Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 248 ]
|
G.HSP modulation technologies comparison for above 10Gb/s per wavelength
|
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2017-06-06 |
|
[ 247 ]
|
G.mgfast: Simulation of Aggregate Data Rate of CAT5e & CAT6 Cables
|
Huawei Technologies Co., Ltd. (China)
,
CAICT
,
MITT
|
Q4/15
|
2017-06-06 |
|
[ 246 ]
|
Proposal to enhance flexible grid related content in draft revised G.672
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q7/15
|
2017-06-06 |
|
[ 245 ]
|
G.mgfast: Channel Measurements of CAT5e & CAT6 Cables
|
Huawei Technologies Co., Ltd. (China)
,
CAICT
,
MITT
|
Q4/15
|
2017-06-06 |
|
[ 244 ]
|
Experimental results and observations for the metric to define the transmitter quality in G.698.2
|
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2017-06-06 |
|
[ 243 ]
(Rev.1) |
Effect of thermal ramps on phase accuracy for APTS and PTS implementations
|
Nokia Corporation
|
Q13/15
|
2017-06-06 |
|
[ 242 ]
|
Comments on FlexE related atomic function
|
ZTE Corporation (China)
|
Q11/15, Q10/15
|
2017-06-06 |
|
[ 241 ]
|
Application scenario, interface type analysis and OTN solution consideration for 5G transport
|
ZTE Corporation (China)
|
Q12/15, Q11/15
|
2017-06-06 |
|
[ 240 ]
|
Proposal for Combination G-PON and XG(S)-PON reach extender
|
Orange (France)
,
ZTE Corporation (China)
|
Q2/15
|
2017-06-06 |
|
[ 239 ]
|
Wavelength allocation options for above 10Gb/s per wavelength PONs
|
ZTE Corporation (China)
|
Q2/15
|
2017-06-06 |
|
[ 238 ]
|
Proposal for Combination G-PON and XG(S)-PON reach extender
Duplicate of C240
|
ZTE Corporation (China)
|
Q2/15
|
2017-06-06 |
|
[ 237 ]
|
Proposal for RE ONU mapping in G.9807.2
|
ZTE Corporation (China)
|
Q2/15
|
2017-06-06 |
|
[ 236 ]
|
Comments on the draft G.8132
|
ZTE Corporation (China)
|
Q9/15
|
2017-06-06 |
|
[ 235 ]
|
Considerations on Mobile Fronthaul and 5G Transport
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15, Q11/15
|
2017-06-06 |
|
[ 234 ]
|
Editorial proposals for G.8271.1 Appendix VIII
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2017-06-06 |
|
[ 233 ]
|
G.vlc: Odd-DCO-OFDM: A Dimmable DCO-OFDM Scheme
|
Futurewei Technologies US R&D Center (United States)
|
Q18/15
|
2017-06-06 |
|
[ 232 ]
|
Proposals to component interactions for performance and alarm monitoring and reporting in draft G.7702
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q14/15, Q12/15
|
2017-06-06 |
|
[ 231 ]
|
Proposal on moving cut-off wavelength to cable attribute in ITU-T Recs. G.65x
|
FiberHome Technologies Group (China)
|
Q5/15
|
2017-06-06 |
|
[ 230 ]
|
Proposed texts of clause 9.1 of G.7702
|
FiberHome Technologies Group (China)
|
Q14/15, Q12/15
|
2017-06-06 |
|
[ 229 ]
|
Proposal about interaction of control components for resource virtualization and resource view maintenance of G.7702
|
FiberHome Technologies Group (China)
|
Q14/15, Q12/15
|
2017-06-06 |
|
[ 228 ]
|
Consideration on how to support 5G fronthaul interfaces
|
FiberHome Technologies Group (China)
|
Q11/15
|
2017-06-06 |
|
[ 227 ]
|
Consideration on OTN application in 5G network
|
FiberHome Technologies Group (China)
|
Q11/15
|
2017-06-06 |
|
[ 226 ]
|
Simulation results on the influence of atomic clock group change on combinatorial clock output performance.
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2017-06-06 |
|
[ 225 ]
|
G.vlc: discussions on the necessity of the broadcast of LLC frame in CM mode
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q18/15
|
2017-06-06 |
|
[ 224 ]
|
An implementation of ePRC based on optical clock
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2017-06-06 |
|
[ 223 ]
|
Some consideration for TDEV tolerance noise in G.812
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2017-06-06 |
|
[ 222 ]
|
Propose to review the terminology "switch time" and "transfer time" in Q9/15
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q9/15
|
2017-06-06 |
|
[ 221 ]
|
Some suggestions for the definition of phase discontinuity in G.811.1
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2017-06-06 |
|
[ 220 ]
|
A potential solution for combinatorial clock optimization in G.811.1
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q13/15
|
2017-06-06 |
|
[ 219 ]
(Rev.1) |
Virtualization in G.7701/G.7702
|
FiberHome Technologies Group (China)
|
Q14/15, Q12/15
|
2017-06-06 |
|
[ 218 ]
|
Update of the information model for synchronization
|
ZTE Corporation (China)
|
Q14/15
|
2017-06-06 |
|
[ 217 ]
|
Considerations on Alarm/Notification Management
|
ZTE Corporation (China)
|
Q12/15
|
2017-06-06 |
|
[ 216 ]
|
Proposal to initiate work on a new draft of Recommendation for management information model of synchronization
|
ZTE Corporation (China)
|
Q14/15
|
2017-06-06 |
|
[ 215 ]
|
G.vlc: on the medium independent specification of MIMO
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q18/15
|
2017-06-06 |
|
[ 214 ]
|
EVM related test results of commercial transponders
|
Ministry of Industry and Information Technology (MIIT) (China)
,
China Mobile
,
ZTE Corporation (China)
|
Q6/15
|
2017-06-06 |
|
[ 213 ]
|
Some suggestions on the progress of G.698.2
|
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2017-06-06 |
|
[ 212 ]
|
Proposed revision of Appendix V to G.959.1
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/15
|
2017-06-06 |
|
[ 211 ]
|
Proposal to add description of stainless steel loose tube in ITU-T L.100/L.10 and L.101/L.43
|
FiberHome Technologies Group (China)
|
Q16/15
|
2017-06-06 |
|
[ 210 ]
|
G.989.3: Use of Layer 4 Information for LAG/ECMP-based Bonding Hash
|
ADTRAN (United States)
|
Q2/15
|
2017-06-06 |
|
[ 209 ]
|
G.988: Issue with 64-bit PM pointer
|
ADTRAN (United States)
|
Q2/15
|
2017-06-06 |
|
[ 208 ]
|
G.989.3, G.988: Channel Bonding Principles
|
ADTRAN (United States)
,
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2017-06-06 |
|
[ 207 ]
|
ITU-T GPON Co-Existence with Future IEEE 802.3ca PON Wavelength(s)
|
AT&T, Inc. (United States)
|
Q2/15
|
2017-06-06 |
|
[ 206 ]
(Rev.1) |
Network Slicing Considerations
|
Microsemi Corporation (United States)
,
Nokia USA
|
Q12/15, Q11/15, Q10/15
|
2017-06-05 |
|
[ 205 ]
(Rev.1) |
Recommendation G.9903 to be sent to consent
|
ERDF
|
Q15/15
|
2017-06-05 |
|
[ 204 ]
|
Noise generation requirement in G.8262.1
|
Qulsar, Inc.
|
Q13/15
|
2017-06-05 |
|
[ 203 ]
(Rev.1) |
Send Recommendation G.9901 to determination
|
ERDF
|
Q15/15
|
2017-06-05 |
|
[ 202 ]
|
Packet selection implication in G.8273.2
|
Qulsar, Inc.
|
Q13/15
|
2017-06-05 |
|
[ 201 ]
(Rev.1) |
Verizon OpenOMCI Specification
|
ADTRAN (United States)
,
Broadcom Corporation (United States)
,
Calnex Solutions Limited (United Kingdom)
,
Intel Corporation (United States)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2017-06-05 |
|
[ 200 ]
|
G.988: New and modified MEs in support of NG-PON2 and NG-PON2 interop
|
ADTRAN (United States)
,
Broadcom Corporation (United States)
,
Calnex Solutions Limited (United Kingdom)
,
Intel Corporation (United States)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2017-06-05 |
|
[ 199 ]
|
G.8271.1 : Editor's Corrections
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-05 |
Results:398 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):