Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2088 ]
(Rev.1) |
Synchronization OAM
|
ZTE Corporation
|
Q14/15, Q13/15
|
2016-09-06 |
|
[ 2087 ]
|
G.fast: INM procedure and control parameters
|
Intel Corporation
|
Q4/15
|
2016-09-06 |
|
[ 2086 ]
|
G.fast: The next generation of DSL beyond current G.fast
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
Swisscom SA
|
Q4/15
|
2016-09-06 |
|
[ 2085 ]
|
Requirements for a common service information model
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q14/15
|
2016-09-06 |
|
[ 2084 ]
|
G.fast: Revising ETR_min and ETR_min_eoc
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2083 ]
|
G.fast: Simulation results on linear precoding and non-linear precoding
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2082 ]
|
Adding a note to clarify PRMPSDds
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2081 ]
|
APTS network limit of G.8271.2 and noise generation of G.8273.4
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2080 ]
|
G.vector: Extending pilot sequence length to 1024
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2079 ]
|
Proposals for G.8266 clock with GNSS receiver and G.8272.1 scope
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2078 ]
|
G.vector: Supporting zero bits and measuring QLN based on zero bits
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2077 ]
|
SyncE clock ID of G.8264
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2076 ]
|
G.vlc: Multi-pulse Pulse Position Modulation with dimming support
|
Futurewei Technologies US R&D Center
|
Q18/15
|
2016-09-06 |
|
[ 2075 ]
|
Sub-Nyquist Artefacts and Sampling Moiré Effects when Measuring PTP to PTP and PTP to 1 PPS Noise Transfer (G.8272.3, G.supp)
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2074 ]
|
Proposed notes for 7.3.1/G.8273.2 (PTP to PTP noise transfer) and C.2.3.1/G.8273.2 (PTP to 1PPS noise transfer)
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2073 ]
|
Miscellaneous Proposals for Revised Recommendation G.781
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2072 ]
|
Initial Simulation Results for Wander Accumulation in a Chain of eEECs (G.8262.1, G.supp)
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2071 ]
|
G.8275.2 - Deny service
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2070 ]
(Rev.1) |
Same path of SyncE frequency and PTP time
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2069 ]
|
OMCI management support for XGS-PON
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q2/15
|
2016-09-06 |
|
[ 2068 ]
|
Short-term phase transient and phase discontinuity of G.8266
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2067 ]
|
Wide-Band Jitter Accumulation Simulation Results for Transport of Higher-Rate Ethernet Clients over B100G OTN based on Multiple Replications
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2066 ]
|
Proposals on Chinese experience in revision of Rec. L.79
|
FiberHome Technologies Group
|
Q16/15
|
2016-09-06 |
|
[ 2065 ]
|
Proposed future ONU management reference model in G.988
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2016-09-06 |
|
[ 2064 ]
|
Proposed G.FAST updates in G.988
|
Huawei Technologies Co., Ltd.
|
Q2/15
|
2016-09-06 |
|
[ 2063 ]
|
Evolution of G.hn: Inclusion of full duplex mechanism in G.hn evolution
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-09-05 |
|
[ 2062 ]
|
G.hn: Contents of the MAP-D frame
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-09-05 |
|
[ 2061 ]
|
G.fast: On robustness and recovery of G.fast link
|
Intel Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2060 ]
(Rev.1-3) |
Calling for Fundamental Solution for Cascaded and Nested Protection of Multiple OTN Domains for Future OTN Network
|
China Unicom
|
Q9/15
|
2016-09-05 |
|
[ 2059 ]
|
Solution for Avoiding Sympathetic Switching in ODUk SNC/S Protected Domains
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2016-09-05 |
|
[ 2058 ]
|
G.fast: Comments on draft text of G.9701 Amendment 3
|
Intel Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2057 ]
|
Proposal on new Recommendation "Optical fibre cables for in-home directly wall surface applications"
|
China Unicom
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q16/15
|
2016-09-05 |
|
[ 2056 ]
(Rev.1) |
Propose to start the standardization of longitudinal compatibility of repeatered system
|
China Mobile Communications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
,
Orange
|
Q8/15
|
2016-09-05 |
|
[ 2055 ]
|
G.fast: G.fast Non-linear precoding simulation conditions: Imperfect Channel State Information (background)
|
Alcatel-Lucent International
|
Q4/15
|
2016-09-05 |
|
[ 2054 ]
|
Proposal on new specifications of PRTC in G.8272
|
China Unicom
|
Q13/15
|
2016-09-05 |
|
[ 2053 ]
|
Requirement of define a detailed OSC frame format for use case of Open ROADM
|
China Unicom
|
Q11/15
|
2016-09-05 |
|
[ 2052 ]
|
Requirement of clarify optical layer parameter for some new use cases
|
China Unicom
|
Q9/15, Q6/15
|
2016-09-05 |
|
[ 2051 ]
|
Proposal on "position maintenance" work pattern of PRTC GNSS receiver
|
China Unicom
|
Q13/15
|
2016-09-05 |
|
[ 2050 ]
|
1588 network performance monitoring mechanism
|
China Unicom
|
Q13/15
|
2016-09-05 |
|
[ 2049 ]
|
G.fast: General framework of INM method
|
Broadcom Corporation
,
Intel Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2048 ]
|
Proposal for external ID tag detection of non-contact type ID tags on passive node elements
|
China Unicom
|
Q16/15
|
2016-09-05 |
|
[ 2047 ]
|
Wavelength plan consideration of G.metro
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2016-09-05 |
|
[ 2046 ]
|
Test results of G.654 terrestrial field trials in China Unicom
|
China Unicom
|
Q5/15
|
2016-09-05 |
|
[ 2045 ]
|
Proposal to study OSNR related issues of beyond 100G physical interface
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2016-09-05 |
|
[ 2044 ]
|
Proposal of communication channel from TEE to HEE in G.metro
|
China Unicom
|
Q6/15
|
2016-09-05 |
|
[ 2043 ]
|
EVM related test results
|
China Unicom
|
Q6/15
|
2016-09-05 |
|
[ 2042 ]
|
Leap second behaviour on PTP clocks [G.8265.1, G.8275.1, G8275.2]
|
Cisco Systems, Inc.
|
Q13/15
|
2016-09-05 |
|
[ 2041 ]
|
Request for information about the SG15/Q6 working process and time schedule to address the application codes and use cases of operators, as well as their interoperability needs at 100G.
|
China Telecommunications Corporation
,
Orange
|
Q6/15
|
2016-09-05 |
|
[ 2040 ]
(Rev.1) |
PRIMEX (G.9904.1) for consent
|
STMicroelectronics
|
Q15/15
|
2016-09-05 |
|
[ 2039 ]
|
G.Fast: Application reference model(s) for coax
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
Results:2210 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):