.8271)     Ericsson   Q13/15   2010-05-19
[ 958 ]  
 
Revision of Rec. G.657 Appendix I     Draka Communications   Q5/15, Q16/15   2010-05-19
[ 957 ]  
 
Modifications to OPSMnk_TT_So_process of G.798 (TD 243/Plen)     ETRI   Q9/15   2010-05-19
[ 956 ]  
 
Comments on draft revised G.798 (TD 243/Plen)     ETRI   Q9/15   2010-05-19
[ 955 ]  
 
R-APS channels with different MAC-DA and same VID for identifying Ring-ID in G.8032     NTT   Q9/15   2010-05-19
[ 954 ]  
 
Proposed mechanism with DNI for end-to-end service resiliency in G.8032     NTT , NEC   Q9/15   2010-05-19
[ 953 ]  
 
Protecting broadcast TV distribution in the OTN     Huawei   Q9/15   2010-05-19
[ 952 ]  
 
Additional Requirement for ODUflex hitless resizing     ETRI   Q11/15   2010-05-19
[ 951 ]  
 
Proposal Amendment to G.7041 for 40G & 100G Ethernet transport     ETRI   Q11/15   2010-05-19
[ 950 ]  
 
Proposal Amendment to G.7041 Table V.4     ETRI   Q11/15   2010-05-19
Resultados :352 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-11-19