Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 85 ]
+Ch.1-10 |
Report of the 11th Meeting of Working Party 8F (Edinburgh, 8-16 October 2003)
|
Chairman, WP 8F
|
|
2003-10-22 |
|
[ 84 ]
|
Final list of participants (11th meeting of Working Party 8F, Edinburgh 8-16 October 2003)
|
WP 8F
|
|
2003-10-22 |
|
[ 83 ]
(Rev.1) |
Activities related to IMT-2000 and systems beyond IMT-2000 in Region 3
|
Region 3 Rapporteur
|
|
2003-10-16 |
|
[ 82 ]
|
New/revised Recommendations brought to the attention of Working Party 8F
|
Director, BR
|
|
2003-10-16 |
|
[ 81 ]
|
Next generation network studies
|
Chairman, ITU-T SG 13
|
|
2003-10-14 |
|
[ 80 ]
|
Update of Recommendation ITU-R M.1457 to revision 4
|
Director, Radiocommunication Bureau
|
|
2003-10-09 |
|
[ 79 ]
|
Update on IMT-2000 activities in Region 2
|
Region 2 Special Rapporteur
|
|
2003-10-09 |
|
[ 78 ]
|
Report on activities in Europe on market and services
|
Regional Coordinator
|
|
2003-10-09 |
|
[ 77 ]
|
Request for comments on a new draft Recommendation X.MSEC
|
ITU-T SG 17
|
|
2003-10-09 |
|
[ 76 ]
|
Update on CITEL activities and news from the Americas
|
CITEL Rapporteur
|
229/8
|
2003-10-03 |
|
[ 75 ]
|
Reply to Liaison statements from ITU-R WP8A, 8F and ITU-T SSG - Liaison statement on the guidelines on the smooth transition of existing mobile networks to IMT-2000 developing countries
|
Question 18/2 of ITU-D Study Group 2
|
|
2003-10-03 |
|
[ 74 ]
|
Liaison statement to Working Parties 4B, 6E, 8A, 8D, 8F, 9B and 9D - User and spectrum requirements for electronic news gathering
|
WP 6P
|
93/6, 89/6
|
2003-10-02 |
|
[ 73 ]
|
Bell mobility & Telus mobility experiences with Spectrum / re-use for terrestrial mobile wireless systems
|
Bell Canada
|
229/8
|
2003-10-01 |
|
[ 72 ]
|
The update of Section 5.2.2 of Recommendation ITU-R M.1457 (TTC)
|
Director, BR
|
229/8
|
2003-10-01 |
|
[ 71 ]
|
The update of Section 5.2.2 of Recommendation ITU-R M.1457 (ARIB)
|
Director, BR
|
229/8
|
2003-10-01 |
|
[ 70 ]
|
Liaison statement to Working Parties 4B, 6E, 8A, 8D, 8F, 9B and 9D - Spectrum usage and operational characteristics of electronic news gathering systems - Proposed text for draft CPM06 Report Chapter 3 Section 3.2
|
WP 6P
|
|
2003-09-30 |
|
[ 69 ]
|
Updated material on IMT-2000 CDMA DS and IMT-2000 CDMA TDD for revision 4 of ITU-R M.1457
|
L M Ericsson
,
MOTOROLA, Inc.
,
Nokia Corporation
,
Siemens A.G.
,
TELECOM ITALIA S.p.A.
|
|
2003-09-30 |
|
[ 68 ]
|
Examples of wireless data services
|
Korea (Republic of)
|
229/8
|
2003-09-30 |
|
[ 67 ]
|
Consideration of a naming issue for the future development of IMT-2000 and systems beyond IMT-2000
|
Korea (Republic of)
|
|
2003-09-30 |
|
[ 66 ]
|
Revision of Recommendation ITU-R M.1641
|
Korea (Republic of)
|
|
2003-09-30 |
|
[ 65 ]
|
An application of Chasm Theory for expansion of mobile internet market
|
Korea (Republic of)
|
|
2003-09-30 |
|
[ 64 ]
|
An example of a methodology to adjust for non-simultaneous busy hour traffic requirements
|
Korea (Republic of)
|
|
2003-09-30 |
|
[ 63 ]
|
Establishment of JTG 6-8-9 to study sharing among space and terrestrial services in the band 2 500-2 690 MHz
|
Chairman, JTG 6-8-9
|
|
2003-09-29 |
|
[ 62 ]
|
Liaison statement to WPs 6E, 8A and 8F and ISO TC204 and its WP 10 - A preliminary draft new Report on broadcasting of multimedia and data applications for mobile reception
|
WP 6M
|
45/6
|
2003-09-29 |
|
[ 61 ]
|
Liaison statement to WPs 8F, 9D, 4B, 6E, 8A, 8D, 9B - User and spectrum requirements for electronic news gathering
|
WP 6P
|
93/6, 89/6
|
2003-09-29 |
|
[ 60 ]
|
Draft Report on sharing and adjacent band compatibility in the band 2 500-2 690 MHz between terrestrial IMT-2000 and MSS component
|
Rapporteur, Joint Correspondence Group 8F-8D
|
|
2003-09-26 |
|
[ 59 ]
|
Update of Section 5.4 of Recommendation ITU-R M.1457 to Revision 4 (T1)
|
Director, BR
|
229/8
|
2003-09-26 |
|
[ 58 ]
|
Update of Section 5.4.2 of Recommendation ITU-R M.1457 to Revision 4 (TIA TR-45.3)
|
Director, BR
|
229/8
|
2003-09-26 |
|
[ 57 ]
|
Suggested edits to Annex B of the Mid-Term Guidelines
|
GSM Association
|
|
2003-09-26 |
|
[ 56 ]
(Rev.1) |
Regional activities for future services and market
|
Region 3 Coordinator for WG Services
|
|
2003-09-26 |
|
[ 55 ]
|
Suggested edits to paragraph 6 of the Mid-Term Guidelines
|
GSM Association
|
|
2003-09-26 |
|
[ 54 ]
|
Naming issue of "IMT-2000, future development of IMT-200 and systems beyond IMT-2000"
|
Germany (Federal Republic of)
|
|
2003-09-26 |
|
[ 53 ]
|
Future activities within ITU on evolution and migration issues
|
Germany (Federal Republic of)
|
|
2003-09-26 |
|
[ 52 ]
|
Proposed modifications to the MTG-document version 0.3.3
|
Germany (Federal Republic of)
|
|
2003-09-26 |
|
[ 51 ]
|
Comments on ITU-R draft new Report on mitigating techniques to address coexistence between IMT-2000 TDD and FDD radio interface technologies within the frequency range 2 500-2 690 MHz operating in adjacent bands and in the same geographical area
|
L M Ericsson
,
MOTOROLA, Inc.
,
Nokia Corporation
,
Siemens A.G.
,
TELECOM ITALIA S.p.A.
|
|
2003-09-26 |
|
[ 50 ]
|
Updated information on the Roadmap
|
L M Ericsson
,
MOTOROLA, Inc.
,
Nokia Corporation
,
Siemens A.G.
,
TELECOM ITALIA S.p.A.
|
|
2003-09-26 |
|
[ 49 ]
|
Editing work in preparation of the 11th WP 8F meeting on 8F/914 Attachment 5.4 - Working document towards a summary of studies on the interference assessment from UWB devices to terrestrial IMT-2000 systems operating in the same geographical area
|
France
|
|
2003-09-26 |
|
[ 48 ]
|
On viable deployment of UTRA in additional and diverse spectrum arrangements
|
L M Ericsson
,
MOTOROLA, Inc.
,
Nokia Corporation
,
Siemens A.G.
,
TELECOM ITALIA S.p.A.
|
|
2003-09-26 |
|
[ 47 ]
|
Comparison of alternative calculation methodologies for the estimation of spectrum requirements for the future development of IMT-2000 and systems beyond IMT-2000
|
United Kingdom of Great Britain and Northern Ireland
|
|
2003-09-26 |
|
[ 46 ]
|
Spectrum estimation methodology based on an evolution of Recommendation ITU-R M.1390
|
United Kingdom of Great Britain and Northern Ireland
|
|
2003-09-26 |
|
[ 45 ]
|
Declaration of transfering CWTS to CCSA as the SDO of China
|
China (People's Republic of)
|
|
2003-09-26 |
|
[ 44 ]
|
Canadian experiences with spectrum use for terrestrial mobile wireless systems
|
Canada
|
229/8
|
2003-09-25 |
|
[ 43 ]
|
WG SAT COORD history and future
|
France
|
|
2003-09-25 |
|
[ 42 ]
|
Proposals for textual changes to "ITU-R draft new Report on mitigating techniques to address coexistence between IMT-2000 TDD and FDD radio interface technologies within the frequency range 2 500-2 690 MHz operating in adjacent bands and in the same geographical area" in support of LS from 3GPP-RAN
|
L M Ericsson
,
Nokia Corporation
|
|
2003-09-25 |
|
[ 41 ]
|
Suggested edits to the mid-term guidelines
|
GSM Association
|
|
2003-09-25 |
|
[ 40 ]
|
Consideration of further steps for development of "Methodology of spectrum estimation"
|
Germany (Federal Republic of)
|
|
2003-09-25 |
|
[ 39 ]
|
Text proposals for Section 7, conclusions for "Working document towards a preliminary draft new Report on mitigating techniques to address coexistence between IMT-2000 TDD and FDD radio interface technologies within the frequency range 2 500-2 690 MHz operating in adjacent bands and in the same geographical area"
|
Nokia Corporation
|
|
2003-09-25 |
|
[ 38 ]
|
Structure and workplan for Spectrum Working Group
|
Chairman, WG Spec
|
|
2003-09-25 |
|
[ 37 ]
|
Report
|
Region 1 Rapporteur
|
|
2003-09-25 |
|
[ 36 ]
|
Joint WP 8F and WP 8A work on Question ITU-R 230-1/8 (Software defined radio)
|
Cingular Wireless and Intel
|
|
2003-09-25 |
Results:1385 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):