International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2015-12-02 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  TD-GEN (2015-12-02) 

ITU-T SG 11

Protocols and test specifications

Study Period 2013

Meeting  from 2015-12-02 to 2015-12-11

held in Switzerland [Geneva]

Other Meetings : 2016-06-27  2016-04-29  2016-03-24  [ 2015-12-02 ]  2015-04-22  2014-11-21  2014-07-09  2014-02-21  2013-11-14  2013-11-07  2013-06-21  2013-02-25 

Results:249 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
Temporary Documents  (GEN)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 910-GEN ]  
 
A.5 justification information for draft new Q.4001.2 v.1 (ex Q.39_SI_BC_Net_TS_Part2 V.1)     Editors   Q11/11   2015-11-26
[ 909-GEN ]  
 
A.5 justification information for draft new Q.4001.1 v.1 (ex Q.39_SI_BC_Net_TS_Part1 V.1)     Editor   Q11/11   2015-11-26
[ 908-GEN ]  
 
A.5 justification information for draft new Q.3403 v.1 (ex Q.34_SI_BC_Req v.1)     Editor   Q2/11   2015-11-26
[ 907-GEN ]  
 
Considerations for SG11 restructuring in view of WTSA-16     Vice-chairman WP4/11   QALL/11   2015-11-24
[ 906-GEN ]  
 
LS/i/r on approval of SG11 Guidelines on "Testing Laboratories recognition procedure" (ex. Q.TL-rec-pro) and first meeting of ITU-T CASC (reply to SG11-LS 83R1) [from ITU-T SG5]     ITU-T SG5   CASC/11   2015-11-24
[ 905-GEN ]  
 
LS/i on Announcement of closure of Joint Coordination Activity on ICT and climate change (JCA-ICT&CC) [from ITU-T SG5]     ITU-T SG5   QALL/11   2015-11-24
[ 904-GEN ]  
 
LS/i on Current situation about Internet speed test in Japan [from TTC]     TTC   Q15/11   2015-11-24
[ 903-GEN ]  
 
LS/i/r on relevant activities on "Internet Speed Measurements" (reply to SG11-LS91) [from ITU-T SG12]     ITU-T SG12   Q15/11   2015-11-23
[ 902-GEN ]  
 
LS/i on new ITU-T SG20 [from ITU-T SG20]     ITU-T SG20   QALL/11   2015-11-20
[ 901-GEN ]  
 
Resolutions approved at the Radiocommunication Assembly (RA-15)     BR Study Groups Department   QALL/11   2015-11-20
[ 900-GEN ]  
(Rev.1-2) 
Approval - Technical Report on "ETS Interoperability limitations"     Editor   Q3/11   2015-11-19
[ 899-GEN ]  
 
Questions assigned to Study Group 11 (Signalling requirements, protocols and test specifications)     TSB   QALL/11   2015-11-13
[ 898-GEN ]  
 
Output - draft Recommendation ITU-T X.mp2p-pamp "Managed P2P communications: Peer Activity Management Protocol (PAMP)" (Rapporteur group e-meeting, 7-11 September 2015)     Editors   Q9/11   2015-11-13
[ 897-GEN ]  
 
Output - draft new Recommendation ITU-T X.mp2p-orcp "Managed P2P communications: Overlay Resource Control Protocol (ORCP)" (Rapporteur group e-meeting, 7-11 September 2015)     Editors   Q9/11   2015-11-13
[ 896-GEN ]  
 
LS/i on joint collaboration between ITU-T Study Group 20 and the IoT Lab [from ITU-T SG20]     ITU-T SG20   Q12/11   2015-11-12
[ 895-GEN ]  
 
Agenda of the meeting of the Conformity Assessment Steering committee (CASC)     Chairman CASC   CASC/11   2015-12-02
[ 894-GEN ]  
 
LS/i/r on collaboration between ITU-T and testing laboratories for ITU C&I programme (reply to COM11-LS76) [from ITU-T SG16]     ITU-T SG16   Q11/11, CASC/11   2015-11-03
[ 893-GEN ]  
 
LS/i/r on request for representatives in CASC (reply to COM11-LS83R1) [from ITU-T SG16]     ITU-T SG16   Q11/11, CASC/11   2015-11-03
[ 892-GEN ]  
 
LS/i/r on ongoing collaboration (reply to SG11 LS79, 84, 68 & 80) [from ITU-D SG2 Q4/2]     ITU-D SG2 Q4/2   Q11/11   2015-10-13
[ 891-GEN ]  
 
Report of the joint interim Rapporteur's group meeting of ITU-T Q11/11 and ETSI TC INT meeting (Vienna, 10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 890-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.C&I_VOC "Terms and definitions to be used in Conformance and Interoperability issues" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Associate Rapporteur Q11/11   Q11/11   2015-10-12
[ 889-GEN ]  
 
Output - The reference table of ITU-T Recommendations to be used for conformity/interoperability assessment (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 888-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3941.5 "Network integration testing between SIP and ISDN/PSTN network signalling protocols. Part 5: TSS&TP for Network Integration Tests between ISDN-ISDN and ISDN-PSTN over SIP II NNI / SIP-I NNI" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 887-GEN ]  
 
Output - Proposal to advance draft Recommendation ITU-T Q.3941.1 "Network integration testing between SIP and ISDN/PSTN network signalling protocols - Part 1: Test suite structure and test purposes for SIP-ISDN" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 886-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_IAD_TS_Part2 v.1 [3GPP Release 10] "PSTN/ISDN terminal equipment using IP Multimedia core network subsystem; Conformance testing; Part 2: TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 885-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CW_User_TS_Part3 v.1 [3GPP Release 10] "Communication waiting service using IP Multimedia core network subsystem; Conformance testing; Part 3: User side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 884-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CW_Net_TS_Part2 v.1 [3GPP Release 10] "Communication waiting service using IP Multimedia core network subsystem; Conformance testing; Part 2: Network side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 883-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CW_Net_TS_Part1 v.1 [3GPP Release 10] "Communication waiting service using IP Multimedia core network subsystem; Conformance testing; Part 1: Network side, User side, PICS" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 882-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CONF_User_TS_Part3 v.1 [3GPP Release 10] "Conference service using IP Multimedia core network subsystem; Conformance testing; Part 3: User side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 881-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CONF_Net_TS_Part2 v.1 [3GPP Release 10] "Conference service using IP Multimedia core network subsystem; Conformance testing; Part 2: Network side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 880-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CONF_Net_TS_Part1 v.1 [3GPP Release 10] "Conference service using IP Multimedia core network subsystem; Conformance testing; Part 1: Network side, User side, PICS" Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 879-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CDIV_User_TS_Part3 v.1 [3GPP Release 10] "Communication Diversion using IP Multimedia core network subsystem; Conformance testing; Part 3: User side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 878-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_CDIV_Net_TS_Part2 v.1 [3GPP Release 10] "Communication Diversion using IP Multimedia core network subsystem; Conformance testing; Part 2: Network side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 877-GEN ]  
 
Output - Proposal for a baseline text for draft Q.39_SI_CDIV_ Net_User_TS_Part1 v.1 [3GPP Release 10] "Communication Diversion using IP Multimedia core network subsystem; Conformance testing; Recommendation ITU-T Q.3944.3_SI_ HOLD_Net_TS_Part3 v.1 [3GPP Release 10] "Communication HOLD using IP Multimedia core network subsystem; Conformance testing; Part 1: User side, Network side,     Rapporteur Q11/11   Q11/11   2015-10-12
[ 876-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3944.2_SI_ HOLD_Net_TS_Part2 v.1 [3GPP Release 10] "Communication HOLD using IP Multimedia core network subsystem; Conformance testing; Part 2: Network side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 875-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3944.3 v.1 [3GPP Release 10] "Communication HOLD (HOLD) using IP multimedia core network subsystem; Conformance Testing; Part 3: User side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 874-GEN ]  
 
Output - Proposal to advance draft Recommendation ITU-T Q.3944.1 v.1 [3GPP Release 10] "Communication HOLD (HOLD) using IP multimedia core network subsystem; Conformance Testing. Part 1: Network side, User side, PICS"(Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 873-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3943.3-rev_SI_OIP_OIR_User_TS_Part3 v.1 [3GPP Release 10] "OIP and OIR using IP Multimedia core network subsystem; Conformance testing; Part 3: user side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 872-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3943.2-rev_SI_OIP_OIR_Net_TS_Part2 v.1 [3GPP Release 10] "OIP and OIR using IP Multimedia core network subsystem; Conformance testing; Part 2: network side, TSS&TP" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 871-GEN ]  
 
Output - Proposal for a baseline text for draft Recommendation ITU-T Q.3943.1-rev_SI_OIP_OIR_Net_User_TS_Part1 v.1 [3GPP Release 10] "OIP and OIR using IP Multimedia core network subsystem. Conformance testing. Part 1: user and network side, PICS" (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-12
[ 870-GEN ]  
 
Revised SIP-IMS conformance testing standardization work plan (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q11/11   Q11/11   2015-10-09
[ 869-GEN ]  
 
LS/o/r on vocabulary for conformance and interoperability (reply to SCV LS 8) [to ITU-D SG2 Q4/2]     Rapporteur Q11/11   Q11/11   2015-10-09
[ 868-GEN ]  
 
LS/o/r on Conformance and Interoperability Testing (CIT) activities for WP1/15 Recommendations (reply to SG15 LS 244) [to ITU-T SG15]     Rapporteur Q11/11   Q11/11   2015-10-09
[ 867-GEN ]  
 
LS/o/r on updated living list of key technologies, reference table of ITU-T Recommendations which are suitable for C&I and relevant pilot projects (reply to COM16-LS 126) [to ITU-T SG16]     Rapporteur Q11/11   Q11/11   2015-10-08
[ 866-GEN ]  
 
LS/o/r on ongoing collaboration (reply to ITU-D Q4/2 - SG2RGQ/79-E) [to ITU-D SG2 Q4/2]     Rapporteur Q11/11   Q11/11   2015-10-08
[ 865-GEN ]  
 
Report of the joint interim Rapporteur's group meeting of ITU-T Q15/11 and ETSI TC INT (Vienna, 9 September 2015)     Rapporteur Q15/11   Q15/11   2015-10-08
[ 864-GEN ]  
 
LS/o on ITU-T SG11 relevant activities on "Internet Speed Measurements" [to ITU-T SG12]     Rapporteur Q15/11   Q15/11   2015-10-08
[ 863-GEN ]  
 
LS/o on status of ITU-T Q15/11 activities which are related to "Internet Speed Measurements" [to ETSI TC INT]     Rapporteur Q15/11   Q15/11   2015-10-08
[ 862-GEN ]  
 
Report of the interim Rapporteur's group meeting of ITU-T Q10/11 (Vienna, 10 September 2015)     Rapporteur Q10/11   Q10/11   2015-10-08
[ 861-GEN ]  
 
Updated benchmarking standardization work plan (Joint Rapporteur meeting, Vienna, 8-10 September 2015)     Rapporteur Q10/11   Q10/11   2015-10-08
Results:249 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-11-17