Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 60 ]
|
Work of the Correspondence Group on the Digital Dividend - Derivation and implementation of the "Digital Dividend" - a European perspective
|
British Broadcasting Corporation (BBC)
|
|
2013-06-05 |
|
[ 59 ]
|
CISPR response to Question ITU-R 210-3/1 brought to their attention
|
Director, BR
|
|
2013-05-31 |
|
[ 58 ]
|
Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013)
|
Chairman, BR SG 1
|
|
2013-05-30 |
|
[ 57 ]
|
Proposal for work during the June 2013 meeting of Working Party 1B
|
Chairman, SG 1 CG on Digital Dividend Issues
|
|
2013-05-21 |
|
[ 56 ]
|
Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012)
|
Chairman, SG 1
|
|
2013-05-16 |
|
[ 55 ]
|
Liaison statement on nomination of JCA-AHF representatives
|
ITU-T JCA-AHF
|
|
2013-05-14 |
|
[ 54 ]
|
Recommendation ITU-R SM. 329 - Editorial correction in English version
|
Israel (State of)
|
|
2013-04-25 |
|
[ 53 ]
|
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)
|
ITU-T FG-DR&NRR
|
|
2013-04-17 |
|
[ 52 ]
|
Liaison statement to ITU-R Study Groups 1, 3, 4, 5, 6 and 7 - ITU-R Study Groups Vocabulary Work
|
CCV
|
|
2012-11-16 |
|
[ 51 ]
|
Liaison statement from ITU-D Study Group 1 - Invitation to participate in and provide input to the work of the Correspondence Group on the Elaboration of a Working Definition of the Term "ICT"
|
ITU-D SG 1
|
|
2012-10-24 |
|
[ 50 ]
|
Liaison statement to Study Group 1 (copy to Working Party 1A) - Active services operating above 275 GHz
|
WP 7D
|
|
2012-10-10 |
|
[ 49 ]
|
Editorial revision of Annexes 1 and 2 to Recommendation ITU-R SM.1875 - DVB-T coverage measurements and verification of planning criteria
|
Chairmen, SG 1 and WP 1C
|
|
2012-06-27 |
|
[ 48 ]
|
Study Group 5 Recommendation ITU-R M.1581-4 to be brought to the attention of Study group 1
|
SG 5
|
|
2012-06-27 |
|
[ 47 ]
|
Study Group 5 Recommendation ITU-R M.1580-4 to be brought to the attention of Study Group 1
|
SG 5
|
|
2012-06-27 |
|
[ 46 ]
+Ann.1 |
Summary record of the meeting of Radiocommunication Study Group 1 (Geneva, 14 June 2012)
|
Chairman, SG 1
|
|
2012-06-18 |
|
[ 45 ]
|
Final list of Participants - Geneva, 14 June 2012
|
Chairman, SG 1
|
|
2012-06-15 |
|
[ 44 ]
|
List of documents issued
|
BR Study Groups Department
|
|
2012-06-14 |
|
[ 43 ]
|
Executive Report of the meeting of Working Party 1B (Geneva, 6 - 13 June 2012)
|
Chairman, WP 1B
|
|
2012-06-13 |
|
[ 42 ]
|
Executive Report of the meeting of Working Party 1A (Geneva, 6-13 June 2012)
|
Chairman, WP 1A
|
|
2012-06-13 |
|
[ 41 ]
+Corr.1 |
Executive Report of the meeting of Working Party 1C (Geneva, 6 - 13 June 2012)
|
Vice-Chairman, WP 1C
|
|
2012-06-13 |
|
[ 40 ]
|
Draft revision of Question ITU-R 210-2/1 - Wireless power transmission
|
WP 1A
|
|
2012-06-13 |
|
[ 39 ]
(Rev.1) |
Draft modification of Recommendation ITU-R SM.329-11 - Unwanted emissions in the spurious domain
|
WP 1A
|
|
2012-06-13 |
|
[ 38 ]
(Rev.1) |
Draft editorial revision of Section 2.2 in Annex 1 to Recommendation ITU-R SM.1875 - DVB-T coverage measurements and verification of planning criteria
|
WP 1C
|
|
2012-06-13 |
|
[ 37 ]
|
Proposed suppression of Questions assigned to Working Party 1C
|
WP 1C
|
|
2012-06-13 |
|
[ 36 ]
|
Proposed suppression of ITU-R Recommendations assigned to Working Party 1C
|
WP 1C
|
|
2012-06-13 |
|
[ 35 ]
(Rev.1) |
Draft new Report ITU-R SM.[406MHZIX] - Overview of interference source detection and geolocation affecting the 406.0-406.1 MHz band used by emergency beacons
|
WP 1C
|
|
2012-06-13 |
|
[ 34 ]
(Rev.1) |
Draft new Report ITU-R SM.[SPECT_OCCUPANCY] - Spectrum occupancy measurements and evaluation
|
WP 1C
|
|
2012-06-13 |
|
[ 33 ]
(Rev.1-2) |
Draft revision of Recommendation ITU-R SM.1753-1 - Methods for measuring radio noise
|
WP 1C
|
|
2012-06-13 |
|
[ 32 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1600 - Technical identification of digital signals
|
WP 1C
|
|
2012-06-13 |
|
[ 31 ]
(Rev.1) |
Draft new Report ITU-R SM.[MAJOR_EVENTS] - Spectrum management and monitoring during major events
|
WPs 1B and 1C
|
|
2012-06-12 |
|
[ 30 ]
(Rev.1) |
Draft new Recommendation ITU-R SM.[INDUCTIVE_SYS] - Protection distance calculation between inductive systems and radiocommunication services using frequencies below 30 MHz
|
WP 1A
|
|
2012-06-12 |
|
[ 29 ]
|
Draft new Opinion ITU-R [PROT-RR-SERV] - Compatibility considerations regarding the use of radio frequencies for purposes not considered within the Radio Regulations or other relevant ITU publications
|
WP 1B
|
|
2012-06-12 |
|
[ 28 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1047-1 - National spectrum management
|
WP 1B
|
|
2012-06-12 |
|
[ 27 ]
|
Draft liaison statement from Study Group 1 to Study Groups 3, 4, 5 and 7 - Active services operating above 275 GHz
|
WP 1A
|
|
2012-06-12 |
|
[ 26 ]
(Rev.1) |
Draft modification of Report ITU-R SM.2212 - Impact of power line telecommunication systems on radiocommunication systems operating in the VHF and UHF bands above 80 MHz
|
WP 1A
|
|
2012-06-12 |
|
[ 25 ]
(Rev.1) |
Draft editorial revision of Section 3.2.1.1 of Report ITU-R SM.2125-1 - Parameters of and measurement procedures on H/V/UHF monitoring receivers and stations
|
WP 1C
|
|
2012-06-12 |
|
[ 24 ]
(Rev.1) |
Draft modification of Report ITU-R SM.2153-2 - Technical and operating parameters and spectrum use for short-range radiocommunication devices
|
WP 1B
|
|
2012-06-12 |
|
[ 23 ]
(Rev.1) |
Draft new Report ITU-R SM.[RFID]- Technical characteristics, standards and frequency bands of operation for RFID and potential harmonization opportunities
|
WP1B
|
|
2012-06-12 |
|
[ 22 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1603 - Spectrum redeployment as a method of national spectrum management
|
WP 1B
|
|
2012-06-12 |
|
[ 21 ]
|
Liaison statement to ITU-T Study Group 15 regarding G.wnb, narrow-band wireless home networking (copy to ITU-R Study Group 1, Working Party 5D)
|
WP 5A
|
|
2012-06-05 |
|
[ 20 ]
|
Liaison statement to relevant Working Parties of Study Group 5 on further studies on cognitive radio systems (CRS) (copy for information to relevant Working Parties of Study Groups 1, 4, 6 and 7)
|
WP 5A
|
|
2012-06-05 |
|
[ 19 ]
|
Resolution ITU-R 58 - Studies on cognitive radio systems
|
Canada
|
|
2012-05-30 |
|
[ 18 ]
|
Recent developments on Smart Grid and PLT involving spectrum management
|
British Broadcasting Corporation(BBC)
|
|
2012-05-30 |
|
[ 17 ]
|
Human exposure to electromagnetic fields: Measurement and assessment
|
Israel (State of)
|
|
2012-05-29 |
|
[ 16 ]
|
Summary of the Results of RA-12 and CPM15-1
|
Chairman, SG 1
|
|
2012-05-15 |
|
[ 15 ]
|
Liaison statement to Study Group 1 and Working Party 1A, and for information to ITU-T Study Group 15 - Question ITU-R 236/1 - Impact on radiocommunication systems from wireless and wired data transmission technologies used for the support of power grid management systems
|
WP 6A
|
236/1
|
2012-05-14 |
|
[ 14 ]
|
Liaison statement to ITU-R Study Group 1 regarding draft amendment 1 to Recommendation ITU-T G.9955 (2011) (ex G.hnem)
|
ITU-T SG 15
|
|
2012-05-14 |
|
[ 13 ]
|
Liaison to ITU-R Study Group 1 regarding G.wnb, narrowband wireless home networking
|
ITU-T SG 15
|
|
2012-05-14 |
|
[ 12 ]
|
Liaison statement to ITU-R Study Group 1 and Working Party 1A - Designation of frequencies for purposes not considered in the Radio Regulations
|
WP 6A
|
|
2012-05-10 |
|
[ 11 ]
|
Liaison statement - Resolution ITU-R 60
|
ITU-T SG 5
|
|
2012-05-07 |
Results:185 total items. Result page:
Previous -
1 -
2 -
3 -
4
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):