Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 596 ]
|
The specification of EUHT 5G Radio Interface Technology
|
Nufront (Beijing) Technology Group Co. Ltd.
|
|
2021-05-27 |
|
[ 595 ]
|
Text proposal for the working document towards draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS OF TERRESTRIAL IMT SYSTEMS TOWARDS 2030 AND BEYOND]
|
Spark NZ Limited
|
|
2021-05-27 |
|
[ 594 ]
|
Correspondence received regarding potential focused revision of Recommendation ITU-R M.2150 ("Certification C")
|
Director, BR
|
|
2021-05-26 |
|
[ 593 ]
|
Update on activities in Region 2
|
Region 2 Rapporteur
|
|
2021-05-25 |
|
[ 592 ]
|
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 5C and 7B) WRC-23 agenda item 1.1 - Characteristics of aeronautical systems and maritime systems operating in the frequency band 4 800-4 990 MHz
|
WP 5B
|
|
2021-05-24 |
|
[ 591 ]
|
Liaison statement on work being carried out under study in ITU-T Q3/5
|
ITU-T SG 5
|
|
2021-05-24 |
|
[ 590 ]
|
Proposed updates to working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-23
|
Chairman, SWG Sharing Studies
|
|
2021-05-20 |
|
[ 589 ]
|
Proposed liaison statements to inform detailed schedule for revisions of Recommendations ITU-R M.2150 and ITU-R M.2012
|
Chairman, SWG IMT Specifications
|
|
2021-05-20 |
|
[ 588 ]
|
Draft proposed detailed schedule documents for IMT-2020 'Revision after year 2021' [IMT-2020/58] & for IMT-Advanced Revision 6 [IMT-ADV/32] and proposed Circular Letters for announcement
|
AT&T, Inc.
|
|
2021-05-20 |
|
[ 587 ]
|
Correspondence received regarding the update or Recommendation ITU-R M.2012 to Revision 5 ("Certification B")
|
Director, BR
|
|
2021-05-19 |
|
[ 586 ]
|
Report of Correspondence Group Activities on IMT-Parameters
|
Chairman, CG on IMT Parameters
|
|
2021-05-17 |
|
[ 585 ]
|
Liaison statement to relevant parties - Proposed suppression of the Compendium of ITU's work
on Emergency Telecommunications
|
WP 5A
|
|
2021-05-17 |
|
[ 584 ]
|
Liaison Statement to Task Group 6/1 (copy to Working Parties 6A, 5B and 5D for information) - WRC-23 agenda item 1.5
|
WP 5A
|
AI1.5
|
2021-05-13 |
|
[ 583 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.2
|
WP 5C
|
AI1.2
|
2021-05-13 |
|
[ 582 ]
|
Liaison statement to Working Parties 4A, 5B, 5C and 5D (copy for information to ITU-T FG-VM) - Intelligent Transport Systems
|
WP 5A
|
|
2021-05-13 |
|
[ 581 ]
|
Reply liaison to ITU-T Study Group 11 (copy to ITU-D SG2 Q5/2 and ITU-R Working Parties 5B and 5D) - Disaster Relief Use Cases
|
WP 5A
|
|
2021-05-13 |
|
[ 580 ]
|
Liaison statement on ITS security
|
ITU-T SG 17
|
|
2021-05-12 |
|
[ 579 ]
|
Liaison statement from Working Party 6A to Task Group 6/1 (copy to Working Parties 3K, 3M, 5A, 5B, 5C, 5D, and 7C) - Information regarding the broadcasting service in the band 470-960 MHz in Region 1
|
WP 6A
|
AI1.5
|
2021-05-12 |
|
[ 578 ]
|
Answer to liaison statement to relevant External Organizations on timing of updates to IMT-2020 Recommendation ITU-R M.2150 and IMT-Advanced Recommendation ITU-R M.2012 after year 2021
|
Alliance for Telecommunications Industry Solutions
|
|
2021-05-12 |
|
[ 577 ]
|
Updated material on LTE-Advanced toward Revision 5 of Recommendation ITU-R M.2012
|
Alliance for Telecommunications Industry Solutions
|
|
2021-05-10 |
|
[ 576 ]
|
Final evaluation Report for SRIT submission from ETSI (TC DECT), DECT Forum (Doc. IMT-2020/17(Rev.1)), for Dect-2020 NR component RIT
|
European Telecommunications Standards Institute
|
|
2021-05-10 |
|
[ 575 ]
|
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan
|
ITU-T SG 15
|
|
2021-05-07 |
|
[ 574 ]
|
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan
|
ITU-T SG 15
|
|
2021-05-06 |
|
[ 573 ]
|
Liaison statement to Working Party 5D - Complementary information on the EESS active antenna pattern to be used for sharing and compatibility studies under WRC-23 agenda item 1.2
|
WP 7C
|
AI1.2
|
2021-05-06 |
|
[ 572 ]
|
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan
|
ITU-T SG 9
|
|
2021-05-06 |
|
[ 571 ]
|
Potential template for a new working document for the work in Drafting Group on Article 21.5
|
Chairman, SWG Sharing Studies
|
|
2021-05-05 |
|
[ 570 ]
|
Liaison statement to ITU-R Working Party 4C and Working Party 5D - Protection measures for the operation of MSS terminals utilizing the frequency band 1 518-1 559 MHz from IMT operations in the frequency band 1 427-1 518 MHz
|
International Maritime Organization
|
|
2021-05-04 |
|
[ 569 ]
|
Reply liaison statement to Task Group 6/1 (copied for information to Working Parties 5A, 5B, 5C, 5D and 6A) - Issues related to propagation for sharing studies in Task Group 6/1
|
WPs 3K and 3M
|
AI1.5
|
2021-05-03 |
|
[ 568 ]
|
Liaison statement to 3GPP (copy Working Party 5D) - 3GPP's activities related to WRC-19 Resolutions
|
WP 7C
|
|
2021-04-29 |
|
[ 567 ]
(Rev.1) |
Liaison statement on the latest results on the Vehicular Multimedia deliverables from ITU FG-VM
|
ITU-T FG-VM
|
|
2021-04-28 |
|
[ 566 ]
|
Liaison statement to Working Party 5D - Updated information on EESS (passive) for consideration under WRC-23 agenda item 1.4
|
WP 7C
|
AI1.4
|
2021-04-26 |
|
[ 565 ]
|
Liaison statement to CISPR (Subcommittees B and H) (copy for information to Study Group 1 and Working Parties 1A, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Update to Standard frequency and time signal services protection requirements in the CISPR radio services database
|
WP 7A
|
|
2021-04-26 |
|
[ 564 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, and 5D for information) - WRC-23 agenda item 9.1, topic d)
|
WP 7C
|
AI9.1D)
|
2021-04-26 |
|
[ 563 ]
|
Liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C and 7B for information) - WRC-23 agenda item 1.2 - Additional information on EESS (passive) in 10.6-10.7 GHz
|
WP 7C
|
AI1.2
|
2021-04-23 |
|
[ 562 ]
|
Liaison statement to Working Party 5D - Update to working document towards a preliminary draft new - Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]
|
WP 7D
|
|
2021-04-19 |
|
[ 561 ]
|
Reply liaison statement to Working Party 5D - WRC-23 agenda item 1.2
|
WP 7D
|
AI1.2
|
2021-04-16 |
|
[ 560 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 3K and 3M for information) - Draft new Recommendation ITU-R SA.[IMT-EESS/SRS COORDINATION]
|
WP 7B
|
|
2021-04-15 |
|
[ 559 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 7C and 7D for information) - Reply liaison statement to Working Party 5D
concerning WRC-23 agenda item 1.2
|
WP 7B
|
AI1.2
|
2021-04-15 |
|
[ 558 ]
|
Reply liaison statement to Working Party 5D - Characteristics for studies on WRC-23 agenda item 1.4
|
WP 7B
|
AI1.4
|
2021-04-15 |
|
[ 557 ]
|
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-R Working Parties 5A and 5D on the output Report on Question 2/2 - ITU-D Study Group 2 Question 5/2: Utilizing telecommunications/ICTs for disaster risk reduction and management
|
ITU-D SG 2
|
|
2021-04-14 |
|
[ 556 ]
|
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-R Working Party 5D on output Report of ITU-D Question 2/2 - ITU-D Study Group 2 Question 2/2: Telecommunications/ICTs for e-Health
|
ITU-D SG 2
|
|
2021-04-14 |
|
[ 555 ]
(Rev.1) |
Reply liaison statement on guideline for general test procedure and specification for measurements of the LTE, 3G/2G user equipment/mobile stations (UE/MS) for over the air performance testing
|
ITU-T SG 11
|
|
2021-04-09 |
|
[ 554 ]
|
Liaison statement to Working Party 5D (copy to Working Parties 3K, 3L, 3M, 5A, and 5B) - WRC-23 agenda item 1.4
|
WP 6A
|
AI1.4
|
2021-04-07 |
|
[ 553 ]
|
Preliminary positions on WRC-23 agenda
|
International Amateur Radio Union
|
AI9.1B), AI9.1A), AI1.2, AI1.18, AI1.14, AI1.12
|
2021-04-07 |
|
[ 552 ]
|
Liaison statement from ITU-D Study Group 1 Question 1/1 and Question 5/1 to ITU-R Study Group 5 Working Parties 5D and 5A on collaboration
|
ITU-D SG 1
|
|
2021-03-30 |
|
[ 551 ]
|
Reply liaison statement on test methods for over-the-air TRP field measurements of unwanted emissions from IMT radio equipment utilizing active antennas
|
Director, BR
|
|
2021-03-29 |
|
[ 550 ]
|
Liaison to Working Party 4B on the integration of satellite solutions into 5G networks (copy to Working Party 5D)
|
Director, BR
|
AI8.5
|
2021-03-29 |
|
[ 549 ]
|
Open contribution or review of final multi-channel operations study results, final draft ETSI TR 103 439 from ETSI TC ITS - Intelligent transport systems (ITS); Multi-channel operation study; Release 2
|
ETSI TC ITS
|
|
2021-03-29 |
|
[ 548 ]
|
Liaison statement on invitation to provide inputs to the roadmap of AI activities for natural disaster management
|
ITU-T (FG-AI4NDM)
|
|
2021-03-26 |
|
[ 547 ]
|
Reply liaison statement on parameters of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-23 (6.425 TO 10.5 GHz)
|
Director, BR
|
|
2021-03-22 |
Resultados :1796 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):