Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 410 ]
|
G.fast: OLR procedures during G.fast initialization
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 409 ]
|
PTP attributes values in G.8275.1
|
Orange
|
Q13/15
|
2013-06-18 |
|
[ 408 ]
|
Text for Annex A of G.8275.1
|
Orange
|
Q13/15
|
2013-06-18 |
|
[ 407 ]
|
Phase/time network limits in G.8271.1
|
Orange
|
Q13/15
|
2013-06-18 |
|
[ 406 ]
|
G.fast: DRA primitives and interface requirements at the gamma reference point
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 405 ]
|
G.fast: Energy Efficiency-performance trade-offs
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 404 ]
|
G.fast: Vectoring Backchannel Encapsulation
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 403 ]
|
Requirements for passive Metro DWDM interfaces
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2013-06-18 |
|
[ 402 ]
|
Requirements for Beyond 100G OTN
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q11/15
|
2013-06-18 |
|
[ 401 ]
|
Application scenarios using new Metro DWDM interfaces
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2013-06-18 |
|
[ 400 ]
|
The difference of the trib and line side between the existing OTN and B100G OTN
|
FiberHome Technologies Group
|
Q11/15
|
2013-06-18 |
|
[ 399 ]
|
The requirement of optical overhead extend at IrDI
|
China Unicom
,
FiberHome Technologies Group
|
Q11/15
|
2013-06-18 |
|
[ 398 ]
|
G.fast: On Line Reconfiguration for Precoder Gain Scaling: working text figures
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 397 ]
|
The discussion about OTM- n.m IaDI interface of B100G
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
|
Q11/15
|
2013-06-18 |
|
[ 396 ]
|
The suggestion about OTM-0.mvn IrDI interface of B100G
|
China Mobile Communications Corporation
,
China Mobile Communications Corporation
|
Q11/15
|
2013-06-18 |
|
[ 395 ]
|
Support for Ethernet linear protection solutions applicable to DNI scenarios
|
Telecom Italia S.p.A.
|
Q9/15
|
2013-06-18 |
|
[ 394 ]
|
Selection of protection transport entities in m1 SMP architecture
|
FiberHome Technologies Group
|
Q9/15
|
2013-06-18 |
|
[ 393 ]
|
Editorial suggestions for G.8131.1
|
FiberHome Technologies Group
|
Q9/15
|
2013-06-18 |
|
[ 392 ]
|
G.mdsp proposed new network objectives
|
Telecom Italia S.p.A.
|
Q9/15
|
2013-06-18 |
|
[ 391 ]
|
Version of ring APS PDUs in Y.1731 and editorial comments on Y.1731
|
Alcatel-Lucent USA Inc.
|
Q10/15
|
2013-06-18 |
|
[ 390 ]
|
Definition for Broadcast Bridge in G.8131.1
|
FiberHome Technologies Group
|
Q9/15
|
2013-06-18 |
|
[ 389 ]
(Rev.1) |
Use cases for transport SDN
|
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2013-06-18 |
|
[ 388 ]
(Rev.1) |
Forwarding behaviour for OAM frames at MIPs in G.8021
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-18 |
|
[ 387 ]
|
Validating assumptions made in the context of MECP
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2013-06-18 |
|
[ 386 ]
|
Mapping specification of single channel OTU3 and OTU4 using coherent techniques
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2013-06-18 |
|
[ 385 ]
|
Strong FEC for OTU4 and Beyond 100G
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2013-06-18 |
|
[ 384 ]
(Rev.1) |
Type B PON Dual Parenting Restoration Solution
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2013-06-18 |
|
[ 383 ]
|
Proposal to cross-connection release signal of 2-stage ODU SMP protocol
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 382 ]
|
FPP metric informal correspondence - Summary, further results and proposal for Study Point 3
|
Calnex Solutions Limited
,
RAD Data Communications, Ltd.
|
Q13/15
|
2013-06-18 |
|
[ 381 ]
|
FPP metric informal correspondence - Summary and proposal for Study Point 1
|
Calnex Solutions Limited
,
RAD Data Communications, Ltd.
|
Q13/15
|
2013-06-18 |
|
[ 380 ]
|
FPP metric informal correspondence - Summary and proposal on the Agreements
|
Calnex Solutions Limited
,
RAD Data Communications, Ltd.
|
Q13/15
|
2013-06-18 |
|
[ 379 ]
|
Comments to Finisar proposal for a new 100G code 4L1-9D1F in G.959.1
|
Alcatel-Lucent Deutschland AG
|
Q6/15
|
2013-06-18 |
|
[ 378 ]
|
G.fast: Alternative samples report by FTU-R for downstream crosstalk estimation
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-18 |
|
[ 377 ]
|
Requirements for passive metro WDM systems
|
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q6/15
|
2013-06-18 |
|
[ 376 ]
|
A.5 justification information for the new proposed ITU-T Recommendation referencing IEEE 1905.1
|
Sigma Designs Israel S.D.I Ltd.
|
Q18/15
|
2013-06-18 |
|
[ 375 ]
|
G.vdsl2, G.inp: Considerations related to VDSL2 low power mode
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 374 ]
|
G.wnb: Editorial changes to SAR adaptation layer of G.9959
|
Sigma Designs Israel S.D.I Ltd.
|
Q15/15
|
2013-06-18 |
|
[ 373 ]
|
G.993.5: Initialization using extended O-P-VECTOR 1
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 372 ]
|
G.wnb: Editorial changes to Logical Link Layer (LLC) of G.9959
|
Sigma Designs Israel S.D.I Ltd.
|
Q15/15
|
2013-06-18 |
|
[ 371 ]
|
G.wnb: PHY: Relaxation of tolerance on TX separation
|
Sigma Designs Israel S.D.I Ltd.
|
Q15/15
|
2013-06-18 |
|
[ 370 ]
|
Utilizing G.8031 APS protocol for per-leaf protection in MECP
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 369 ]
|
Propose to modify network objectives for G.mdsp
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 368 ]
|
Proposal for a new Recommendation for "Convergent Digital Home Network for Heterogeneous Technologies"
Withdrawn
|
Sigma Designs Israel S.D.I Ltd.
,
TangoTec
|
Q18/15
|
2013-06-18 |
|
[ 367 ]
|
G.hn: Proposal for an amendment to G.9961 to facilitate metrics acquisition between G.hn nodes
|
Sigma Designs Israel S.D.I Ltd.
|
Q18/15
|
2013-06-18 |
|
[ 366 ]
|
G.hn: IPR Statement of Sigma Designs Israel
|
Sigma Designs Israel S.D.I Ltd.
|
Q18/15
|
2013-06-18 |
|
[ 365 ]
|
Propose to add 1dB and 3dB passband width parameters in G.680
|
China Unicom
,
FiberHome Technologies Group
|
Q6/15
|
2013-06-18 |
|
[ 364 ]
|
Proposal for G.epon specific managed entities
|
Mitsubishi Electric Corporation
,
OKI Electric Industry Company Ltd. (OKI)
|
Q2/15
|
2013-06-18 |
|
[ 363 ]
|
Requirement to clarify terms of the ripple and the passband width in G.680
|
China Unicom
,
FiberHome Technologies Group
|
Q6/15
|
2013-06-18 |
|
[ 362 ]
(Rev.1) |
10 Gbit/s signal transmission at 50 GHz channel spacing in seeded DWDM system
|
Ericsson-LG
|
Q6/15
|
2013-06-18 |
|
[ 361 ]
|
Complementary data for reroute detection mechanisms
|
ADVA Optical Networking
|
Q13/15
|
2013-06-18 |
Resultados :2210 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):