International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP-6A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP-6A  C 

ITU-R WP-6A

Terrestrial Broadcasting Delivery

Results:485 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 335 ]  
 
Report of activities of Correspondence Group on guidance for the introduction of new DTTB systems, technologies and applications in the broadcasting service     CG.IntroNewtech     2022-09-07
[ 334 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R BT.2036-4 - Characteristics of a reference receiving system for frequency planning of digital terrestrial television systems     China (People's Republic of)     2022-09-07
[ 333 ]  
 
Working document towards a draft new Report ITU-R BT.[TRIALS-NEW-TMMB] - Introduction of 5G NR MBS in ITU-R Study Group 6 documents     China (People's Republic of)     2022-09-07
[ 332 ]  
 
Proposal for modification of the [preliminary] draft revision to Report ITU-R BT.2049-7 - Broadcasting of multimedia and data applications for mobile reception     China (People's Republic of)     2022-09-07
[ 331 ]  
 
Proposal for modification of the [preliminary] draft revision to Recommendation ITU-R BT.2016-2 - Error-correction, data framing, modulation and emission methods for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands     China (People's Republic of)     2022-09-07
[ 330 ]  
 
Proposal for modification of the [preliminary] draft revision of Report ITU-R BT.2295-3 - Digital terrestrial broadcasting systems     China (People's Republic of)     2022-09-07
[ 329 ]  
 
Document withdrawn and incorporated into Doc. 6A/326     N/A     2022-09-07
[ 328 ]  
 
Document withdrawn and incorporated into Doc. 6A/326     N/A     2022-09-07
[ 327 ]  
 
Document withdrawn and incorporated into Doc. 6A/326     N/A     2022-09-07
[ 326 ]  
 
Preliminary draft revision to Report ITU-R BT.2343-8 - Collection of field trials of UHDTV over DTT networks     Korea (Republic of) , United States of America   Q133/6   2022-09-07
[ 325 ]  
 
Report of the Correspondence Group on the CISPR radio services database     Chairman, CG on CISPR on radio services database     2022-09-05
[ 324 ]  
 
Update to Working Party 6A (September 2022)     Chairman, RG on RF Hazard     2022-08-30
[ 323 ]  
 
[Working document towards a] [preliminary] draft revision of Recommendation ITU-R BS.1698-0 - Evaluating fields from terrestrial broadcasting transmitting systems operating in any frequency band for assessing exposure to non-ionizing radiation     RG on RF Hazard     2022-08-31
[ 322 ]  
 
Continuation of Rapporteur Group to undertake WRC-23 related studies called for by CPM23-1     RG for WRC-23 related AIs     2022-08-24
[ 321 ]  
 
Proposed draft reply liaison statement to Working Party 5D (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - WRC-23 agenda item 1.4     RG for WRC-23 related AIs   AI1.4   2022-08-24
[ 320 ]  
 
Progress Report - WRC-23 agenda items 1.4, 1.9, 1.12, and 9.1, topics a) and c)     RG for WRC-23 related AIs   AI9.1C), AI9.1A), AI1.9, AI1.4, AI1.12   2022-08-24
[ 319 ]  
 
Report of activities in the Rapporteur Group     RG on WRC-23 AI 1.5   AI 1.5   2022-08-22
[ 318 ]  
 
Preliminary draft revision of Recommendation ITU-R BS.2107-0 - Use of International Radio for Disaster Relief (IRDR) frequencies for emergency broadcasts in the high frequency (HF) bands     HFCC     2022-08-18
[ 317 ]  
 
Proposal for modifications of Report ITU-R BT.2140     Brazil (Federative Republic of)     2022-08-05
[ 316 ]  
 
Brazilian next-generation digital terrestrial television (Information Document)     Brazil (Federative Republic of)     2022-08-05
[ 315 ]  
 
Liaison statement on ITU testing laboratories recognition procedure     ITU-T SG11     2022-07-19
[ 314 ]  
 
Liaison statement to ITU-T Study Group 5 Question 3/5, ITU-D Study Group 2 Question 7/2 and ITU-R Working Party 6A - Electromagnetic field measurements to assess human exposure     WP 1C     2022-07-18
[ 313 ]  
 
Liaison statement to Working Parties 5A, 5B, 5C and 7A (copy to Working Party 6A for information) - Preliminary draft revision of Report ITU-R SM.2449-0     WP 1A     2022-07-11
[ 312 ]  
 
Liaison statement on collaboration matters related to EMF for ITU-D Q7/2 and to ITU-R Working Parties     ITU-T SG5     2022-07-08
[ 311 ]  
 
Reply liaison statement on draft revision of Report ITU-R BT.2385     ITU-T SG5     2022-07-08
[ 310 ]  
 
Reply liaison statement on the revision Recommendation ITU-R BS.1698-0     ITU-T SG5     2022-07-08
[ 309 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4     WP 5D   AI1.4   2022-07-01
[ 308 ]  
 
Reply liaison statement to ITU-R Study Group 6 - Information on the progress of ITU-R Study Group 6 Rapporteur Group on a Vision for the Future of Broadcasting (RG-FOB)     WP 5D     2022-06-30
[ 307 ]  
 
Liaison statement to ITU-R Study Groups - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations     CCT     2022-06-30
[ 306 ]  
 
Liaison statement on call for use cases on testbeds federation     ITU-T (FG-TBFxG)     2022-06-24
[ 305 ]  
 
Vocabulary activities of interest to ITU-R Study Group 6     Rapporteur to CCV     2022-06-21
[ 304 ]  
 
Reply liaison statement on the activities of Rapporteur Group on a vision for the future of broadcasting     ITU-T SG12     2022-06-20
[ 303 ]  
 
Liaison statement to Working Parties 5A, 5B, 5C and 6A - Software integral to Recommendation ITU-R P.368-9     WP 3L     2022-06-14
[ 302 ]  
 
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future development of P-series recommendations to address frequencies above 100 GHz     WP 3M     2022-06-14
[ 301 ]  
 
Liaison statement to Working Party 6A - Building entry loss in Band I (47-68 MHz)     WPs 3J, 3K & 3M     2022-06-13
[ 300 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 5A, 5B, 6A, 7B for information) - WRC-23 agenda item 1.12 activities     WP 5C   AI1.12   2022-06-13
[ 299 ]  
 
Reply liaison statement to Working Party 5C (copy to Working Parties 5D and 6A) - Resolution ITU-R 59-2     WP 5A     2022-06-10
[ 298 ]  
 
Liaison statement to Working Parties 7C, 5B, 5C, 6A and 7B (copy to Working Parties 3K, 3L and 3M for information) - Comments on Working Party 7C activities relating to WRC-23 agenda item 1.12     WP 5A   AI1.12   2022-06-06
[ 297 ]  
(Rev.1) 
Liaison statement to Working Parties 5A, 5B, 5C, 6A and 7B (copy to Working Parties 3K, 3L and 3M for information) - Progress report on the activities relating to WRC-23 agenda item 1.12     WP 7C   AI1.12   2022-05-06
[ 296 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 6A, and 7D - Preliminary draft CPM text on WRC-23 agenda item 9.1, topic a)     WP 7C   AI9.1A)   2022-05-06
[ 295 ]  
 
Liaison statement on the outcomes of the first meeting of the ITU-T Focus Group on Testbed Federations for IMT-2020 and beyond (FG-TBFXG)     ITU-T (FG-TBFxG)     2022-04-14
[ 294 ]  
+Ch.2-5 
Report of the meeting of Working Party 6A (E-meeting, 7-16 March 2022)     Chairman, WP 6A     2022-03-16
[ 293 ]  
 
Final List of Participants - Working Party 6A (E-meeting, 7-16 March 2022)     Director, BR     2022-03-16
[ 292 ]  
 
Liaison statement to Working Party 6B (copy to Working Party 6A) - Proposed communications to other organizations on the work of RG-FOB     WP 6C (RG-FOB)     2022-03-11
[ 291 ]  
 
Liaison statement to Working Parties 6A and 6B drawing attention to the revision of audio related ITU-R Texts     WP 6C     2022-03-11
[ 290 ]  
 
Liaison statement to inform Working Parties 6A and 6B about a webinar on energy aware broadcasting     WP 6C     2022-03-09
[ 289 ]  
 
Reply liaison statement to Working Party 5C (copy to Working Parties 5A and 6A) - Resolution ITU-R 59-2     WP 5D     2022-03-07
[ 288 ]  
 
List of documents issued (Documents 6A/239; 6A/241 - 6A/288)     BR, Study Groups Department     2022-03-04
[ 287 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4     WP 5D   AI1.4   2022-03-04
[ 286 ]  
 
Preliminary draft revision of Report ITU-R BT.2344-2 - Information on technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting     RG on SAB/SAP Issues     2022-03-01
Results:485 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-03-13