Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 999 ]
|
Functional Model of Hitless Adjustment of ODUflex
|
Huawei
|
Q9/15
|
2010-05-20 |
|
[ 998 ]
|
G.inp: On Retransmission REIN overhead formula
|
Lantiq
|
Q4/15
|
2010-05-20 |
|
[ 997 ]
|
G.inp: Further comments on SRA Proposals for G.998.4
|
Lantiq
|
Q4/15
|
2010-05-20 |
|
[ 996 ]
|
Comments and way forward for distribution of ToD over VDSL2 links
|
Lantiq
|
Q4/15
|
2010-05-20 |
|
[ 995 ]
|
Treatment of delay jumps in relation with MAFE/MATIE
|
Nokia Siemens Networks
|
Q13/15
|
2010-05-20 |
|
[ 994 ]
|
Packet metrics applied to two-way delay patterns
|
Nokia Siemens Networks
|
Q13/15
|
2010-05-20 |
|
[ 993 ]
|
Analysis of the floor delay window method
|
Nokia Siemens Networks
|
Q13/15
|
2010-05-20 |
|
[ 992 ]
|
Applicability of MATIE as a phase stability metric
|
Nokia Siemens Networks
|
Q13/15
|
2010-05-20 |
|
[ 991 ]
|
Document withdrawn
|
Ericsson
|
Q6/15
|
2010-05-20 |
|
[ 990 ]
|
G.827x Slave Clock specification (for time)
|
Deutsche Telekom
|
Q13/15
|
2010-05-20 |
|
[ 989 ]
|
Q13 Requirements structure for time supply (G.827x)
|
Deutsche Telekom
|
Q13/15
|
2010-05-20 |
|
[ 988 ]
|
Input for G.827x Slave clock specification
|
Deutsche Telekom
|
Q13/15
|
2010-05-20 |
|
[ 987 ]
|
SyncE Jitter tolerance (high frequency)
|
Deutsche Telekom
|
Q13/15
|
2010-05-20 |
|
[ 986 ]
|
G.8265.1: Clarifications on the Telecom slave model with multiple slave-only OC instances
|
France Télécom
|
Q13/15
|
2010-05-20 |
|
[ 985 ]
|
G.8265.1: Proposal for the PTP master selection process by a PTP slave in the PTPv2 telecom profile frequency-oriented
|
France Télécom
|
Q13/15
|
2010-05-20 |
|
[ 984 ]
|
KL0bis and Estimation of Electrical Length in VDSL2
|
BT
|
Q4/15
|
2010-05-20 |
|
[ 983 ]
|
Document withdrawn
|
N/A (no se aplica)
|
|
2010-05-20 |
|
[ 982 ]
|
G.vdsl2: KL0bis Estimation for the optional Equalized FEXT UPBO method
|
Deutsche Telekom
|
Q4/15
|
2010-05-20 |
|
[ 981 ]
|
Extension of Appendix I/G.806 to include waveband switching
|
NTT
|
Q9/15
|
2010-05-20 |
|
[ 980 ]
|
Proposal for Desynchronizer Bandwidths, GMP Mapping Granularities, and Mapper Buffer Hysteresis Values for new OTN clients and ODUs, for ITU-T Recommendations G.8251and G.798
|
Huawei
,
Alcatel-Lucent Germany
|
Q9/15, Q13/15
|
2010-05-20 |
|
[ 979 ]
|
Generic abbreviations for advanced modulation formats in G.Sup39
|
Ericsson
|
Q6/15
|
2010-05-20 |
|
[ 978 ]
|
Applicability of Jitter Requirements for SyncE interfaces
|
Calnex Solutions
|
Q13/15
|
2010-05-20 |
|
[ 977 ]
|
Transport of accurate Time Synchronization over access technologies
|
Ericsson
|
Q4/15, Q2/15, Q13/15
|
2010-05-20 |
|
[ 976 ]
|
Proposal for ODCb Transient Response for G.8251 Section A.8, to Reflect New CBR Clients having ±100 ppm Frequency Tolerance
|
Huawei
,
Alcatel-Lucent Germany
|
Q13/15
|
2010-05-19 |
|
[ 975 ]
|
ADSL2/ADSl2plus: L2bis mode operator requirements
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 974 ]
|
G.gen: G.vector: G.vdsl: G.hs: Proposal for G.993.2 Annex: G.vector friendly G.993.2 operation
|
Alcatel-Lucent
,
Bell N.V.
|
Q4/15
|
2010-05-19 |
|
[ 973 ]
|
G.LT - Impulsive Noise Measurement
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 972 ]
|
Further Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 971 ]
|
G.hn: Broadcast Radio Protection
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 970 ]
|
Timing Transparency over OTN
|
Alcatel-Lucent Germany
|
Q13/15, Q11/15
|
2010-05-19 |
|
[ 969 ]
|
New Results for Serial Digital Interface Video Client Jitter and Wander Accumulation over OTN Islands
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 968 ]
|
G.LT Transmit PSD and Local Regulation
|
BT
|
Q4/15
|
2010-05-19 |
|
[ 967 ]
|
Additional Simulation Results for Peak-to-Peak Phase and RMS Frequency Offset for Transport of a CPRI Client over OTN
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 966 ]
|
Proposed jitter tolerance specifications for G.8262
|
JDSU
|
Q13/15
|
2010-05-19 |
|
[ 965 ]
|
Further Simulation Results for syncE and STM-1 Jitter and Wander Accumulation over Networks of OTN Islands
|
Huawei
|
Q13/15
|
2010-05-19 |
|
[ 964 ]
|
Proposed text for a chapter on QoS in G.ptneq
|
Deutsche Telekom
|
Q9/15
|
2010-05-19 |
|
[ 963 ]
|
Fibre Channel and Infiniband Jitter Accumulation over OTN Islands
|
Huawei
|
Q13/15, Q11/15
|
2010-05-19 |
|
[ 962 ]
|
Future study on revision of ITU-T Rec. G.657
|
Draka Communications
|
Q5/15
|
2010-05-19 |
|
[ 961 ]
|
G.8032 rings containing non-G.8032 devices
|
Ericsson UK
|
Q9/15
|
2010-05-19 |
|
[ 960 ]
|
HO/LO ODUk SRP individual and group protection wavelength set
|
Huawei
|
Q9/15
|
2010-05-19 |
|
[ 959 ]
|
Time and Phase Sync Interfaces (G.8271)
|
Ericsson
|
Q13/15
|
2010-05-19 |
|
[ 958 ]
|
Revision of Rec. G.657 Appendix I
|
Draka Communications
|
Q5/15, Q16/15
|
2010-05-19 |
|
[ 957 ]
|
Modifications to OPSMnk_TT_So_process of G.798 (TD 243/Plen)
|
ETRI
|
Q9/15
|
2010-05-19 |
|
[ 956 ]
|
Comments on draft revised G.798 (TD 243/Plen)
|
ETRI
|
Q9/15
|
2010-05-19 |
|
[ 955 ]
|
R-APS channels with different MAC-DA and same VID for identifying Ring-ID in G.8032
|
NTT
|
Q9/15
|
2010-05-19 |
|
[ 954 ]
|
Proposed mechanism with DNI for end-to-end service resiliency in G.8032
|
NTT
,
NEC
|
Q9/15
|
2010-05-19 |
|
[ 953 ]
|
Protecting broadcast TV distribution in the OTN
|
Huawei
|
Q9/15
|
2010-05-19 |
|
[ 952 ]
|
Additional Requirement for ODUflex hitless resizing
|
ETRI
|
Q11/15
|
2010-05-19 |
|
[ 951 ]
|
Proposal Amendment to G.7041 for 40G & 100G Ethernet transport
|
ETRI
|
Q11/15
|
2010-05-19 |
|
[ 950 ]
|
Proposal Amendment to G.7041 Table V.4
|
ETRI
|
Q11/15
|
2010-05-19 |
Resultados :352 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):