Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1813 ]
(Rev.1) |
Protection Switching Interwoirking
|
Ericsson UK
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1812 ]
|
Withdrawn, duplicate
Withdrawn
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1811 ]
(Rev.1) |
[G.fast] TDD Framing Parameters for G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1810 ]
(Rev.1) |
Comments on the draft G.7044
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q11/15
|
2011-11-22 |
|
[ 1809 ]
(Rev.1) |
Consideration of APS communication and protection architectures for Ethernet rooted multipoint connection protection
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1808 ]
(Rev.1) |
Text proposal for clause 15 "Mapping of client signals" in new Recommendation G.8012.1
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1807 ]
(Rev.1) |
A proposal of the modification for the draft G.7044
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q11/15
|
2011-11-22 |
|
[ 1806 ]
(Rev.1) |
G.fast: Requirements for a FTU-O transceiver operating in VDSL2 mode
|
France Télécom Orange
,
Telecom Italia S.p.A.
|
Q4/15
|
2011-11-22 |
|
[ 1805 ]
(Rev.1) |
Introduction of the super timeslots for ODU5
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2011-11-22 |
|
[ 1804 ]
|
Avoiding an unsatisfactory outcome of the MPLS-TP OAM standardisation
|
France
|
QALL/15
|
2011-11-22 |
|
[ 1803 ]
(Rev.1) |
Multi-VID ETH MEP and MIP functions
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1802 ]
(Rev.1) |
Progress on ICCP extension for the MSP application
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1801 ]
(Rev.1) |
Text proposal for Annex A "P2P, RMP, MP2MP, Hairpin Ethernet Connection Identifiers" of G.8012.1
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1800 ]
(Rev.1) |
Propose to improve the throughput measurement defined in Y.1731
|
China Mobile Communications Corporation
,
China Unicom
,
ZTE Corporation
|
Q10/15
|
2011-11-22 |
|
[ 1799 ]
(Rev.1) |
Comments and proposals on G.8131.1 text
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1798 ]
(Rev.1) |
Assessing the use of existing optical fibre links
|
Telecom Italia S.p.A.
|
Q5/15, Q18/15, Q17/15
|
2011-11-22 |
|
[ 1797 ]
(Rev.1) |
Proposals on the conditions for dLOC and dUNP defined in G.8021
|
China
,
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1796 ]
(Rev.1) |
Consideration of agenda items for p2mp protection switching
|
Hitachi, Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1795 ]
(Rev.1) |
G.8012 - G.8012.1 relationship
|
Huawei Technologies Co. Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1794 ]
(Rev.1) |
Comment on p2mp protection switching documentation
|
Hitachi, Ltd.
|
Q9/15, Q10/15
|
2011-11-22 |
|
[ 1793 ]
(Rev.1) |
Operator needs in the New Generation Network deployment
|
Telecom Italia S.p.A.
|
Q5/15, Q18/15, Q17/15
|
2011-11-22 |
|
[ 1792 ]
(Rev.1) |
Consideration of hierarchical EVPRM architecture
|
Hitachi, Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1791 ]
(Rev.1) |
Clarification of EVPRM service type description
|
Hitachi, Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1790 ]
(Rev.1) |
Consideration of Multi-root EVPRM architecture
|
Hitachi, Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1789 ]
(Rev.1) |
Ethernet NNI and UNI information containment relationships
|
Huawei Technologies Co. Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1788 ]
(Rev.1) |
Consideration of the applicability of currently defined EVPRM architecture
|
Hitachi, Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1787 ]
(Rev.1) |
Proposal for the modification of EVPRM type classification
|
Hitachi, Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1786 ]
(Rev.1) |
Text proposal for Annex B "EVC <-> EC Peering and EVC <=> EC Client/Server Relationships" in new Recommendation G.8012.1
|
Huawei Technologies Co. Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1785 ]
(Rev.1) |
Terms for rooted multipoint (RMP) tree
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1784 ]
(Rev.1) |
Comments on Multi-root EVPRM service model in G.8011.4
|
Hitachi, Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1783 ]
(Rev.1) |
Proposed text for G.8011.4 clause 6.2
|
Hitachi, Ltd.
|
Q10/15
|
2011-11-22 |
|
[ 1782 ]
|
Withdrawn: reposted as TD240/WP2 - Characteristics of monitoring systems for optical fibre submarine cable systems
Withdrawn
|
Huawei Technologies Co. Ltd.
|
Q8/15
|
2011-11-22 |
|
[ 1781 ]
|
Withdrawn by author
Withdrawn
|
Hitachi, Ltd.
|
Q3/15
|
2011-11-22 |
|
[ 1780 ]
(Rev.1) |
Consideration on PTP over OTN solution options
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2011-11-22 |
|
[ 1779 ]
(Rev.1) |
Ethernet transport network node and port examples for inclusion in G.8021.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1778 ]
(Rev.1) |
Update 1+1 SNC/N protection descriptions in clause 11.2/G.808.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1777 ]
(Rev.1) |
Suggestion to improve existing CBTS back-off rules
|
ZTE Corporation
|
Q4/15
|
2011-11-22 |
|
[ 1776 ]
|
Multi layer optimization alternatives associated with Ethernet Service support
|
Huawei Technologies Co. Ltd.
|
Q12/15
|
2011-11-22 |
|
[ 1775 ]
(Rev.1) |
Proposal for the structure modification of G.8101
|
Hitachi, Ltd.
|
Q3/15
|
2011-11-22 |
|
[ 1774 ]
(Rev.1) |
Consideration of the relationship between G.8001 and G.8101
|
Hitachi, Ltd.
|
Q3/15
|
2011-11-22 |
|
[ 1773 ]
(Rev.1) |
Proposed alignment between G.8001 and G.8101
|
Hitachi, Ltd.
|
Q3/15
|
2011-11-22 |
|
[ 1772 ]
(Rev.1) |
Development of PTP time transport HRMs that encompass OTN
|
Alcatel-Lucent Italia S.p.A.
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-22 |
|
[ 1771 ]
(Rev.1) |
Comment list of G.multi
|
Huawei Technologies Co. Ltd.
|
Q2/15
|
2011-11-22 |
|
[ 1770 ]
(Rev.1) |
Modification to MPLS PW related MEs
|
Huawei Technologies Co. Ltd.
|
Q2/15
|
2011-11-22 |
|
[ 1769 ]
(Rev.1) |
Scope of G.smp
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1768 ]
(Rev.1) |
Protection GEM Port for Port Correlation
|
Huawei Technologies Co. Ltd.
|
Q2/15
|
2011-11-22 |
|
[ 1767 ]
|
Withdrawn; Duplicate of C-1768 - Protection GEM Port for Port Correlation
Withdrawn
|
Huawei Technologies Co. Ltd.
|
Q2/15
|
2011-11-22 |
|
[ 1766 ]
(Rev.1) |
Proposed RFID tag experience for ODN in China
|
ZTE Corporation
|
Q17/15
|
2011-11-22 |
|
[ 1765 ]
(Rev.1) |
G.fast: Reverse powering over twisted pair
|
ZTE Corporation
|
Q4/15
|
2011-11-22 |
|
[ 1764 ]
(Rev.1) |
A protection switching method by re-using EqD values in GPON or XG-PON1
|
ZTE Corporation
|
Q2/15
|
2011-11-22 |
Results:420 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):