Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1821 ]
|
Proposals for the Clause 9.2.5 and 9.2.6 of G.Suppl.SyncOAM
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2020-01-14 |
|
[ 1820 ]
|
Alignment of G.876 with G.807
|
Nokia Shanghai Bell Co. Ltd. (China)
|
Q14/15
|
2020-01-14 |
|
[ 1819 ]
|
Proposal for the NS layer of G.781.1
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2020-01-14 |
|
[ 1818 ]
|
The monitor of time error between PTP and GNSS [G.Suppl.SyncOAM, G.8275.1]
|
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1817 ]
|
A method of detecting clock failures via monitoring frequency offsets [G.Suppl.SyncOAM]
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2020-01-14 |
|
[ 1816 ]
|
FlexE Timing over OTN
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15, Q11/15
|
2020-01-14 |
|
[ 1815 ]
|
eQL enabled and disabled mode [G.781]
|
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2020-01-14 |
|
[ 1814 ]
|
Proposal of creating new work item on architectural framework for ML in Transport Network
|
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q14/15, Q12/15
|
2020-01-14 |
|
[ 1813 ]
|
Some test results and parameter value proposals for 25G application code in revision of G.698.1
|
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2020-01-14 |
|
[ 1812 ]
|
Budget analysis of relative time error [G.8273.2]
|
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1811 ]
|
Hops consumption on OTN node
|
China Information Communication Technologies Group
,
China Unicom
,
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1810 ]
|
Propose to define 25G new application codes in revision of G.695
|
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2020-01-14 |
|
[ 1809 ]
|
PRTC holdover performance with frequency support
|
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Orange (France)
|
Q13/15
|
2020-01-14 |
|
[ 1808 ]
|
PTP message loss measurement and alarm
|
China Information Communication Technologies Group
|
Q13/15
|
2020-01-14 |
|
[ 1807 ]
|
Modification of asymmetry compensation for use of different wavelengths in G.8271
|
China Information Communication Technologies Group
|
Q7/15, Q6/15, Q13/15
|
2020-01-14 |
|
[ 1806 ]
|
APC requirements for sensor network applications in G.iot
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q18/15
|
2020-01-14 |
|
[ 1805 ]
(Rev.1) |
Transmission asymmetry delay compensation for bidirectional module
|
China Information Communication Technologies Group
|
Q7/15, Q6/15, Q14/15, Q13/15
|
2020-01-14 |
|
[ 1804 ]
|
G.8152.1 YANG model
|
China Information Communication Technologies Group
,
China Mobile Communications Corporation
|
Q14/15
|
2020-01-14 |
|
[ 1803 ]
|
G.mgfast: Initialization in P2MP scenario
|
Intel Corporation (United States)
|
Q4/15
|
2020-01-14 |
|
[ 1802 ]
|
G.mgfast: Proposed text for Channel Analysis and Exchange phase of initialization
|
Broadcom Corporation (United States)
,
Intel Corporation (United States)
|
Q4/15
|
2020-01-14 |
|
[ 1801 ]
|
G.mgfast: Proposed text for clause 12.3.2 (G.994.1 handshake phase)
|
Broadcom Corporation (United States)
,
Intel Corporation (United States)
|
Q4/15
|
2020-01-14 |
|
[ 1800 ]
|
25Gb/s upstream sensitivity in G.hsp.50Gpmd
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2020-01-14 |
|
[ 1799 ]
|
Proposal to consider management channel security of sub1G
|
China Unicom
|
Q14/15, Q11/15
|
2020-01-14 |
|
[ 1798 ]
(Rev.1) |
G.994.1: Proposed working text updates for Amendment 1
|
Intel Corporation (United States)
|
Q4/15
|
2020-01-14 |
|
[ 1797 ]
|
Sealed closures long term reliability
|
China Information Communication Technologies Group
,
Hengtong Optic-electric Co., Ltd. (China)
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q16/15
|
2020-01-14 |
|
[ 1796 ]
(Rev.1) |
G.mgfast: Data frame padding with LDPC
|
Broadcom Corporation (United States)
,
Intel Corporation (United States)
|
Q4/15
|
2020-01-14 |
|
[ 1795 ]
|
Proposals and clarifications for the improvement of G.ctn5g
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q12/15, Q11/15
|
2020-01-14 |
|
[ 1794 ]
|
Increase the salt spray test duration to 10 days
|
China Information Communication Technologies Group
,
Hengtong Optic-electric Co., Ltd. (China)
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q16/15
|
2020-01-14 |
|
[ 1793 ]
(Rev.1) |
G.fast: Proposed corrigendum - IAR bands
|
Intel Corporation (United States)
|
Q4/15
|
2020-01-14 |
|
[ 1792 ]
|
Fungi and UV test for the raw materials
|
China Information Communication Technologies Group
,
Hengtong Optic-electric Co., Ltd. (China)
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q16/15
|
2020-01-14 |
|
[ 1791 ]
|
Proposal of SNR related issues in new Recommendation G.977.1
|
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q8/15
|
2020-01-14 |
|
[ 1790 ]
(Rev.1) |
Fault reporting in G.7701 Amd2
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2020-01-14 |
|
[ 1789 ]
(Rev.1) |
Configuration of the Fault Event Filtering information in G.7701 Amd2
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2020-01-14 |
|
[ 1788 ]
|
Consideration of high count fibre pairs and SDM application in submarine system
|
China Mobile Communications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q8/15
|
2020-01-14 |
|
[ 1787 ]
|
Configuration of FlexE
|
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2020-01-14 |
|
[ 1786 ]
|
Example of machine learning architecture used in an SDN controller
|
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2020-01-14 |
|
[ 1785 ]
|
Consideration on the management content of G.7718
|
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2020-01-14 |
|
[ 1784 ]
|
Comments on UML model of G.8152.1
|
China Information Communication Technologies Group
,
China Mobile Communications Corporation
|
Q14/15
|
2020-01-14 |
|
[ 1783 ]
|
considerations about the 25G CWDM
|
ZTE Corporation (China)
|
Q6/15
|
2020-01-14 |
|
[ 1782 ]
|
Proposed new work item on optical/electrical hybrid fibre cable and related application scenarios
|
Alibaba China Co. Ltd.
,
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
China Unicom
,
Hengtong Optic-electric Co., Ltd. (China)
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
|
Q16/15
|
2020-01-14 |
|
[ 1781 ]
|
Lower layer PRTC deployment
|
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2020-01-14 |
|
[ 1780 ]
|
New clauses for PC and TP components in G.7701
|
China Information Communication Technologies Group
|
Q14/15, Q12/15
|
2020-01-14 |
|
[ 1779 ]
|
Propose to analyse the necessity for OOF and OOM state in G.8023
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q11/15
|
2020-01-14 |
|
[ 1778 ]
|
MTN-based virtual network
|
China Information Communication Technologies Group
,
China Mobile Communications Corporation
|
Q14/15, Q12/15
|
2020-01-14 |
|
[ 1777 ]
|
The analysis of OAM insertion methods in MTN path layerzz
|
ZTE Corporation (China)
|
Q11/15
|
2020-01-14 |
|
[ 1776 ]
|
Performance evaluation of LDPC code
|
ZTE Corporation (China)
|
Q2/15
|
2020-01-14 |
|
[ 1775 ]
|
Proposed values for 25G application codes in revision of G.698.4
|
China Unicom
|
Q6/15
|
2020-01-14 |
|
[ 1774 ]
|
G.9806 PMD values for 10G
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
ZTE Corporation (China)
|
Q2/15
|
2020-01-14 |
|
[ 1773 ]
|
Apply the ML architecture in Y.3172 to transport network
|
China Information Communication Technologies Group
|
Q14/15, Q12/15
|
2020-01-14 |
|
[ 1772 ]
|
Proposals for MTN Section alarms and performance error events in G.mtn-eqpt
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q11/15
|
2020-01-14 |
Results:436 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):