Contribuciones
[ AI/Cuestión: Q9/15 ] |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 529 ]
|
Proposal of Multi-failure processing for ODUsmp
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2014-03-09 |
|
[ 528 ]
|
Proposal of APS signalling transmitting pattern for ODUsmp
|
ZTE Corporation
|
Q9/15
|
2014-03-09 |
|
[ 499 ]
|
ODU SMP Lower Order 1-stage signalling
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2014-03-07 |
|
[ 497 ]
|
ODU SMP Proposal Status
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2014-03-07 |
|
[ 457 ]
(Rev.1) |
Proposal to finalize work on a revision to Recommendation G.8131
|
Korea (Rep. of)
|
Q9/15
|
2014-03-05 |
|
[ 441 ]
(Rev.1-3) |
Proposed draft text for G.8131
|
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-02-17 |
|
[ 430 ]
|
Proposed text for draft G.MDSP based on existing OTN material
|
Alcatel-Lucent Deutschland AG
|
Q9/15
|
2013-06-18 |
|
[ 429 ]
|
Considerations regarding G.MDSP
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15
|
2013-06-18 |
|
[ 427 ]
|
Comments on circulated draft version of G.808.2
|
Alcatel-Lucent Deutschland AG
|
Q9/15
|
2013-06-18 |
|
[ 426 ]
|
Proposed enhancement of G.873.2
|
Alcatel-Lucent Deutschland AG
|
Q9/15
|
2013-06-18 |
|
[ 422 ]
(Rev.1) |
MAC DA setting for Ethernet OAM frames
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15, Q10/15
|
2013-06-18 |
|
[ 418 ]
|
Discussion and proposal on progress in MPLS-TP linear protection
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15
|
2013-06-18 |
|
[ 417 ]
|
Proposed text for G.mdsp
|
Alcatel-Lucent Italia S.p.A.
,
Telecom Italia S.p.A.
|
Q9/15
|
2013-06-18 |
|
[ 395 ]
|
Support for Ethernet linear protection solutions applicable to DNI scenarios
|
Telecom Italia S.p.A.
|
Q9/15
|
2013-06-18 |
|
[ 394 ]
|
Selection of protection transport entities in m1 SMP architecture
|
FiberHome Technologies Group
|
Q9/15
|
2013-06-18 |
|
[ 393 ]
|
Editorial suggestions for G.8131.1
|
FiberHome Technologies Group
|
Q9/15
|
2013-06-18 |
|
[ 392 ]
|
G.mdsp proposed new network objectives
|
Telecom Italia S.p.A.
|
Q9/15
|
2013-06-18 |
|
[ 390 ]
|
Definition for Broadcast Bridge in G.8131.1
|
FiberHome Technologies Group
|
Q9/15
|
2013-06-18 |
|
[ 388 ]
(Rev.1) |
Forwarding behaviour for OAM frames at MIPs in G.8021
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-18 |
|
[ 387 ]
|
Validating assumptions made in the context of MECP
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-18 |
|
[ 383 ]
|
Proposal to cross-connection release signal of 2-stage ODU SMP protocol
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 370 ]
|
Utilizing G.8031 APS protocol for per-leaf protection in MECP
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 369 ]
|
Propose to modify network objectives for G.mdsp
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 356 ]
|
Modification of pre-emption principles in G.808.3
|
FiberHome Technologies Group
|
Q9/15
|
2013-06-18 |
|
[ 354 ]
|
some editorial suggestions for G.808.3
|
FiberHome Technologies Group
|
Q9/15
|
2013-06-18 |
|
[ 353 ]
|
proposal text about network objective of configuration inconsistance in G.808.3
|
FiberHome Technologies Group
|
Q9/15
|
2013-06-18 |
|
[ 351 ]
|
priority consideration for preemption in G.808.3
|
FiberHome Technologies Group
|
Q9/15
|
2013-06-18 |
|
[ 350 ]
|
Considerations in 2-stage ODU SMP protocol
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 347 ]
|
MECP per-tree protection - simultaneous condition
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 346 ]
|
MECP per-tree protection - operator's command initiated protection
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 342 ]
|
Proposal for generic state machine description in G.808.1
|
Hitachi, Ltd.
,
NEC
|
Q9/15
|
2013-06-18 |
|
[ 288 ]
(Rev.1) |
Proposed correction of MAC DA specification in G.8013
|
NEC Corporation
|
Q9/15, Q10/15
|
2013-06-17 |
|
[ 287 ]
(Rev.1) |
Comments on the scope and some definitions of G.808.2
|
NEC Corporation
|
Q9/15
|
2013-06-17 |
|
[ 271 ]
|
ODU SMP Signalling Options
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-17 |
|
[ 269 ]
|
Availability/Outage times for ODUSMP
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-17 |
|
[ 257 ]
|
Proposed text for removed G.8032 appendices (for agreement)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15
|
2013-06-17 |
|
[ 236 ]
|
Proposed text in G.MDSP
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2013-06-17 |
|
[ 235 ]
|
APS Behavior in 1-stage ODU SMP Proposal
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2013-06-17 |
|
[ 234 ]
|
Discussion about Single Failure and its Potential Affect in ODU SMP
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2013-06-17 |
|
[ 229 ]
|
Analysis of Supporting External Commands in ODU SMP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2013-06-17 |
|
[ 223 ]
|
Answers to B100G questions from Q11/15 rapporteur (TD22/GEN)
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2013-06-17 |
|
[ 213 ]
|
Status update for ODU SMP
|
ZTE Corporation
|
Q9/15
|
2013-06-17 |
|
[ 208 ]
|
Consideration on optical layer protection
|
China Unicom
,
Fiberhome
,
Nokia Siemens Networks
|
Q9/15
|
2013-06-17 |
|
[ 205 ]
|
Architecture and APS communication for per-leaf protection in MECP
|
Korea (Rep. of)
|
Q9/15
|
2013-06-17 |
|
[ 202 ]
|
MECP per-tree protection - root node initiated protection
|
Korea (Rep. of)
|
Q9/15
|
2013-06-17 |
|
[ 190 ]
(Rev.1) |
Proposed text on multiple failure for G.mdsp
|
Ministry of Industry and Information Technology (MIIT)
|
Q9/15
|
2013-06-17 |
|
[ 156 ]
|
Proposed MPLS-TP Linear protection models for Appendix in G.8121
|
Fujitsu Limited
|
Q9/15, Q10/15
|
2013-06-17 |
|
[ 155 ]
|
Comments on draft G.808.2
|
Fujitsu Limited
|
Q9/15
|
2013-06-17 |
|
[ 154 ]
|
Consideration on the notification of availability for ODU SMP
|
Fujitsu Limited
|
Q9/15
|
2013-06-17 |
|
[ 145 ]
|
ODU SMP Activation Time
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2013-06-16 |
Resultados :222 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):