Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 198 ]
|
On the contribution of DIRECTV/Hughes Electronics regarding further work towards a PDNR on availability performance objectives for Digital Multiprogramme BSS Systems - Questions ITU-R 6S/217/11 and 101/11
|
NABA
|
|
2001-09-19 |
|
[ 197 ]
|
Working document toward PDNR on BSS system using frequency bands above 17 GHz
|
Japan
|
|
2001-09-19 |
|
[ 196 ]
|
Impact on non-GSO BSS (sound) systems of various pfd coordination thresholds in the band 2 630-2 655 MHz
|
Japan
|
|
2001-09-19 |
|
[ 195 ]
|
Proposal of the antenna radiation mask for the base stations of IMT-2000 systems in the band 2 630-2 655 MHz including the effect of electrical tilt mechanism and multiband usage
|
Japan
|
|
2001-09-19 |
|
[ 194 ]
|
Coordination thresholds for non-geostationary space stations using highly elliptical orbits in the broadcasting-satellite service (sound) operating in the 2 630-2 655 MHz frequency band sharing with IMT-2000 systems
|
Japan
|
|
2001-09-19 |
|
[ 193 ]
|
Draft reply to liaison statements from WP 4A and draft liaison statement to WP 4-9S - Consideration on the allocation to the HD-FSS in the space-to-Earth direction in the frequency band 17.3-18.4 GHz
|
Japan
|
|
2001-09-19 |
|
[ 192 ]
|
Comment on Annex 13 of Document 6S/139
|
Japan
|
|
2001-09-19 |
|
[ 191 ]
|
Consideration on availability performance objectives for digital multiprogramme systems
|
Japan
|
|
2001-09-19 |
|
[ 190 ]
|
This document has been withdrawn
|
Japan
|
|
2001-09-19 |
|
[ 189 ]
|
Consideration of the number of BSS (sound) systems which may operate at the same frequency
|
Japan
|
|
2001-09-19 |
|
[ 188 ]
|
Draft elements for CPM text in Chapter 3 relating to WRC-03 Agenda item 1.34
|
Japan
|
|
2001-09-19 |
|
[ 187 ]
|
CPM text in Chapter 3 relating to WRC-03 Agenda item 1.34
|
France
|
|
2001-09-19 |
|
[ 186 ]
(Rev.1) |
Review and organization of work - Meeting 13-22 March 2002
|
Chairman, WP 6S
|
|
2001-09-19 |
|
[ 185 ]
+Add.1 |
Coordination of transmitting terrestrial stations or transmitting FSS earth stations with BSS earth stations: comparison of Annex 3 to Appendix S30 and Appendix S7 methodologies
|
France
|
|
2001-09-19 |
|
[ 184 ]
+Add.1 |
Further considerations on the pfd masks for inter-regional BSS-FSS sharing in view of SRG-6S/8 measurements results
|
France
|
|
2001-09-19 |
|
[ 183 ]
|
Review of the criteria for intra-regional BSS-BSS sharing
|
France
|
|
2001-09-19 |
|
[ 182 ]
|
Measurements on transmit/receive VSAT antennas at 12 GHz
|
France
|
|
2001-09-19 |
|
[ 181 ]
|
Review of the antenna measurements provided to SRG 6S/8
|
France
|
|
2001-09-19 |
|
[ 180 ]
|
Review of the adequacy of Annex 4 PFD mask for the protection of BSS at 12 GHz from FSS/BSS in another Region
|
France
|
|
2001-09-19 |
|
[ 179 ]
|
Minimum size of earth station to be taken into account in the pfd masks for inter and intra-regional FSS/BSS sharing at 12 GHz
|
France
|
|
2001-09-19 |
|
[ 178 ]
|
Statistical evaluation of the interference from the Region 1 and 3 BSS plan to the Region 2 & 3 FSS based on several sharing criteria
|
France
|
|
2001-09-19 |
|
[ 177 ]
|
Liaison statement to Working Parties 6S, 4A, 8D and Task Group 1/7
|
WP 7D
|
|
2001-09-19 |
|
[ 176 ]
|
Liaison statement to TG 1/7 and WPs 4A, 6S and 8D - Comments on the preliminary annexes on band-by-band studies to the TG 1/7 Chairman's Report dealing with radio astronomy frequency bands
|
WP 7D
|
|
2001-09-19 |
|
[ 175 ]
|
Liaison statement to TG 1-7 and WPs 4A and 6S - Measurements of unwanted emission levels from geostationary systems of the fixed-satellite service in the radio astronomy frequency band 4 990-5 000 GHz
|
WP 7D
|
|
2001-11-05 |
|
[ 174 ]
|
Consideration of duplex feed and dual feed antennas - Inter-Regional BSS/FSS sharing in the 12 GHz band
|
Canada
|
|
2001-09-19 |
|
[ 173 ]
|
Liaison statement to Task Group 1/7 and Working Parties 4A, 6S and 8D - Comments on the preliminary draft CPM text developed by Task Group 1/7
|
WP 7D
|
|
2001-09-19 |
|
[ 172 ]
|
Proposed regulatory solution to Agenda item 1.34
|
France
|
|
2001-09-19 |
|
[ 171 ]
|
Liaison statement to WP 6S - WRC-03 Agenda item 1.12, Resolution 723, resolves 1
|
WP 7B
|
|
2001-09-19 |
|
[ 170 ]
|
Liaison statement to Working Parties 6S, 9D and 7E - WRC-03 Agenda item 1.12, resolves 4, Resolution 723 (WRC-2000)
|
WP 7B
|
|
2001-09-19 |
|
[ 169 ]
|
Liaison statement on official contact between ITU-R and ETSI
|
ITU-T SG 13
|
|
2001-09-19 |
|
[ 168 ]
|
Use of the 17.3-18.1 GHz band to transmit fixed satellite service signals
|
Russian Federation
|
|
2001-09-19 |
|
[ 167 ]
|
Liaison statement from Chairman, TG 6/9 - Request for appointment of Rapporteurs
|
Chairman, TG 6/9
|
|
2001-09-19 |
|
[ 166 ]
|
Proposed repy from WP 6S to liaison statement from WP 4A regarding CPM text for WRC-03 Agenda item 1.37
|
United States of America
|
|
2001-09-19 |
|
[ 165 ]
|
Proposed corrections to the PDNR on Methodology for the calculation of the worst-case interference levels between non-geostationary BSS (sound) systems using highly-elliptical orbits and geostationary orbit satellite networks operating in the bande 2 630-2 655 MHz
|
Iran (Islamic Republic of)
|
|
2001-09-19 |
|
[ 164 ]
|
Chairmen's Report of the first meeting of JRG 6S-9D
|
Chairmen JRG 6S-9D
|
|
2001-09-19 |
|
[ 163 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 6S, 7E, 7B, 8D, 9A, 9B and 9D - A draft new Recommendation and a draft new revision of Recommendations dealing with sharing bewtween the FS and FSS operating in the band 37.5 to 42.5 GHz
|
WP 4-9S
|
|
2001-09-19 |
|
[ 162 ]
|
Draft liaison statement to ITU-D Study Group 1 and ITU-R Working Parties 4A, 6S and 9D
|
WP 4-9S
|
|
2001-09-19 |
|
[ 161 ]
|
Liaison statement to WP 6S, WP 9B and WP 9D on the preliminary draft CPM text for Chapter 4.2 of the CPM-02 Report on WRC-03 Agenda item 1.18
|
WP 4-9S
|
|
2001-09-19 |
|
[ 160 ]
|
Liaison to WPs 1C, 4A, 6S, 7B, 7C, 7D, 8B, 8D, 9B, 9C and 9D
|
TG 1/7
|
|
2001-09-19 |
|
[ 159 ]
|
Liaison statement to WP 4A, WP 6S, WP 8A, WP 8F, WP 9D and the Special Committee on The current regulatory situation of typical FSS and BSS earth stations
|
WP 4-9S
|
|
2001-09-19 |
|
[ 158 ]
|
Liaison statement to Working Parties 4A, 6E, 6S, 7A, 7B, 7C, 8A, 8B, 8D, 8F and 9B - Definitions of the spectral properties of transmitter emissions
|
WP 1A
|
|
2001-09-19 |
|
[ 157 ]
|
Liaison statement to WPs 3J, 4A, 4B, 6E, 6S, 7B, 7D, 8A, 8B and 9D - Compatibility between Ultra Wideband (UWB) emissions and Radiocommunication Services
|
WPs 1A and 1B
|
|
2001-09-19 |
|
[ 156 ]
|
Liaison statement to WP 6S on proposed outline for Section 3.2 of the CPM Report - Sharing criteria and associated regulatory procedures in Appendices S30 and S30A (Agenda item 1.27)
|
WP 1A
|
|
2001-09-19 |
|
[ 155 ]
|
Liaison statement to WP 6S - Out-of-band emissions for broadcast ssatellite system
|
WP 6S
|
|
2001-09-19 |
|
[ 154 ]
|
Liaison statement Working Parties 4A, 6S, 7C, 7D, 8D, 9B, 9D and the Chairmen of Study Groups 4, 6, 7, 8 and 9
|
Chairman, GT 1/7
|
|
2001-09-19 |
|
[ 153 ]
|
Report of the fourth meeting of Study Group 6
|
Chairman, SG 6
|
|
2001-09-19 |
|
[ 152 ]
|
Liaison statement from WP 9D - Preliminary draft elements for CPM text in Chapter 3 relating to WRC-03 Agenda item 1.34
|
WP 9D
|
|
2001-09-19 |
|
[ 151 ]
|
Liaison statement to WP 6S and JRG 6S-9D - Some information which may assist the further study on sharing between BSS (sound)
|
WP 9D
|
|
2001-09-19 |
|
[ 150 ]
|
Reply Liaison statement to WP 6S - possible sharing between airborne BSS (TV) and certain applications of the fixed service at 2 500 MHz
|
WP 9D
|
|
2001-09-19 |
|
[ 149 ]
|
Reply to Liaison statement from WP 6S - Computing average antenna gain of sectorial antenna at a fixed elevation angle
|
WP 9D
|
|
2001-09-19 |
Results:348 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):