International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2018-01-29 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2018-01-29) 

ITU-T SG 15

Transport, access and home

Study Period 2017

Meeting  from 2018-01-29 to 2018-02-09

held in Switzerland [Geneva]

Other Meetings : 2021-12-06  2021-04-12  2020-09-07  2020-01-27  2019-07-01  2018-10-08  2017-06-19 

Results:346 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 594 ]  
 
Noise Transfer Performance [G.8273.4]     Microsemi Corporation (United States)   Q13/15   2018-01-16
[ 593 ]  
 
Noise Tolerance [G.8273.4]     Microsemi Corporation (United States)   Q13/15   2018-01-16
[ 592 ]  
 
Noise Generation Performance [G.8273.4]     Microsemi Corporation (United States)   Q13/15   2018-01-16
[ 591 ]  
 
Noise Generation General [G.8273.4]     Microsemi Corporation (United States)   Q13/15   2018-01-16
[ 590 ]  
 
Interfaces [G.8273.4]     Microsemi Corporation (United States)   Q13/15   2018-01-16
[ 589 ]  
 
Change Clause Organization to Split -A and -P clocks [G.8273.4]     Microsemi Corporation (United States)   Q13/15   2018-01-16
[ 588 ]  
 
Budget & General Performance Information [G.8273.4]     Microsemi Corporation (United States)   Q13/15   2018-01-16
[ 587 ]  
 
Splitting PTS & APTS Clock Types in General: T-BC-A vs T-BC-P     Microsemi Corporation (United States)   Q13/15   2018-01-16
[ 586 ]  
 
Proposed editorial modification to TD56, the outcome of draft L.cci from June 2017 SG15 meeting     Waseda University   Q16/15   2018-01-16
[ 585 ]  
 
G.hn: A mechanism for DM to force EP to enter low power mode     Hisilicon Technologies Co. Ltd.   Q18/15   2018-01-16
[ 584 ]  
 
Bandwidth assignment and latency control in TDM-PON for 5G fronthaul transport     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q2/15   2018-01-16
[ 583 ]  
 
Proposal on draft new Recommendation: Generic architecture of home networks for energy management     Fujitsu Limited (Japan) , Japan Advanced Institute of Science and Technology , Kanazawa Institute of Technology , Mitsubishi Electric Corporation , Oki Electric Industry Company Ltd. (OKI) , Panasonic Corporation   Q15/15   2018-01-16
[ 582 ]  
 
Analysis on how to use TAPI to support network slice for IMT-2020/5G     ZTE Corporation (China)   Q14/15, Q12/15, Q11/15   2018-01-16
[ 581 ]  
 
Considerations on supporting E2E network slice for IMT-2020/5G     ZTE Corporation (China)   Q14/15, Q12/15, Q11/15   2018-01-16
[ 580 ]  
 
Proposed Supplement to G.9903 - Detailed Explanation of 6LoWPAN Usage  
Not yet uploaded
 
Huawei Technologies Co., Ltd. (China)   Q15/15   2018-01-16
[ 579 ]  
(Rev.1) 
Proposed revision of Annex A.2 in G.RoF     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) , Futurewei Technologies US R&D Center (United States) , National Institute of Information and Communications Technology (NICT)   Q2/15   2018-01-16
[ 578 ]  
(Rev.1) 
Revisions of Appendix VII for G.RoF recommendation     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q2/15   2018-01-16
[ 577 ]  
 
5G Network slicing requirement for transport network with SDN     China Unicom , Huawei Technologies Co., Ltd. (China)   Q14/15, Q12/15   2018-01-16
[ 576 ]  
 
Considerations on M-OTN transport signal bit rates and client mapping     FiberHome Technologies Group (China)   Q6/15, Q12/15, Q11/15   2018-01-16
[ 575 ]  
 
Considerations on possible 25G and 50G M-OTN frame signal structures     China Telecommunications Corporation , FiberHome Technologies Group (China)   Q6/15, Q12/15, Q11/15   2018-01-16
[ 574 ]  
 
FlexE 2.0 support in G.709 Clause 17.12 ( FlexE Aware mapping into OPUflex)     FiberHome Technologies Group (China)   Q11/15   2018-01-16
[ 573 ]  
(Rev.1-2) 
FlexO-LR Error Decorrelator Interleaver Synchronization     Coriant GmbH & Co. KG (Germany) , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Inphi Corporation   Q11/15   2018-01-16
[ 572 ]  
 
On the functional reference model of MGFAST transceiver     Intel Corporation (United States)   Q4/15   2018-01-16
[ 571 ]  
 
Proposal for channel bonding in G.mgfast     Intel Corporation (United States)   Q4/15   2018-01-16
[ 570 ]  
(Rev.1) 
Report of Proposed M-OTN Mapping and Multiplexing schemes discussed in a Series of Conference Calls [Survey of FlexO-based approaches for Mobile Fronthaul and Midhaul applications. (Multiplexing)     China Telecommunications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Microsemi Corporation (United States) , ZTE Corporation (China)   Q11/15   2018-01-16
[ 569 ]  
(Rev.1-3) 
Report of Proposed M-OTN Frame Formats discusses in a Series of Conference Calls [FlexO-based approach for Mobile Fronthaul and Midhaul applications]     China Telecommunications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Microsemi Corporation (United States) , ZTE Corporation (China)   Q11/15   2018-01-16
[ 568 ]  
 
Proposal to define MRT in G.fast     Intel Corporation (United States)   Q4/15   2018-01-16
[ 567 ]  
 
25G Line Interface Considerations     Nokia USA   Q6/15, Q12/15, Q11/15   2018-01-15
[ 566 ]  
 
ETH Termination Point Refactoring for G.8052.1     FiberHome Technologies Group (China)   Q14/15   2018-01-15
[ 565 ]  
(Rev.1) 
Proposed living list items and text updates for G.808.2 revision     Coriant GmbH & Co. KG (Germany)   Q9/15   2018-01-15
[ 564 ]  
 
New Channel Options - 40 channel proposal for G.metro     Finisar Corporation , Infinera Corporation   Q6/15   2018-01-15
[ 563 ]  
 
Additional insights on modulation formats for G.sup.HSP     Nokia USA   Q2/15   2018-01-15
[ 562 ]  
 
Use of MGFAST for in-home distribution     Intel Corporation (United States)   Q4/15   2018-01-15
[ 561 ]  
 
Input for GSTR-TN5G Section 7 on Latency  
To be verified by TSB
 
Nokia USA   Q12/15, Q11/15   2018-01-15
[ 560 ]  
 
On the modern in-home distribution architecture     Intel Corporation (United States)   Q4/15   2018-01-15
[ 559 ]  
 
Proposal for new Appendix for 2:n Splitter Coexistence approach     Nokia USA   Q2/15   2018-01-15
[ 558 ]  
 
Proposed corrigendum for G.9701 and G.997.2 (INP_act_REIN)     Intel Corporation (United States)   Q4/15   2018-01-15
[ 557 ]  
 
Proposed corrigendum to G.9701 (ETT)     Intel Corporation (United States)   Q4/15   2018-01-15
[ 556 ]  
(Rev.1) 
Proposed update to LAG functional model in G.8021     Coriant GmbH & Co. KG (Germany) , Nokia USA   Q11/15, Q10/15   2018-01-15
[ 555 ]  
 
Moving ODUk/ETH adaptation functions from G.8021 to G.798     Coriant GmbH & Co. KG (Germany)   Q11/15, Q10/15   2018-01-15
[ 554 ]  
 
GNSS-TR reference to ATIS report     Microsemi Corporation (United States)   Q13/15   2018-01-15
[ 553 ]  
 
GNSS-TR editorials for GPS, GLONASS, BEIDOU overview     Microsemi Corporation (United States)   Q13/15   2018-01-15
[ 552 ]  
(Rev.1) 
cnPRTC functional architecture     Microsemi Corporation (United States)   Q13/15   2018-01-15
[ 551 ]  
 
PRTC-B performance with OCXO and Rb oscillators     Microsemi Corporation (United States)   Q13/15   2018-01-15
[ 550 ]  
 
Proposal to start an activity for defining how to optimize transport of PDH/SDH and sub-Gb/s signals into OTN     Huawei Technologies Co., Ltd. (China) , Nokia USA , SM Optics s.r.l. (Italy) , Telecom Italia S.p.A. , Telefónica S.A.   Q12/15, Q11/15   2018-01-15
[ 549 ]  
 
Interaction of notification component with other control components     FiberHome Technologies Group (China)   Q14/15, Q12/15   2018-01-15
[ 548 ]  
 
Demonstration of FlexE based network slicing by FiberHome     FiberHome Technologies Group (China)   Q14/15, Q12/15, Q11/15   2018-01-15
[ 547 ]  
(Rev.1) 
G.hn: Technical Paper for BPL access in smart grid network     Sigma Designs Israel S.D.I Ltd.   Q18/15   2018-01-15
[ 546 ]  
 
Implementation of FlexE related features by FiberHome     FiberHome Technologies Group (China)   Q12/15, Q11/15   2018-01-15
[ 545 ]  
 
Proposals for GSTR-TN5G     Telefon AB - LM Ericsson (Sweden)   Q13/15, Q12/15, Q11/15   2018-01-15
Results:346 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-8-9