Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 315 ]
|
Text for Annex A of G.8273 section A.1.x
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 314 ]
|
Text for Annex A of G.8273 section A.1
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 313 ]
|
Further discussion regarding definition of "floor" in time-transfer application
|
Ixia
,
Symmetricom
|
Q13/15
|
2013-06-18 |
|
[ 312 ]
|
Discussion regarding definition of "floor" in time-transfer application
|
Ixia
,
Symmetricom
|
Q13/15
|
2013-06-18 |
|
[ 311 ]
|
Analysis of Cluster-width and packet-selection window interaction
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 310 ]
|
Normal operation of telecom-grade network elements for supporting packet-based timing
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 309 ]
|
Figures for measurement of combined (PRTC+T-GM)
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 308 ]
|
Network Limit at Reference points C and D in G.8271.1
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 307 ]
|
G.fast: Proposal for discontinuous operation
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 306 ]
|
G.fast: Proposal for Representation of Reported Error Samples
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 305 ]
|
G.fast: DTUs acknowledgment working text
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 304 ]
|
G.fast: Fast OLR behaviour under impulsive noise environment
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 303 ]
|
G.fast: Robust OLR protocol
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 302 ]
|
G.8275.1: Clarification on the contents of Announce Messages
|
Juniper Networks
|
Q13/15
|
2013-06-17 |
|
[ 301 ]
|
G.8273.2: Packet Selection for T-BCs and T-TSCs for PTP Time/Phase Profiles
|
Juniper Networks
|
Q13/15
|
2013-06-17 |
|
[ 300 ]
|
Proposal to add an appendix for MPLS-TP packet data throughput to G.8112
|
Electronics and Telecommunications Research Institute (ETRI)
,
SK Telecom
|
Q10/15
|
2013-06-17 |
|
[ 299 ]
|
Network media channel filtering considerations
|
Infinera Corporation
|
Q6/15, Q12/15, Q11/15
|
2013-06-17 |
|
[ 298 ]
|
PtP WDM guard band definition
|
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2013-06-17 |
|
[ 297 ]
|
Requirements for multichannel CWDM systems with multi sub-channel interface
|
Ericsson-LG
,
SK Telecom
|
Q6/15
|
2013-06-17 |
|
[ 296 ]
|
Revision of network limits in G.8271.1
|
Calnex Solutions Limited
,
Huawei Technologies Co. Ltd.
,
Telefon AB - LM Ericsson
|
Q13/15
|
2013-06-17 |
|
[ 295 ]
(Rev.1) |
Mitigation of time error due to SyncE transients in G.8273.2
|
Telefon AB - LM Ericsson
|
Q13/15
|
2013-06-17 |
|
[ 294 ]
|
Coexistence of different profiles in G.8275
|
Telefon AB - LM Ericsson
|
Q13/15
|
2013-06-17 |
|
[ 293 ]
|
G.hn: Proposal to clarify long inactivity procedures in G.hn
|
Marvell Semiconductor Inc.
|
Q18/15
|
2013-06-17 |
|
[ 292 ]
|
G.hn: Implementation of agreement 5.178 on TCP efficiency using bidirectional transmissions
|
Marvell Semiconductor Inc.
|
Q18/15
|
2013-06-17 |
|
[ 291 ]
(Rev.1) |
G.hn: Update of G.9962 Amendment 1 to complete the data model with diagnosis information
|
Marvell Semiconductor Inc.
|
Q18/15
|
2013-06-17 |
|
[ 290 ]
(Rev.1) |
Proposal to update Figure 9-1 of G.8021
|
NEC Corporation
|
Q14/15, Q10/15
|
2013-06-17 |
|
[ 289 ]
(Rev.1) |
Proposed modification of PM terminologies in G.8021
|
NEC Corporation
|
Q10/15
|
2013-06-17 |
|
[ 288 ]
(Rev.1) |
Proposed correction of MAC DA specification in G.8013
|
NEC Corporation
|
Q9/15, Q10/15
|
2013-06-17 |
|
[ 287 ]
(Rev.1) |
Comments on the scope and some definitions of G.808.2
|
NEC Corporation
|
Q9/15
|
2013-06-17 |
|
[ 286 ]
|
G.fast: TDD-frame and super-frame structure working text
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 285 ]
|
G.cmsr: Interfacing with G.9903
|
Panasonic Corporation
|
Q15/15
|
2013-06-17 |
|
[ 284 ]
(Rev.1) |
Q13/15 Synchronization Requirements Structure
|
Deutsche Telekom AG
|
Q13/15
|
2013-06-17 |
|
[ 283 ]
|
G.hn: Update of G.9961 Amendment 2 to complete "Test Vectors" section
|
Marvell Semiconductor Inc.
|
Q18/15
|
2013-06-17 |
|
[ 282 ]
|
WDM for Metro and Backhaul
|
AT&T, Inc.
|
Q6/15
|
2013-06-17 |
|
[ 281 ]
(Rev.1) |
Proposed revisions to ITU-T Recommendation G.652
|
Corning Incorporated
|
Q6/15, Q5/15, Q2/15
|
2013-06-17 |
|
[ 280 ]
|
G.fast: Scrambler working text
|
Lantiq Beteiligungs-GmbH & Co. KG
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 279 ]
|
OSNR and DGD tolerance investigation for 100G DP-QPSK optical signals
|
Telecom Italia S.p.A.
|
Q6/15
|
2013-06-17 |
|
[ 278 ]
|
Beyond 100G OTN relationships to IEEE Standardization Schedule
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2013-06-17 |
|
[ 277 ]
|
ODUflex hitless resizing beyond 100G
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2013-06-17 |
|
[ 276 ]
|
Multi-vendor IaDI
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2013-06-17 |
|
[ 275 ]
|
Re-arrangement times for G.8271.1 HRM topologies
|
Alcatel-Lucent USA Inc.
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 274 ]
|
Development of Slave Clock Specifications for Different Use Cases
|
Sprint
|
Q13/15
|
2013-06-17 |
|
[ 273 ]
|
Timing for standardization of OTN beyond 100G
|
Alcatel-Lucent USA Inc.
|
Q6/15, Q11/15
|
2013-06-17 |
|
[ 272 ]
(Rev.1) |
Service Requirements for Manageable Synchronization Infrastructure
|
Alcatel-Lucent USA Inc.
,
Sprint
|
Q13/15
|
2013-06-17 |
|
[ 271 ]
|
ODU SMP Signalling Options
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-17 |
|
[ 270 ]
|
Unified ONU power management
|
ZTE Corporation
|
Q2/15
|
2013-06-17 |
|
[ 269 ]
|
Availability/Outage times for ODUSMP
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-17 |
|
[ 268 ]
|
Activation in TWDM-PON system
|
ZTE Corporation
|
Q2/15
|
2013-06-17 |
|
[ 267 ]
|
Proposal for PLOAM messages for tuning function in NG-PON2 TC layer during normal operation
|
ZTE Corporation
|
Q2/15
|
2013-06-17 |
|
[ 266 ]
|
Proposal to close the item 11 in G.987.3A2 living list with answer for "ANNEX" approach
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
ZTE Corporation
|
Q2/15
|
2013-06-17 |
Resultados :440 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):