International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport, access and home

Study Period 2022

Results:1240 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 40 ]  
 
Discussions on optical-layer OAM requirements for G.FIN system     China Mobile Communications Co. Ltd. , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q3/15   2022-09-01
[ 39 ]  
 
B400G Coherent Point-to-Multipoint (P2MP) Requirements     China Information Communication Technologies Group , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , Infinera Corporation (United States) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q6/15   2022-09-01
[ 38 ]  
 
Propose text for the centralized control architecture for the SA document     Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q3/15   2022-09-01
[ 37 ]  
 
G.IoT: Instant multicast proposal     HiSilicon (Shanghai) Technologies CO., Limited (China)   Q3/15   2022-09-01
[ 36 ]  
 
High accuracy timestamping TLV     Telefon AB - LM Ericsson (Sweden)   Q13/15   2022-08-31
[ 35 ]  
 
G.827x Supplement on FTS PTP profile     Telefon AB - LM Ericsson (Sweden)   Q13/15   2022-08-31
[ 34 ]  
 
Time discontinuities in telecom PTP clocks     Telefon AB - LM Ericsson (Sweden)   Q13/15   2022-08-31
[ 33 ]  
 
Statistically Minimization of Asymmetry using Multiple Paths     Telefon AB - LM Ericsson (Sweden)   Q13/15   2022-08-31
[ 32 ]  
 
Proposal to add MTIE limit for class C at variable temperature     Telefon AB - LM Ericsson (Sweden)   Q13/15   2022-08-31
[ 31 ]  
 
A.1 justification for proposed draft new amendment 2 to Recommendation G.7718     China Information Communication Technologies Group   Q14/15   2022-08-31
[ 30 ]  
 
Propose to study enhanced interactive capability of MCS     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , China Unicom , Huawei Technologies Co., Ltd. (China)   Q14/15, Q12/15   2022-08-31
[ 29 ]  
 
Considerations on OSU frame format evaluation metrics     China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-08-31
[ 28 ]  
 
Proposal for remote performance monitoring of optical modules.     ADVA Optical Networking SE (Germany) , China Unicom , Lumentum (United States) , Telefon AB - LM Ericsson (Sweden)   Q6/15   2022-08-30
[ 27 ]  
 
G.988 plug-in unit types codepoints for 25G and 50G optical interfaces     Nokia Corporation (Finland) , Nokia USA (United States)   Q2/15   2022-08-30
[ 26 ]  
 
G.ploam: Condition to clear the Line Initialization Failure     ADTRAN (United States) , Broadcom Corporation (United States) , Maxlinear Inc (United States) , Nokia Corporation (Finland)   Q4/15   2022-08-30
[ 25 ]  
(Rev.1) 
Updated Proposal for G.owdm Specifications     Ministry of Industry and Information Technology (MIIT) (China) , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China) , ZTE Corporation (China)   Q6/15   2022-08-30
[ 24 ]  
 
Proposals for bit rate and FEC applied in G.owdm     China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q6/15   2022-08-30
[ 23 ]  
 
Considerations of spectrum excursion and channel width for black link in G.owdm     China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q6/15   2022-08-30
[ 22 ]  
 
A use case for PONLatency R2     ZTE Corporation (China)   Q2/15   2022-08-30
[ 21 ]  
 
A use case of cloud VR for eOLT R2     ZTE Corporation (China)   Q2/15   2022-08-30
[ 20 ]  
 
Consideration of G.9804.x specification for different generation PON system     China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q2/15   2022-08-30
[ 19 ]  
 
Considerations on the OOB crosstalk and PSD specification for G.9807.1     ZTE Corporation (China)   Q2/15   2022-08-30
[ 18 ]  
 
Proposal on upstream burst enable and disable time for 50G-PON R2     ZTE Corporation (China)   Q2/15   2022-08-30
[ 17 ]  
 
Suggestions on a new link budget class for industry applications     ZTE Corporation (China)   Q2/15   2022-08-30
[ 16 ]  
(Rev.1) 
WDM-PON Performance monitoring, supervision and defects     China Telecommunications Corporation , ZTE Corporation (China)   Q2/15   2022-08-30
[ 15 ]  
 
Propose the review changes of the FTTR4B supplement     China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q3/15   2022-08-30
[ 14 ]  
 
Modification proposal on draft TR.sdm     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q5/15   2022-08-30
[ 13 ]  
 
Proposals for bit rate and FEC applied in G.owdm  
Duplicate of C24
 
China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q6/15   2022-08-30
[ 12 ]  
 
G.7710: Update configuration management function     China Information Communication Technologies Group , Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q14/15   2022-08-28
[ 11 ]  
 
Proposal A.1 justification for new Amendment 1 to Recommendation G.8151     China Information Communication Technologies Group   Q14/15   2022-08-26
[ 10 ]  
 
Proposal update to A.1 justification for Amendment 1 to Recommendation G.8051     China Information Communication Technologies Group   Q14/15   2022-08-26
[ 9 ]  
 
Proposal A.1 justification for Amendment 2 to Recommendation G.8052.1     China Information Communication Technologies Group , Ericsson Canada, Inc.   Q14/15   2022-08-26
[ 8 ]  
 
Delay mechanisms for packet timing signal fail [G.8275.1] [G.8275.2]     Renesas Electronics Canada Limited   Q13/15   2022-08-19
[ 7 ]  
 
Next Generation Optical Access Networks and coexistence with legacy PONs     Société des Télécommunications du Mali (SOTELMA)   Q2/15   2022-08-09
[ 6 ]  
(Rev.1) 
Multi-Wavelength Passive Optical Networks (MW-PON): Case for Developing Countries     Central African Rep.   Q2/15   2022-08-05
[ 5 ]  
(Rev.1) 
Sharable fibre Optic Infrastructure Installation Components     Rwanda Utilities Regulatory Authority (RURA)   Q7/15, Q5/15   2022-08-01
[ 4 ]  
 
Corrections to Appendix VI of G.8273.2     Calnex Solutions plc. (United Kingdom)   Q13/15   2022-07-28
[ 3 ]  
 
SyncE Transient Testing in G.8273     Calnex Solutions plc. (United Kingdom)   Q13/15   2022-07-28
[ 2 ]  
 
G.8272.1 text modification     Deutsche Telekom AG (Germany)   Q13/15   2022-07-25
[ 1 ]  
 
Title, mandate, lead roles, points of guidance and Questions for ITU-T Study Group 15 in the study period 2022-2024     World Telecommunication Standardization Assembly (WTSA-20)   QALL/15   2022-03-21
Results:1240 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-07-05