Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP5B : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP5B  C 

UIT-R WP5B

Servicio móvil marítimo, incluido el sistema mundial de socorro y seguridad marítimos (SMSSM); servicio móvil aeronáutico, y servicio de radiodeterminación

Resultados :731 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 581 ]  
 
Liaison statement to Working Party 5B - Work status on the coexistence conditions between IMT and aeronautical mobile service in the band 4 800-4 990 MHz     WP 5D     2018-10-19
[ 580 ]  
 
Liaison statement to the International Maritime Organization (copy for information to Working Parties 4C, 5B and ICAO) - "Possible interference of terrestrial mobile communications with L-band maritime satellite communications"     WP 5D     2018-10-19
[ 579 ]  
 
Reply liaison statement on Facilities for resetting own-ship MMSI and DSC equipment     European Telecommunications Standards Institute     2018-10-17
[ 578 ]  
 
Information in response to the Note to the Director on generic envelope of characteristics of earth stations communicating with space stations in the fixed satellite service which are in compliance with Resolution 155 (WRC-15)     Director, BR     2018-10-17
[ 577 ]  
 
Report of the fourteenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     International Maritime Organization     2018-10-11
[ 576 ]  
 
Liaison statement on ITU inter-Sector coordination: ITU-R Working Parties 5A, 5B and 5C versus ITU-T Questions     ITU-T SG 5     2018-10-10
[ 575 ]  
 
Liaison statement to Working Parties 4C, 5A, 5B, 5C and 6A - Characteristics and protection criteria for aeronautical mobile (route) systems operating in the frequency band 117.975 - 137 MHz     WP 7B   AI1.7   2018-10-02
[ 574 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7     WP 7B   AI1.7   2018-10-01
[ 573 ]  
 
Liaison statement on work being carried out under study in ITU-T Question 3/5     ITU-T SG 5     2018-10-01
[ 572 ]  
 
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7D for information) - Preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems     WP 7A     2018-09-28
[ 571 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 7B) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 7C     2018-09-28
[ 570 ]  
(Rev.1) 
Questions raised during the CPM-19 Management Team meeting     Rapporteur, CPM Chapter 5     2018-09-27
[ 569 ]  
 
Liaison statement to Working Party 5B - Proposal for modification of working document towards a preliminary draft new Recommendation ITU-R M.[AMRD] - WRC-19 agenda item 1.9.1     WP 7D   AI1.9.1   2018-09-25
[ 568 ]  
 
Reply liaison statement to Working Party 5B - e.i.r.p. of terrestrial radars operating in EESS (active) frequency bands from 432 MHz to 238 GHz     WP 7C     2018-09-24
[ 567 ]  
 
Reply liaison statement to Working Party 5B - Working document towards a preliminary draft new Report ITU-R M.[FOD 92-100 GHz] and Working document towards a preliminary draft new Report ITU-R M.[FOD_share]     WP 7C     2018-09-24
[ 566 ]  
 
Note to Working Parties 5B and 4A on Resolution 155 (WRC-15)     Director, BR     2018-09-21
[ 565 ]  
 
Reply to a liaison statement from Working Party 5B to ICAO (copy to Working Party 7B for information) - Characteristics and Protection Criteria for Aeronautical and Maritime Systems     International Civil Aviation Organization   Q235/5   2018-09-20
[ 564 ]  
 
Liaison statement to Working Parties 4C and 5D (copy to Working Party 5B) and CEPT ECC PT 1 - Possible interference of terrestrial mobile communications with L-band maritime satellite communications     International Maritime Organization     2018-09-11
[ 563 ]  
 
Maritime Radio Communications Plan December 2017 - For information     International Association of Marine Aids to Navigation and Lighthouse Authorities     2018-08-30
[ 562 ]  
 
Response on liaison statement from the ITU-R on 'EMI standards for LED lighting'     International Special Committee on Radio Interference     2018-07-24
[ 561 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 5A, 5C and 7C) - Aeronautical mobile service (AMS) technical characteristics in 21.2-22 GHz     WP 4A     2018-07-24
[ 560 ]  
 
Liaison statement to International Maritime Organization and the International Mobile Satellite Organization (copy for information to Working Parties 5B, 5D, and ICAO) - Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518-1 559 MHz     WP 4C     2018-07-18
[ 559 ]  
 
Liaison statement to Working Party 7D (copy for information to Working Party 5B) - Unwanted emissions in the RAS band from space-to-Earth transmissions from MSS satellites     WP 4C   AI1.8   2018-07-18
[ 558 ]  
 
Liaison statement to Working Party 5B - WRC-19 agenda item 1.8, Resolution 359 (Rev. WRC-15), resolves 2: supporting material on the use of the 1 616-1 626.5 MHz frequency band for GMDSS     WP 4C   AI1.8   2018-07-18
[ 557 ]  
(Rev.1) 
Reply liaison statement to Working Party 7A (copy to working parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding FSS/MSS/BSS     WP 4B     2018-07-06
[ 556 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Party 5B) - Clutter loss model for sharing study regarding aeronautical path below 6 GHz     WPs 3K and 3M     2018-07-02
[ 555 ]  
 
Liaison statement to Working Parties 1A, 5A, 5B and 6A (copy to Working Party 1B for information) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]     WP 3L     2018-07-02
[ 554 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 4C     2018-07-02
[ 553 ]  
 
Reply liaison statement to Working Parties 5A, 5B and 6A (copy to Working Party 1B) - Preliminary draft new Report ITU-R SM.[WPT_100-148.5KHZ]     WP 1A   Q210/1   2018-06-29
[ 552 ]  
 
Liaison statement to Working Parties 5A, 5B, 6A and 7A (copy to Working Party 1B for information) on preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems     WP 1A   Q210/1   2018-06-29
[ 551 ]  
 
Liaison statement to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid utility management systems     WP 1A     2018-06-29
[ 550 ]  
 
Reply liaisons statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7D) - Liaison activities on the G.mgfast PSD specification     WP 1A     2018-06-29
[ 549 ]  
 
Reply liaison statement to Working Party 6A (copy to Working Parties 1A, 5B and 7A) - Draft CPM text on WRC-19 agenda item 9.1, Issue 9.1.6     WP 1B   AI9.1   2018-06-28
[ 548 ]  
 
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Radio Regulations     WP 1A     2018-06-21
[ 547 ]  
 
Liaison statement to CISPR and ITU-T Study Group 5 on EMC standards and limits (copy to ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C & 7D) - Further Reports of Disturbances to Radiocommunication systems     WP 1A     2018-06-21
[ 546 ]  
 
Reply liaison statement to Working Party 7A (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 6B, 6C, 7B, 7C, and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" and UTC application in IMT systems     WP 5D     2018-06-21
[ 545 ]  
 
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 5B) - Clutter loss model for sharing study regarding aeronautical path below 6 GHz     WP 5D     2018-06-21
[ 544 ]  
 
Liaison statement to Working Parties 5B and 3L - Working document towards a preliminary draft new Report ITU-R M.[HF NOISE AT SEA]     WP 1C     2018-06-15
[ 543 ]  
 
Liaison statement to Working Party 6A (copied for information to Working Parties 3K, 3M, 5B and 5C) - Updated on work towards WRC-19 agenda item1.1     WP 5A     2018-06-06
[ 542 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (copy for information to Working Parties 3M and 5B) - Progress on WRC-19 agenda item 1.14     WP 5C   AI1.14   2018-06-05
[ 541 ]  
(Rev.1) 
Liaison statement on work which is under study in ITU-T Q3/5     ITU-T SG 5     2018-06-04
[ 540 ]  
 
Reply to ITU-R Working Party 5B liaison statement request on more information related to Facilities for resetting own-ship MMSI and DSC equipment     European Telecommunications Standards Institute     2018-05-30
[ 539 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L, 5B and 6A) - Applicability of Recommendation ITU-R M.1732 for use in studies undertaken in working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]     WP 5A     2018-05-31
[ 538 ]  
+Ann.1-35 
Report on the twenty first meeting of Working Party 5B (Geneva, 21 May - 1 June 2018)     Chairman, WP 5B     2018-05-31
[ 537 ]  
 
Final list of participants - Working Party 5B (Geneva, 21 May - 1 June 2018)     Director, BR     2018-05-31
[ 536 ]  
 
Reply liaison statement to ITU-R Working Party 5C (copy for information to Working Parties 3M, 4A, 4C, 5B, 5D, 7B, 7C, 7D and Task Group 5/1) - WRC-19 agenda item 1.14     WP 5B     2018-06-19
[ 535 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 5C, 7B and 7C) - Technical and operational characteristics of conventional and trunked land mobile systems operating in the mobile service allocations below 869 MHz to be used in sharing studies     WP 5A     2018-05-25
[ 534 ]  
 
This document has been withdrawn     BRSGD     2018-05-29
[ 533 ]  
 
Reply liaison statement to ITU-R Working Party 5B - AMRDs under WRC-19 agenda item 1.9.1     WP 5A     2018-05-25
[ 532 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - Status of WRC-19 agenda item 1.7     WP 7B   AI1.7   2018-05-21
Resultados :731 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2019-10-18