Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2240 ]
|
Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2239 ]
|
Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2238 ]
|
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2237 ]
|
Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2236 ]
|
G.fast: Performance of channel estimation methods
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-28 |
|
[ 2235 ]
|
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix
|
Q13/15
|
2012-08-28 |
|
[ 2234 ]
|
Clarification on Ethernet transport network architecture in G.8010
|
Hitachi, Ltd.
|
Q12/15
|
2012-08-28 |
|
[ 2233 ]
|
Comments on the latest draft G.8011.4
|
Hitachi, Ltd.
|
Q10/15
|
2012-08-28 |
|
[ 2232 ]
|
Consideration of G.mecp protection architecture
|
Hitachi, Ltd.
|
Q9/15
|
2012-08-28 |
|
[ 2231 ]
|
Proposal on the structure of G.8060 (G.ptneq)
|
Hitachi, Ltd.
|
Q9/15
|
2012-08-28 |
|
[ 2230 ]
|
Proposal for equipment type definition in G.8060 (G.ptneq)
|
Hitachi, Ltd.
|
Q9/15
|
2012-08-28 |
|
[ 2229 ]
|
Proposal for update of G.8101
|
Hitachi, Ltd.
|
Q3/15
|
2012-08-28 |
|
[ 2228 ]
|
Comment on the structure of G.8101
|
Hitachi, Ltd.
|
Q3/15
|
2012-08-28 |
|
[ 2227 ]
|
General discussion on wavelength tuning for G.multi
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2226 ]
|
General discussion on registration for G.multi
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2225 ]
|
Proposed text for ODU SMP Protocol
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2224 ]
|
Proposed text of Commands for G.odusmp
|
China Unicom
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2223 ]
|
Proposal for NG-PON2 TC layer standardization
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2222 ]
|
Editorial proposal for G.smp
|
China Unicom
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2221 ]
|
TC layer framing in TWDM PON
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2220 ]
|
Example scenarios for protection interworking
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2219 ]
|
Proposal of bi-directional failure in G.873.1
|
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2218 ]
|
Unified Power Management for PON systems
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2217 ]
|
Proposal for FEC overhead of OTU5
|
ZTE Corporation; China
|
Q6/15, Q11/15
|
2012-08-28 |
|
[ 2216 ]
|
Proposal to add OTU0 frame in G.709/Y.1331
|
Altera Corporation
,
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
|
Q11/15
|
2012-08-28 |
|
[ 2215 ]
|
OTN Architecture Extensions
|
Infinera Corporation
|
Q6/15, Q12/15, Q11/15
|
2012-08-28 |
|
[ 2214 ]
|
Comparison of ODU SMP Activation protocols
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2213 ]
|
G.ODUSMP Protocol Proposal
|
Infinera Corporation
|
Q9/15
|
2012-08-28 |
|
[ 2212 ]
|
Transparent Clocks and Issues Around Perceived Layer Violations [G.8275.1]
|
Aviat Networks
,
Calnex Solutions Limited
,
Juniper Networks
,
Sprint
,
Vitesse Semiconductor Corporation
|
Q13/15
|
2012-08-28 |
|
[ 2211 ]
|
G.fast: On the channel estimation method
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-28 |
|
[ 2210 ]
|
The effect of noise on channel estimation accuracy for multiple simultaneous estimations
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-27 |
|
[ 2209 ]
|
Fast channel estimation scheme - overview
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-27 |
|
[ 2208 ]
|
FEC blocks mapping to TDD-Frames
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-27 |
|
[ 2207 ]
|
The need for additional pilots for the first symbol in a TDD-Frame
|
Sckipio Technologies S.I. Ltd.
|
Q4A/15
|
2012-08-27 |
|
[ 2206 ]
|
Proposal for determined Amendment 1 of G.9955 Annex A : LFSR usage for pilot tones
|
Yitran Communications Ltd.
|
Q4C/15
|
2012-08-27 |
|
[ 2205 ]
|
G.fast: Proposal to define pilot tones in G.fast
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-27 |
|
[ 2204 ]
|
G.fast: On the number of latency paths in G.fast
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-27 |
|
[ 2203 ]
|
G.vector: Comments on 2012-06-4A-048 and upstream FDPS definition
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-27 |
|
[ 2202 ]
|
G.vector: Proposal on FDPS format
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-27 |
|
[ 2201 ]
|
G.vector: Proposal to allow pilot sequence length modification
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-27 |
|
[ 2200 ]
|
G.vector: Proposed FDPS-related text corrections for G.993.5
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-27 |
|
[ 2199 ]
|
G.ploam: Proposal for a corrigendum to G.997.1 Recommendation
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-27 |
|
[ 2198 ]
|
G.vector: Proposed text change for G.993.5 Recommendation
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-27 |
|
[ 2197 ]
|
G.fast: Power Optimized G.fast Transmission
|
ADTRAN
|
Q4A/15
|
2012-08-27 |
|
[ 2196 ]
|
Proposal for adaptive bandwidth in Ethernet ring
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-27 |
|
[ 2195 ]
|
Variable temperature test regime
|
Rakon Limited
|
Q13/15
|
2012-08-27 |
|
[ 2194 ]
|
G.8263 Clarification
|
Rakon Limited
|
Q13/15
|
2012-08-27 |
|
[ 2193 ]
|
Clarification on adaptive bandwidth for G.808.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-27 |
|
[ 2192 ]
|
Proposal on protection switching interworking architecture for ring-to-ring and linear-to-ring schemes
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-27 |
|
[ 2191 ]
|
Proposal for new Appendix II to G.798.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2012-08-27 |
Results:452 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):