International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2012-09-10 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG15  TD-WP1 (2012-09-10) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : [ 2012-09-10 ]  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:165 total items.
Result page:  Previous -  1 - 2 - 3 - 4
Temporary Documents  (WP1)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 686-WP1 ]  
 
iLSL: Architecture aspects of G.fast     Broadband Forum   Q4A/15   2012-03-23
[ 685-WP1 ]  
 
oLS: Update on Smart Grid Activities in ITU, including power line communications     Rapporteur Q4c/15   Q4C/15   2012-03-20
[ 684-WP1 ]  
 
iLS: Smart Grid related issues (representative and deliverables)     JCA-SG&HN   Q4C/15, Q4B/15, Q4A/15, Q2/15, Q1/15   2012-03-19
[ 683-WP1 ]  
 
iLS: IEEE 1901.2, ITU G.9955 March 12th update     IEEE 1901.2   Q4C/15   2012-03-16
[ 682-WP1 ]  
 
oLS: Study status of G.epon after Huntsville meeting     Rapporteur Q2/15   Q2/15   2012-03-15
[ 681-WP1 ]  
 
oLS: Liaison response to TTC on G.hnem     Rapporteur Q4c/15   Q4C/15   2012-03-15
[ 680-WP1 ]  
 
oLS: Update on ITU-T activities in the area of NB-PLC and Smart Grid     Rapporteur Q4c/15   Q4C/15   2012-03-15
[ 679-WP1 ]  
 
iLS: Access Network Transport     ITU-T SG17   Q1/15   2012-03-07
[ 678-WP1 ]  
 
iLS: Response to ITU-T liaison letter dated 16 December 2011     IEEE 1904.1   Q2/15   2012-03-07
[ 677-WP1 ]  
 
iLS: Liaison to ITU-T on Reverse Powering     ATTM/TM6   Q4A/15   2012-03-06
[ 676-WP1 ]  
 
iLS: Liaison to ITU-T on Support of SRA and Retransmission     ATTM/TM6   Q4A/15   2012-03-06
[ 675-WP1 ]  
 
oLS: Study status of G.epon after Huntsville meeting (9 February 2012)     Rapporteur Q2/15   Q2/15   2012-03-02
[ 674-WP1 ]  
 
iLS: Initiation of ONU Deployment Requirements for NG-PON Working Text (WT-288)     BBF   Q2/15   2012-02-06
[ 673-WP1 ]  
 
oLS: Consideration of Recommendation ITU-T G.9955 by IEEE P1901.2     Rapporteur Q4c/15   Q4C/15   2012-02-01
[ 672-WP1 ]  
 
iLS: Establishment of Liaison relationship for the purpose of draft exchange     TTC   Q4C/15   2012-01-25
Results:165 total items.
Result page:  Previous -  1 - 2 - 3 - 4  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-17