Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 428 ]
|
Proposal for revision of Recommendations ITU-R F.747 Radio-frequency channel arrangements for Radio-relay systems operating in the 10 GHz band and of Recommendation ITU-R F.746-9 Radio-frequency arrangements for fixes service systems
|
Italy
|
|
2010-10-29 |
|
[ 427 ]
|
Proposal for revision of Recommendation ITU-R F.595-9 - Radio-frequency channel arrangements for fixed wireless systems operating in the 18 GHz frequency band
|
Italy
|
|
2010-10-29 |
|
[ 426 ]
|
Proposal for revision of Recommendation ITU-R F.387-11 - Radio-frequency channel arrangements for fixed wireless systems operating in the 11 GHz band
|
Italy
,
Slovenia (Republic of)
,
France
,
Switzerland (Confederation of)
|
|
2010-10-29 |
|
[ 425 ]
|
Proposal for revision of Recommendation ITU-R F.384-10 - Radio-frequency channel arrangements for medium- and high-capacity digital fixed wireless systems operating in the upper 6 GHz ( 6 425-7 125 MHz) band
|
Italy
|
|
2010-10-29 |
|
[ 424 ]
|
Proposal for revision of Recommendations: ITU-R F.1520-2 Radio-frequency arrangements for systems in the fixed service operating in the band 31.8-33.4 GHz and ITU-R F.749-2 Radio-frequency arrangements for systems of the fixed service operating in the 38 GHz band
|
Italy
,
Switzerland (Confederation of)
,
France
,
Slovenia (Republic of)
|
|
2010-10-29 |
|
[ 423 ]
|
Proposal for revision of Recommendation ITU-R F.637-3 - Radio frequency channel arrangements for fixed wireless systems operating in the 33 GHz band
|
Italy
|
|
2010-10-29 |
|
[ 422 ]
|
Liaison statement to Working Party 5C - Coexistence studies in relation to Resolution 224 and Question ITU-R 229/5
|
WP 5D
|
|
2010-11-01 |
|
[ 421 ]
|
Proposal for modification of draft new Recommendation ITU-R F.[HAPS CHAR] - Technical and operational characteristics of gateqay links in the fixed service using high altitude platform astations in the band 5 850-7 075 MHz to be use in hsaring studies
|
Russian Federation
|
|
2010-10-29 |
|
[ 420 ]
|
Draft modification of working document toward a preliminary draft new Recommendation ITU-R F.[92-95 GHz]
|
Russian Federation
|
247/5
|
2010-10-28 |
|
[ 419 ]
|
Results of interference assessment of HAPS gateway links into the EESS (passive) and Radioastronomy operating in some part of frequency band 5 850-7 075 MHz
|
Russian Federation
|
|
2010-10-28 |
|
[ 418 ]
|
Proposal for modification on working document towards a draft new Handbook ITU-R F.[CROSS-BORDER]
|
Russian Federation
|
|
2010-10-28 |
|
[ 417 ]
|
Preliminary draft new Recommendation ITU-R F.[HAPS MODELLING] - Interference analysis modelling for sharing between HAPS gateway links in the fixed service and other systems/services allocated in the range 5 850-7 075 MHz
|
Korea (Republic of)
|
|
2010-10-28 |
|
[ 416 ]
|
Proposal for a working document toward a preliminary draft new Report - Spectrum usage for electronic news gathering applications in the fixed and mobile services
|
Australia
|
|
2010-10-29 |
|
[ 415 ]
|
Proposal for a preliminary draft new Report potential worldwide/regionally harmonised tuning ranges for ENG
|
Australia
|
|
2010-10-29 |
|
[ 414 ]
|
Amendments to the working document towards a preliminary draft new Recommendation ITU-R F.[HAPS MODELLING] - Interference analysis modeling for sharing between HAPS gateway links and existing services in the range 5 850-7 075 MHz
|
United States of America
|
|
2010-10-21 |
|
[ 413 ]
|
Modifications to the working document towards a draft new Report on the impact of Software Defined Radio (SDR) and Cognitive Radio Systems (CRS) on the fixed service
|
United States of America
|
|
2010-10-21 |
|
[ 412 ]
|
Amendments to the draft revision of Recommendation ITU-R F.758-4
|
United States of America
|
|
2010-10-21 |
|
[ 411 ]
|
Preliminary draft new Recommendation ITU-R F.[HAPS GATEWAY] - Evaluation of interference from high altitude platform gateway links to fixed wireless systems in the range 5 850-7 025 MHz
|
United States of America
|
|
2010-10-21 |
|
[ 410 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 3L, 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15)
|
WP 7D
|
|
2010-10-15 |
|
[ 409 ]
|
Reply to liaison statement from Wroking Party 5C - Radio noise in the HF frequency band
|
WP 1C
|
214-3/3
|
2010-10-14 |
|
[ 408 ]
|
Proposed review of Recommendation ITU-R BT.1871 - User requirements for wireless microphones
|
Australia
|
121/6
|
2010-10-12 |
|
[ 407 ]
|
The study results of Joint Task Group 5-6 and the related work under Resolution 224 (Rev. WRC-07)
|
Chairman, SG 5
|
|
2010-10-05 |
|
[ 406 ]
|
Liaison statement to Working Parties 3J, 3M (copy to Working Party 5C for information) - Propagation basis for the determination of long-term interference
|
WP 4A
|
|
2010-07-26 |
|
[ 405 ]
|
Liaison statement to Working Party 5C - Statistical methodology for assessing the interference of the satellite services on an fixed service deployment
|
WP 4A
|
|
2010-07-26 |
|
[ 404 ]
|
Liaison statement to Working Party 5C- Preliminary draft revision of Recommendation ITU-R SF.675-3 "Calculation of the maximum power density (averaged over 4 kHz) of an angle modulated carrier"
|
WP 4A
|
|
2010-07-26 |
|
[ 403 ]
|
Liaison statement to Working Party 5C - Review of certain SF-series Recommendations
|
WP 4A
|
|
2010-07-26 |
|
[ 402 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and interested Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment
|
WP 1A
|
|
2010-07-22 |
|
[ 401 ]
|
Liaison statement to ITU-R Working Parties 4C, 5A, 5B, 5C, 6A and 7D (copy to ITU-R Working Party 3L and to ITU-T Study Groups 5 and 15 for information and/or action if any) - Developments on PLT systems
|
WP 1A
|
|
2010-07-16 |
|
[ 400 ]
|
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7B, 7C and 7D - Information on studies related to WRC-12 Agenda item 1.25
|
WP 4C
|
|
2010-07-13 |
|
[ 399 ]
|
Liaison statement to Working Party 5C - Regarding studies under Question ITU-R 232-1/7
|
WP 7C
|
|
2010-07-02 |
|
[ 398 ]
|
Additional guidelines for updating the Recommendations listed in Document 5B/465 (copied to Working Parties 5A, 5C and 5D for information)
|
Chairman, SG 5
|
|
2010-07-01 |
|
[ 397 ]
|
Liaison statement to Working Parties 5B, 5C and 3L - Considerations relating to sharing studies and CPM text in support of WRC-12 Agenda item 1.16 (Resolution 671 (WRC-07))
|
WP 7C
|
|
2010-06-30 |
|
[ 396 ]
|
Liaison statement to Working Party 5C (copy to Working Party 7D for information) - Characteristics and applications of fixed wireless systems operating in the 57 GHz to 130 GHz band
|
WP 7C
|
|
2010-06-29 |
|
[ 395 ]
|
Liaison statement to Working Party 5C - Sharing analysis between non-GSO meteorological satellite systems operating in the space-to-Earth direction and fixed service systems in the band 7 850-7 900 MHz (WRC-12 Agenda item 1.24)
|
WP 7B
|
|
2010-06-21 |
|
[ 394 ]
|
Liaison statement to Study Group 5 and Working Party 5C on Report ITU-R F.2107 - Characteristics and applications of fixed wireless systems operating in the 57 GHz to 130 GHz band
|
WP 7D
|
|
2010-06-18 |
|
[ 393 ]
|
Liaison statement to the Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15) - Further work on power line telecomunications
|
WP 7D
|
221-1/1
|
2010-06-17 |
|
[ 392 ]
|
Review of the Study Group 5 Questions assigned to the Working Parties
|
Chairman, SG 5
|
|
2010-05-31 |
|
[ 391 ]
|
Draft IMO position on WRC-12 Agenda items concerning matters relating to maritime services
|
International Maritime Organization
|
|
2010-05-20 |
|
[ 390 ]
+Ann.2-18 |
Report of the fifth meeting of Working Party 5C (Geneva, 10 - 20 May 2010)
|
Chairman, WP 5C
|
|
2010-05-20 |
|
[ 389 ]
|
Final List of Participants - Working Party 5C (Geneva, 10-20 May 2010)
|
Director, BR
|
|
2010-05-20 |
|
[ 388 ]
|
Liaison statement to ITU-R Working Party 5C and external organizations on "Multiple gigabit wireless systems in frequencies around 60 GHz"
|
WP 5A
|
|
2010-05-17 |
|
[ 387 ]
|
Liaison statement to ITU-R Working Party 5B (copy to Working Party 5C) - Proposed response to Working Party 1A on PLT systems
|
WP 5A
|
|
2010-05-17 |
|
[ 386 ]
|
Liaison statement to Working Party 5C - Common activities of both Working Parties on developing preliminary draft new ITU-R Handbook on cross-border negotiations for terrestrial services
|
WP 5A
|
|
2010-05-14 |
|
[ 385 ]
|
Liaison statement to Working Party 5C - Interference modelling between HAPS gateway links and intelligent transportation systems and fixed wireless access systems in the 5 850-7 075 MHz band
|
WP 5A
|
|
2010-05-14 |
|
[ 384 ]
|
Reply liaison statement to Working Party 5C on harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 5A
|
|
2010-05-14 |
|
[ 383 ]
|
Reply liaison statement to ITU-R Working Party 5C - Harmonization of spectrum for use by terrestrial electronic news gathering systems - WRC-12 Agenda item 1.5
|
WP 5B
|
|
2010-05-13 |
|
[ 382 ]
|
Reply liaison statement to ITU-R Working Party 5C - Progress of work on WRC-12 Agenda item 1.20
|
WP 5B
|
|
2010-05-13 |
|
[ 381 ]
|
List of documents issued
|
BR Study Group Department
|
|
2010-05-07 |
|
[ 380 ]
|
Proposed modifications to the working document towards draft text for CPM Report
|
United Arab Emirates
|
|
2010-05-03 |
|
[ 379 ]
|
Liaison statement to Working Party 1A (copy to relevant Working Parties of Study Groups 4, 5, 6, 7 and copy to ITU-T Study Groups 9 and 15 for information) - Further work on power line telecommunications
|
WP 6A
|
|
2010-05-05 |
Results:603 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):