Contributions    | 
	              
	             
 | 
Number  
	             
 | 
Title
 | 
Source
 | 
AI/Question 
 | 
Date
 | 
 | 
[ 210 ]
		 
	              | 
Report on the recent activities of Wireless World Research Forum (WWRF)
		 
		  | 
WWRF Liaison Rapporteur
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 209 ]
		 
	              | 
Gap analysis of 3GPP above 6 GHz channel model for IMT-2020 Evaluation
		 
		  | 
Finland
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 208 ]
		 
	              | 
Proposed study on International Mobile Telecommunications (IMT) applications for verticals
		 
		  | 
Telefon AB - LM Ericsson
   		  | 
229-4/5
   		  | 
2016-06-07 | 
 | 
[ 207 ]
		 
	              | 
Proposals to working document towards draft liaison statement to Task Group 5/1 on spectrum needs for the terrestrial component of IMT in the frequency range between 24.25 GHz and 86 GHz
		 
		  | 
Nokia Solutions and Networks Oy
          	    ,
        	    NTT DOCOMO, Inc.
          	    ,
        	    Samsung Electronics Co., Ltd.
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 206 ]
		 
	              | 
Proposal for the revision of Recommendation ITU-R M.1036-5 to include frequency arrangement in the band 1 427-1 518 MHz
		 
		  | 
United Arab Emirates
          	    ,
        	    Egypt (Arab Republic of)
          	    ,
        	    Morocco (Kingdom of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 205 ]
		 
	              | 
Answer to liaison statement to 3GPP on revision of Report ITU-R M.2291
		 
		  | 
NEC Corporation
          	    ,
        	    Nokia Solutions and Networks Oy
          	    ,
        	    Qualcomm, Inc.
          	    ,
        	    Samsung Electronics Co., Ltd.
          	    ,
        	    Telecom Italia S.p.A.
          	    ,
        	    Telefon AB - LM Ericsson
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 204 ]
		 
	              | 
Answer to liaison statement to 3GPP on work towards revision 1 of Recommendations ITU-R M.2070 and M.2071 - Questions for clarification within 3GPP specifications
		 
		  | 
NEC Corporation
          	    ,
        	    Nokia Solutions and Networks Oy
          	    ,
        	    Qualcomm, Inc.
          	    ,
        	    Samsung Electronics Co., Ltd.
          	    ,
        	    Telecom Italia S.p.A.
          	    ,
        	    Telefon AB - LM Ericsson
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 203 ]
		 
	              | 
Proposal for a new Report and/or Recommendation on the technical feasibility of wireless industrial automation systems under WRC-19 agenda item 9.1 issue 9.1.8
		 
		  | 
Germany (Federal Republic of)
   		  | 
AI9.1
   		  | 
2016-06-07 | 
 | 
[ 202 ]
		 
	         (Rev.1)     | 
Activities related to IMT in Region 3
		 
		  | 
Region 3 Rapporteur
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 201 ]
		 
	              | 
Suggested modifications to the IMT-2020 schedule
		 
		  | 
Chairman, Ad Hoc Workplan
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 200 ]
		 
	              | 
Considerations on technical performance requirements for Report ITU-R M.[IMT-2020.TECH PERF REQ]
		 
		  | 
Japan
          	    ,
        	    China (People's Republic of)
          	    ,
        	    Korea (Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 199 ]
		 
	              | 
Further considerations on technical performance requirements for Report ITU-R M.[IMT-2020.TECH PERF REQ]
		 
		  | 
Japan
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 198 ]
		 
	              | 
Proposed modification for IMT-2020/2 "IMT-2020 Process" document
		 
		  | 
Japan
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 197 ]
		 
	              | 
Considerations on service and spectrum requirements for Report ITU-R M.[IMT-2020.SUBMISSION]
		 
		  | 
Japan
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 196 ]
		 
	              | 
Consideration on channel model for IMT-2020 Evaluation
		 
		  | 
Japan
          	    ,
        	    Korea (Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 195 ]
		 
	              | 
Test environments in Report ITU-R M.[IMT-2020.EVAL]
		 
		  | 
Japan
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 194 ]
		 
	              | 
Proposal on operational characteristics of IMT-2020 systems for sharing and compatibility studies under WRC-19 agenda item 1.13
		 
		  | 
Japan
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 193 ]
		 
	              | 
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issue 9.1.2)
		 
		  | 
Japan
   		  | 
AI9.1
   		  | 
2016-06-07 | 
 | 
[ 192 ]
		 
	              | 
Proposed modifications to working document towards preliminary draft new Recommendation ITU-R M.[IMT.MODEL]
		 
		  | 
Japan
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 191 ]
		 
	              | 
Proposed modification to the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-5
		 
		  | 
Japan
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 190 ]
		 
	              | 
Proposed modifications to work programme plan for IMT in Working Party 5D Chairman's Report
		 
		  | 
Japan
          	    ,
        	    Korea (Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 189 ]
		 
	              | 
Draft Addendum 1 to Circular Letter 5/LCCE/59 on IMT-2020 development
		 
		  | 
Japan
          	    ,
        	    China (People's Republic of)
          	    ,
        	    Korea (Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 188 ]
		 
	              | 
Proposal on channel model for IMT-2020
		 
		  | 
Beijing University of Posts and Telecommunications
          	    ,
        	    Spark NZ Limited
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 187 ]
		 
	              | 
Proposals on modification of Recommendation ITU-R M.1036 with regard to the frequency arrangements
		 
		  | 
France
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 186 ]
		 
	              | 
Proposed modifications to working document towards preliminary draft new Recommendation ITU-R M.[IMT MODELLING]
		 
		  | 
France
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 185 ]
		 
	              | 
Proposed modifications to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING]
		 
		  | 
Korea (Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 184 ]
		 
	              | 
Proposed modifications to working document towards draft liaison statement to Task Group 5/1 regarding spectrum needs
		 
		  | 
Korea (Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 183 ]
		 
	              | 
Proposal for refined characteristics of terrestrial IMT systems for frequency sharing/interference analyses in the frequency range between 24.25 GHz and 86 GHz
		 
		  | 
Korea (Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 182 ]
		 
	              | 
Proposal on spectrum requirements for Report ITU-R M.[IMT-2020.SUBMISSION]
		 
		  | 
Korea (Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 181 ]
		 
	              | 
Proposal for Report ITU-R M.[IMT-2020.EVAL]
		 
		  | 
Korea (Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 180 ]
		 
	              | 
Proposal for Report ITU-R M.[IMT-2020.TECH PERF REQ]
		 
		  | 
Korea (Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 179 ]
		 
	              | 
Proposal on a preliminary draft new Report ITU-R M.[IMT.TV]
		 
		  | 
European Broadcasting Union
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 178 ]
		 
	         (Rev.1)     | 
Update Report on CITEL PCC.II activities
		 
		  | 
CITEL Rapporteur
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 177 ]
		 
	              | 
Proposals on the modification of the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-5
		 
		  | 
Russian Federation
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 176 ]
		 
	              | 
Proposal for a study on machine type communications and the internet of things
		 
		  | 
China (People's Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 175 ]
		 
	              | 
Proposed updates on the working document towards PDNR on the coexistence conditions between IMT and aeronautical mobile service in the band 4 800-4 990 MHz
		 
		  | 
China (People's Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 174 ]
		 
	              | 
Proposal on the modeling and simulation of IMT networks for use in sharing and compatibility studies
		 
		  | 
China (People's Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 173 ]
		 
	              | 
Consideration on IMT networks parameters for sharing and compatibility studies under WRC-19 agenda item 1.13
		 
		  | 
China (People's Republic of)
   		  | 
AI1.13
   		  | 
2016-06-07 | 
 | 
[ 172 ]
		 
	              | 
Spectrum needs for the terrestrial component of IMT in the frequency range between 24.25 GHz and 86 GHz for WRC-19 agenda item 1.13
		 
		  | 
China (People's Republic of)
   		  | 
AI1.13
   		  | 
2016-06-07 | 
 | 
[ 171 ]
		 
	              | 
Proposal on Document IMT-2020/2 and working document of preliminary draft new Report M.[IMT-2020.SUBMISSION]
		 
		  | 
China (People's Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 170 ]
		 
	              | 
Proposal on test environments and channel models for IMT-2020 evaluation
		 
		  | 
China (People's Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 169 ]
		 
	              | 
Proposal on the evaluation methodology of IMT-2020
		 
		  | 
China (People's Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 168 ]
		 
	              | 
Consideration on test environments for IMT-2020
		 
		  | 
China (People's Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 167 ]
		 
	              | 
Candidate technical performance requirements for ITU-R M.[IMT-2020. TECH PERF REQ]
		 
		  | 
China (People's Republic of)
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 166 ]
		 
	              | 
Further development of working document towards preliminary draft new Recommendation ITU-R M.[IMT.MODEL]
		 
		  | 
Intel Corporation
          	    ,
        	    Samsung Electronics Co., Ltd.
          	    ,
        	    Telefon AB - LM Ericsson
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 165 ]
		 
	              | 
Proposal for revision of the Report ITU-R M.2291-0 - CEPT's position on the use of International Mobile Telecommunications for broadband public protection and disaster relief applications
		 
		  | 
France
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 164 ]
		 
	              | 
Elements of a channel model to evaluate candidate IMT-2020 radio interface technologies
		 
		  | 
Telefon AB - LM Ericsson
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 163 ]
		 
	              | 
IMT applications and vertical industries
		 
		  | 
Intel Corporation
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 162 ]
		 
	              | 
Proposal for the revision of Recommendation ITU-R M.1036-5 to include frequency arrangement in the band 470-698 MHz
		 
		  | 
Mexico
          	    ,
        	    Micronesia (Federated States of)
          	    ,
        	    New Zealand
          	    ,
        	    Papua New Guinea
          	    ,
        	    Samoa (Independent State of)
          	    ,
        	    Solomon Islands
   		  | 
   		  | 
2016-06-07 | 
 | 
[ 161 ]
		 
	              | 
Assumptions for IMT-2020 transmitter parameters to be used in the adjacent band sharing studies
		 
		  | 
Orange
   		  | 
   		  | 
2016-06-07 | 
Results:1310 total items.  Result page: 	
	 
Previous - 
	1 - 
     	2 - 
     	3 - 
     	4 - 
     	5 - 
     	6 - 
     	7 - 
     	8 - 
     	9 - 
     	10 - 
     	11 - 
     	12 - 
     	13 - 
     	14 - 
     	15 - 
     	16 - 
     	17 - 
     	18 - 
     	19 - 
     	20 - 
     	21 - 
     	22 - 
     	23 -
	24 - 
     	25 - 
     	26 - 
     	27
	   - Next
  
	         | 
Multiple Document Download: Formats and Languages to be included (when available):