Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 30 ]
|
Liaison statement on improved geographic distribution and coordination of ITU-T Seminars and Workshops
|
TSAG
|
|
2008-07-23 |
|
[ 29 ]
|
Liaison statement to Study Group 4 - Appointment of a rapporteur on BSS between Study
Group 6 (Working Party 6B) and Study Group 4 (Working Party 4B)
|
WP 6B
|
|
2008-06-23 |
|
[ 28 ]
+Add.1 |
Summary record of Study Group 4 meeting on 17 and 18 April 2008
|
SG 4
|
|
2008-05-16 |
|
[ 27 ]
|
Final List of Participants (Geneva, 17-18 April 2008)
|
Director, BR
|
|
2008-04-18 |
|
[ 26 ]
|
Inter-working of Study Group 4 with other ITU-R Study Groups
|
Chairman, SG 4
|
|
2008-04-18 |
|
[ 25 ]
|
List of documents issued
|
BR Study Group Department
|
|
2008-04-16 |
|
[ 24 ]
|
Executive Report of the twenty third and twenty fourth meetings of Working Party 4B
|
Interim Chairman, WP 4B
|
|
2008-04-16 |
|
[ 23 ]
|
Executive report of the first meeting of Working Party 4C
|
Interim Chairman, WP 4C
|
|
2008-04-16 |
|
[ 22 ]
|
Executive Report of Working Party 4A activities since September 2006
|
Interim Chairman, WP 4A
|
|
2008-04-16 |
|
[ 21 ]
|
Applicability of Recommendation ITU-R S.1432 to the meteorological satellite service in the frequency bands 18.1-18.4 GHz in Regions 1 and 3 and 18.0-18.3 GHz in Region 2
|
Chairman, SG 7
|
|
2008-04-16 |
|
[ 20 ]
|
Proposed liaison statement to relevant Working Parties of Study Group 5 - Methodology for determining whether a transmit IMT station meets the PFD limit in provisions of the radio regulations
|
WP 4A
|
|
2008-04-16 |
|
[ 19 ]
|
Draft new Question ITU-R [HYBRID]/4 - System architecture and performance aspects on [hybrid] satellite and terrestrial systems
|
WP 4B
|
|
2008-04-15 |
|
[ 18 ]
|
Draft new Question ITU-R [INTGR]/4 - System architecture, performance and service attributes relating to integrated mobile-satellite and ground component systems operating within the mobile-satellite service, including systems intended for Next Generation Networks
|
WP 4B
|
|
2008-04-15 |
|
[ 17 ]
|
Liaison statement to Study Group 4 - Proposed scopes for Recommendations under the joint responsibility of Study Groups 4 and 5
|
SG 5
|
|
2008-04-15 |
|
[ 16 ]
(Rev.1) |
Draft new Recommendation ITU-R S.[Availability] - Availability objectives for hypothetical reference digital paths in the fixed-satellite service operating below 15 GHz
|
WP 4B
|
|
2008-04-15 |
|
[ 15 ]
|
Draft new Question ITU-R [GSO]/4 - Technical methods for improving the shared use of the geostationary-satellite orbit
|
WP 4A
|
|
2008-04-15 |
|
[ 14 ]
|
Proposed suppression of 3 Study Group 4 Questions
|
Interim Chairman, WP 4A
|
|
2008-04-15 |
|
[ 13 ]
|
Assignments of Questions to the Working Parties of Radiocommunication Study Group 4
|
France
|
|
2008-04-04 |
|
[ 12 ]
|
Candidacy for the chairmanship of Working Party 4C
|
France
|
|
2008-04-02 |
|
[ 11 ]
|
Spectrum sharing and interference management in bands allocated to the broadcasting-satellite service (BSS)
|
North American Broadcasters Association
|
|
2008-03-31 |
|
[ 10 ]
|
Future updating of the ITU-R Recommendations developed by the former Working Parties 8D and 8F
|
Chairmen, SGs 4 and 5
|
|
2008-03-20 |
|
[ 9 ]
|
Organization of the Working Parties of Radiocommunication Study Group 4 - Satellite services
|
France
|
|
2008-03-19 |
|
[ 8 ]
(Rev.1) |
Provisional attribution of the Study Group 4 texts to the Working Parties
|
Chairman, SG 4
|
|
2008-03-17 |
|
[ 7 ]
(Rev.1) |
WRC-07 Resolutions and Recommendations related to the work of Study Group 4
|
Chairman, SG 4
|
|
2008-03-14 |
|
[ 6 ]
|
Liaison statement to Study Group 4 and the Special Committee on Regulatory and Procedural Matters on Resolution 80 (Rev.WRC-07)
|
Director, Radiocommunication Bureau
|
|
2008-03-14 |
|
[ 5 ]
|
Future of the ICG-SAT
|
Chairman, RAG
|
|
2008-03-14 |
|
[ 4 ]
|
Information on the interim structure of Study Group 4 - Satellite services
|
Chairman, SG 4
|
|
2008-03-11 |
|
[ 3 ]
|
Liaison statement to Study Group 4 - Results of the Study Group 5 Meeting (18-19 February 2008)
|
SG 5
|
|
2008-02-27 |
|
[ 2 ]
|
Liaison statement to Study Groups 4 and 7 (WPs 4A, 4C, 7B and 7D) - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 5C
|
|
2008-02-18 |
|
[ 1 ]
(Rev.1-2) +Add.1-2 |
Questions assigned to Radiocommunication Study Group 4
|
SG 4
|
|
2008-02-01 |
Results:205 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5
-
|
Multiple Document Download: Formats and Languages to be included (when available):