Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 241 ]
|
Propose to study the requirements and technologies for beyond 50Gb/s per wavelength
|
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2022-09-06 |
|
[ 240 ]
|
Proposal for new Recommendation "Plate type optical fibre cables for indoor, short distance and ordered application"
|
China Information Communication Technologies Group
,
China Unicom
,
Hengtong Optic-electric Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2022-09-06 |
|
[ 239 ]
(Rev.1) |
Proposal to re-open G.807 to study maintenance of Optical Media Network
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q7/15, Q6/15, Q14/15, Q12/15
|
2022-09-06 |
|
[ 238 ]
|
Changes of G.7711 from 2018 to 2022 version
|
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 237 ]
|
OTS and OMS protection model in G.876
|
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 236 ]
|
Transparent mode for GCC0
|
ZTE Corporation (China)
,
China Mobile Communications Co. Ltd.
|
Q14/15, Q11/15
|
2022-09-06 |
|
[ 235 ]
|
Current, Parent, and timeProperties datasets of SyncPhy
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2022-09-06 |
|
[ 234 ]
|
UML model for optical media channel and media subnetwork
|
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 233 ]
|
Default dataset of SyncPhy
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2022-09-06 |
|
[ 232 ]
|
B400G OTN short reach interface solution
|
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 231 ]
|
Proposal on MTN layer of G.781
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 230 ]
|
Analysis on B400G OTN error marking mechanism
|
China Mobile Communications Co. Ltd.
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 229 ]
|
Some comments on the out of range method in G.7710
|
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 228 ]
|
A proposal to solve the undesirable dMSIM and service interruption
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 227 ]
|
Consideration on MTN fine granularity frame size
|
China Mobile Communications Co. Ltd.
|
Q11/15
|
2022-09-06 |
|
[ 226 ]
(Rev.1-2) |
Proposal to consider the spectrum schedule of optical fibre for ultra-high capacity optical transmission system
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2022-09-06 |
|
[ 225 ]
|
Proposal on BMCA with accuracy TLV
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 224 ]
(Rev.1-2) |
Proposal to consider the transmission distance beyond 450 km
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q6/15
|
2022-09-06 |
|
[ 223 ]
|
G.9804.3 : 50G Upstream ONU Tx TDEC test
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2022-09-06 |
|
[ 222 ]
|
Proposal on definition of accuracy TLV for path selection
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 221 ]
|
Proposal for G.8152.2 Amd.1 linear protection
|
China Information Communication Technologies Group
|
Q14/15
|
2022-09-06 |
|
[ 220 ]
|
G.9804.3: 50G Upstream Eye Mask
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2022-09-06 |
|
[ 219 ]
(Rev.1-2) |
Discussion of the adoption of maximum spectral excursion into G.owdm2
|
China Mobile Communications Co. Ltd.
|
Q6/15
|
2022-09-06 |
|
[ 218 ]
|
Proposal on use cases of accuracy path selection
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 217 ]
|
G.9804.3 50G upstream PMD Parameters
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2022-09-06 |
|
[ 216 ]
|
Proposal on working document for accuracy path selection
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 215 ]
|
Proposal to study digital twin (DT) in transport network
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2022-09-06 |
|
[ 214 ]
|
Proposals to solve open issues in G.8321
|
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 213 ]
|
Comments on cd14b-16
|
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2022-09-06 |
|
[ 212 ]
|
Proposal to re-open G.7701 and G.7702 work items
|
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2022-09-06 |
|
[ 211 ]
|
Proposed updates to G.874 for v6.0.6
|
ZTE Corporation (China)
|
Q14/15
|
2022-09-06 |
|
[ 210 ]
(Rev.1-2) |
Proposal on the text for clause 6 of G.9802
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
,
ZTE Corporation (China)
|
Q2/15
|
2022-09-06 |
|
[ 209 ]
|
Isolation & Directivity implementation of a 3-port CEx
|
British Telecommunications Plc. (BT Plc) (United Kingdom)
|
Q2/15
|
2022-09-06 |
|
[ 208 ]
(Rev.1) |
Updated Proposal for G.owdm2 Specifications
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
,
ZTE Corporation (China)
|
Q6/15
|
2022-09-06 |
|
[ 207 ]
|
Mapping OSU into OSTUF
|
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 206 ]
|
Consideration on Ethernet-optimized FlexO
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q11/15
|
2022-09-06 |
|
[ 205 ]
|
A new OSTU structure for multiplexing OSU into OPU
|
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 204 ]
|
Consideration on direct ODUk multiplexing into FlexO-n
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
,
Orange (France)
|
Q11/15
|
2022-09-06 |
|
[ 203 ]
|
B400G OTN application scenario and requirements
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
,
Orange (France)
|
Q11/15
|
2022-09-06 |
|
[ 202 ]
|
Considerations on PKT mapping into OSU
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 201 ]
|
Considerations on OSU solution
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2022-09-06 |
|
[ 200 ]
|
Summary of IEC 60793-1-45 Ed3 revision
|
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q5/15
|
2022-09-06 |
|
[ 199 ]
|
Proposal on study on functional model of ePRC
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2022-09-06 |
|
[ 198 ]
|
Proposal to revise G.959.1 and G.695 to add 100G per lambda based application codes for OTN application
|
China Unicom
|
Q6/15
|
2022-09-06 |
|
[ 197 ]
|
Discussion and new draft of G.dsssc
|
China Mobile Communications Co. Ltd.
,
China Unicom
,
HMN Technologies Co. Ltd. (China)
|
Q8/15
|
2022-09-06 |
|
[ 196 ]
|
Proposed draft A.1 for G.972 revision
|
China Mobile Communications Co. Ltd.
,
China Unicom
,
HMN Technologies Co. Ltd. (China)
|
Q8/15
|
2022-09-06 |
|
[ 195 ]
|
Proposed discussion to revise L.312
|
China Unicom
|
Q7/15
|
2022-09-06 |
|
[ 194 ]
|
Proposal on section 9.4 of G.mtn-sync
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2022-09-06 |
|
[ 193 ]
|
Proposals for changes in the latest draft of G.mtn-sync
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q13/15
|
2022-09-06 |
|
[ 192 ]
|
Proposed updates to G.8350 draft
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
|
Q14/15
|
2022-09-06 |
Results:1240 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):