International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN GSI : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN GSI  C 

ITU-T NGN GSI

NGN Global Standards Initiative

Study Period 2005

Results:1303 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 53 ]  
(Rev.1) 
Introduction to A-IMS (Advances to IMS)     Verizon   Q2/19, Q3/13, Q6/13, Q1/11   2006-10-13
[ 52 ]  
(Rev.1) 
Updated text for Draft new ITU-T Recommendation Y.mplsccpi     Editor   Q12/13   2006-10-13
[ 51 ]  
 
Updated text for Draft new ITU-T Recommendation Y.mplstcpi     Editor   Q12/13   2006-10-13
[ 50 ]  
 
Porposed Additions to the draft VoIP SIP UNI Specification     Verizon , Nortel   Q3/11   2006-10-13
[ 49 ]  
 
Accelerating progress in Y.ET-TECH     Cisco Systems , AT&T   Q3/13   2006-10-13
[ 48 ]  
 
Section 6.4 for Y.flowreq - Preference     Anagran Inc.   Q4/13   2006-10-13
[ 47 ]  
 
Proposed Outline for Draft Y.NGN IdM Security     Telcordia Technologies   Q15/13   2006-10-13
[ 46 ]  
 
Considerations for Work on Requirements for Security Aspects of NGN Identity Management     Telcordia Technologies   Q15/13   2006-10-13
[ 45 ]  
 
Next Generation Network (NGN) Identity Management (IdM)     Telcordia Technologies   Q15/13   2006-10-13
[ 44 ]  
 
Proposed Changes to Draft Y.NGN Authentication Sections 6 and 7     Telcordia Technologies , AT&T   Q15/13   2006-10-13
[ 43 ]  
 
Clarification and further study issues in Y.ngn-openenv     ETRI   Q2/13   2006-10-13
[ 42 ]  
 
Overall study structure of Open Service Environments     ETRI   Q2/13   2006-10-13
[ 41 ]  
 
Architectural Study Gramework for IPTV over NGN     ETRI   Q3/13   2006-10-13
[ 40 ]  
 
Proposed changes to draft Recommendation Y.tfo-ip     Nortel Networks (Canada)   Q7/13   2006-10-13
[ 39 ]  
 
Proposed changes to draft Recommendation Y.emsim     Nortel Networks (Canada)   Q7/13   2006-10-13
[ 38 ]  
 
NGN Identity Management Requirements     Nortel Networks , Lucent Technologies , VeriSign , AT&T   Q15/13   2006-10-13
[ 37 ]  
 
MDS Service Scenarios     Korea Telecom   Q8/13, Q2/13   2006-10-13
[ 36 ]  
 
MDS Functions and architectural requirements     Korea Telecom   Q3/13, Q2/13   2006-10-13
[ 35 ]  
 
General service requirements of MDS     Korea Telekom   Q2/13   2006-10-13
[ 34 ]  
 
MDS Service and Provisioning Types     Korea Telecom   Q2/13   2006-10-13
[ 33 ]  
 
Current baseline text for Y.cgoe-cmpts Annex alm.mgr     Editor   Q16/13   2006-10-12
[ 32 ]  
 
LS - RACS-RACF     ETSI-TISPAN WG2 on Architecture   Q4/13   2006-10-12
[ 31 ]  
 
Audit procedure     MII, People's Republic of China   Q5/11   2006-10-12
[ 30 ]  
 
Editor's revision of Recommendation Q.rpc.3     MII, People's Republic of China   Q5/11   2006-10-12
[ 29 ]  
 
Current baseline text for draft Recommendation Y.cgoe     Editor   Q16/13   2006-10-12
[ 28 ]  
 
Proposed Text for Reference Point Rc of RACF-R2     Hitachi, Ltd.   Q4/13   2006-10-12
[ 27 ]  
 
Proposed Material For Q.rsf (Signalling Flows for RACF)     Reliance Communications, India   Q5/11   2006-10-12
[ 26 ]  
 
Proposal to introduce Inter-CN Location Management Architecture in Rec.LMF     Korea Telecom   Q6/13, Q2/19   2006-10-11
[ 25 ]  
 
Q.rcp1- Need for New Server Initiated Commands for Stateless PD-PE Case     Reliance Communications, India   Q5/11   2006-10-06
[ 24 ]  
(Rev.1) 
Proposed text for Security and Interoperability clauses in Y.wscon     Nortel , ETRI   Q8/13   2006-10-04
[ 23 ]  
 
Updated draft Recommendation "High level architecture of Future Packet Based Networks"     Temporary editor   Q13/13   2006-10-03
[ 22 ]  
 
Updated draft "Fundamental characteristics and requirements of Future Packet Based Networks"     Temporary editor   Q13/13   2006-10-03
[ 21 ]  
(Rev.1) 
Q.rcp1 - Addition of a New AVP - "Resource-Reservation-Mode"  
Original document has been withdrawn
 
Reliance Communications, India   Q5/11   2006-10-03
[ 20 ]  
 
Q.rcp1 - Addition of AVP "Event-Timestamp" in ASR     Reliance Communications, India   Q5/11   2006-10-03
[ 19 ]  
 
Q.rcp1 - Mapping with Stage 2     Reliance Communications, India   Q5/11   2006-10-03
[ 18 ]  
 
Q.rcp1 - Use of Authorization-Token For Session Modification (Stateless PD-PE Case)     Reliance Communications, India   Q5/11   2006-10-03
[ 17 ]  
 
Q.rcp1 - Service-Class, Reservation-Class and Transport-Class AVPs     Reliance Communications, India   Q5/11   2006-10-03
[ 16 ]  
 
Section 6.3 for Y.flowreq     Anagran Inc.   Q4/13   2006-10-02
[ 15 ]  
 
Proposals for Draft Recommendation Y.rtconv     United Kingdom of Great Britain and Northern Ireland   Q2/13   2006-10-02
[ 14 ]  
 
Q.rcp1 - Media-Component-Description Modification for QoS-Downgradeable and Qos-Requested-Type     Reliance Communications, India   Q5/11   2006-10-02
[ 13 ]  
 
Q.rcp1 - Miscellaneous Editing     Reliance Communications, India   Q5/11   2006-10-02
[ 12 ]  
 
Q.rcp1 - Inclusion of Media-Component-Description AVP in AAA     Reliance Communications, India   Q5/11   2006-10-02
[ 11 ]  
 
Q.rcp1 - Deletion of Max-Delay, Max-Jitter, Max-Packet-Loss-Rate, Max-Packet-Size AVPs     Reliance Communications, India   Q5/11   2006-10-02
[ 10 ]  
 
Q.rcp1 - Flow-Status AVP     Reliance Communications, India   Q5/11   2006-10-02
[ 9 ]  
 
Q.rcp1 - Flow-Description AVP     Reliance Communications, India   Q5/11   2006-10-02
[ 8 ]  
 
Q.rcp1 - Addition of New AVP - "Dynamic-Firewall-Working-Mode"     Reliance Communications, India   Q5/11   2006-10-02
[ 7 ]  
 
Q.rcp1 - Class AVP     Reliance Communications, India   Q5/11   2006-10-02
[ 6 ]  
 
Q.rcp1 - Max-Requested-Bandwidth-DL, Max-Requested-Bandwidth-UL, RR-Bandwidth and RS-Bandwidth AVPs     Reliance Communications, India   Q5/11   2006-10-02
[ 5 ]  
 
Q.rcp1 - AAR Modification for User-Name and Subscription-Identifier     Reliance Communications, India   Q5/11   2006-10-02
[ 4 ]  
 
Q.rcp1 - Use of Authorization-Token in AAA For Pull Mode CPE and Stateful PD-PE Case     Reliance Communications, India   Q5/11   2006-10-02
Results:1303 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2008-08-28