Contributions
[ AI/Question: Q13/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1592 ]
(Rev.1-2) |
Propose SG15 to start pre-research project on IMT2020 Mobile back haul and front haul network
|
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
|
Q6/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2016-02-01 |
|
[ 1553 ]
|
RMS Frequency Offset of CPRI Clients Asynchronously Mapped to and Demapped from OTN
|
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-01-29 |
|
[ 1552 ]
|
PTP Timestamping on Multilane OTN Interfaces
|
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-01-29 |
|
[ 1543 ]
|
G.8272.1 Functional Model
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1542 ]
|
G.8272.1 Clause 9
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1541 ]
|
G.8272.1 Clause 8.2
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1540 ]
|
G.8272.1 Clause 6.3.1
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1539 ]
|
G.8272.1 Clause 6.2
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1538 ]
|
G.8272.1 Clause 6.1
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1537 ]
|
G.8272.1 Clause 6
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1536 ]
|
G.8272.1 scope
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1535 ]
|
G.8275.2 Support interoperability with equipment deployed per ITU-T G.8265.1
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1534 ]
|
G.8275.2 Table 1
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1533 ]
|
G.8275.2 data set members
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1532 ]
|
G.8275.1 twoStepFlag range for a Telecom Time Slave Clock
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1531 ]
|
G.8265.1 twoStepFlag range for a Slave only clock
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1523 ]
|
Follow-up on G.8275.2: Requirement for an Accurate T3 Value
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1522 ]
|
Summary on G.8266 for finalization.
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1521 ]
|
Clarification on the timing accuracy specification for the 1PPS measurement interface
|
Huawei Technologies Co., Ltd.
,
Orange
,
Telefon AB - LM Ericsson
|
Q13/15, Q11/15
|
2016-01-22 |
|
[ 1520 ]
|
Editorial on ToD from the contribution WDPisa32
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1519 ]
|
Phase/time synchronization over Microwave networks
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1518 ]
|
Additional information on frequencyTraceable Flag of G.8275.1
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1517 ]
|
Text modification under section 6.4 of G.8275.1
|
China Unicom
,
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1516 ]
|
PTP interfaces requirements for G.8266
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1515 ]
|
Proposal to study Synchronization over Ethernet in the Fronthaul (G.8271)
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1514 ]
|
Functional Block diagram for ePRTC
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1498 ]
|
Holdover Performance of T-BC with Physical Layer Assistance [G.8273.2]
|
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1497 ]
|
Rewording Holdover section [G.8273.2]
|
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1495 ]
|
Noise Generation T-TC [G.8273.3]
|
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1494 ]
|
Use of SyncE to backup GNSS [G.8275, G.8262.1]
|
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1493 ]
|
Backup PTP Connections in Partial On-Path Support Networks [G.8275, G.8275.2]
|
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1492 ]
|
TLV to carry timestamp interface information [G.8275.2]
|
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1491 ]
|
Definition of 2x1Way FPP for Partial On-Path Support [G.8260, G.8271.2]
|
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1488 ]
|
Review of G.8275 Living List Items
|
Alcatel-Lucent USA Inc.
|
Q13/15
|
2015-06-09 |
|
[ 1487 ]
|
Proposed corrigendum to G.824
|
Alcatel-Lucent USA Inc.
,
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1468 ]
|
ITU-T G.8271 Network Reference Model Extension
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2015-06-09 |
|
[ 1467 ]
|
Access Budget (Optical/Copper Media) within E2E Time/phase HRM
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2015-06-09 |
|
[ 1466 ]
|
ITU-T G.8271 Access HRM Model Extension
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2015-06-09 |
|
[ 1455 ]
|
Transport of the clockClass message over GPON
|
Alcatel-Lucent Shanghai Bell
,
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q2/15, Q13/15
|
2015-06-09 |
|
[ 1446 ]
|
Small edits to MATIE and MAFE in G.8260
|
Nokia Solutions and Networks GmbH & Co. KG
|
Q13/15
|
2015-06-09 |
|
[ 1445 ]
|
Small edits to G.8260
|
Nokia Solutions and Networks GmbH & Co. KG
|
Q13/15
|
2015-06-09 |
|
[ 1440 ]
|
Physical Interfaces for Telecom Grand Master for frequency (G.8266)
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2015-06-09 |
|
[ 1438 ]
|
Illustration of Packet Delay Variation (PDV) over GPON (access network) technology
|
Orange
|
Q4/15, Q2/15, Q13/15
|
2015-06-09 |
|
[ 1437 ]
|
G.8273.2 Mandatory 1PPS output interface for Telecom Slave Clock (T-TSC).
|
A1 Telekom Austria AG
,
AT&T, Inc.
,
China Mobile Communications Corporation
,
Deutsche Telekom AG
,
Orange
,
Swisscom SA
,
Verizon Communication Corporation
|
Q13/15
|
2015-06-09 |
|
[ 1416 ]
|
G.8273.3: TC Noise Generation
|
Calnex Solutions Limited
|
Q13/15
|
2015-06-09 |
|
[ 1414 ]
|
T-TC and VLAN (G.8275.1)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2015-06-09 |
|
[ 1399 ]
|
G.8275.2 A-BMCA options - Convergence and rearrangements aspects
|
ADVA Optical Networking
|
Q13/15
|
2015-06-09 |
|
[ 1397 ]
|
Unfiltered BC specification
|
ADVA Optical Networking
|
Q13/15
|
2015-06-09 |
|
[ 1394 ]
|
Phase and time distribution without physical layer frequency support
|
ADVA Optical Networking
|
Q13/15
|
2015-06-09 |
|
[ 1393 ]
|
Network design aspects for phase delivery - Eth' speed mismatch
|
ADVA Optical Networking
|
Q13/15
|
2015-06-09 |
Results:474 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):