Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 67 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 7C, 7D and 8D on agenda item 1.8.2
|
TG 1/7
|
|
2002-02-11 |
|
[ 66 ]
(Rev.1) |
Liaison Statement to WPs 9D and 7C on Agenda Item 1.8.2
|
TG 1/7
|
|
2002-02-11 |
|
[ 65 ]
(Rev.1) |
Additional analysis of potential interference between a narrowband spaceborne SAR and Fixed Wireless Access (FWA) systems in the band 5 250-5 350 MHz
|
USA
|
|
2002-02-11 |
|
[ 64 ]
(Rev.1) |
Technical characteristics and performance and interference criteria of a spaceborne precipitation radar at 35.5-36.0 GHz
|
USA
|
|
2002-02-11 |
|
[ 63 ]
(Rev.1) |
Preliminary draft revision to Recommendation ITU-R SA.1260 - Feasibility of sharing between active spaceborne sensors and other services in the vicinity of 420-470 MHz
|
USA
|
|
2002-02-11 |
|
[ 62 ]
(Rev.1) |
Preliminary draft Revision of ITU-R Recommendation SA.1264- Frequency sharing between the meteorological aids service and the mobile satellite services in the 1 675-1 700 MHz band.
|
USA
|
|
2002-02-11 |
|
[ 61 ]
(Rev.1) |
Analysis of potential aggregate interference between spaceborne wideband SARS and wireless high speed radio local area networks (RLANs) in the band 5 250-5 570 MHz
|
USA
|
|
2002-02-11 |
|
[ 60 ]
(Rev.1) |
Liaison statement to Task Group 1/7 - Present status of the compatibility studies between the fixed service using high altitude platform stations and science services including radio astronomy service and Earth .......
|
WP 9D
|
|
2002-02-11 |
|
[ 59 ]
(Rev.1) |
Liaison statement to Task Group 1/7 and Working Party 7C - WRC-03 agenda item 1.8.2
|
WP 9D
|
|
2002-02-11 |
|
[ 58 ]
(Rev.1) |
Liaison Statement to WP 7C - WRC-03 Agenda Item 1.5, Res. 736 (WRC-2000) Resolves 1,2 and 3: sharing between RLANs in the Mobile Service and Fixed Wireless Access in the Fixed Service, with the EES/SR (active) services in the band 5 460-5 570 MHz
|
JRG 8A-9B
|
|
2002-02-11 |
|
[ 57 ]
(Rev.1) |
Liaison statement to WPs 8B and 7C - Sharing between the proposed radiolocation service allocation upgrade and other services in the 5 350-5 650 MHz band
|
JTG 4-7-8-9
|
|
2002-02-11 |
|
[ 56 ]
(Rev.1) |
Liaison statement to Joint Task Group 4-7-8-9 and Working Party 7C - FWA systems parameters proposed to be used in Region 3
|
JRG 8A-9B
|
|
2002-02-11 |
|
[ 55 ]
(Rev.1) |
Liaison statement to Working Party 7C and Joint Rapporteur Group 8A-9B (for information to WP 9D) - Sharing between EES (active) service, RLAN in the mobile service and FWA in the fixed service
|
JTG 4-7-8-9
|
|
2002-02-11 |
|
[ 54 ]
(Rev.1) |
Operational and radio characteristics of the weather radars used in UK which operate in the band 5 600-5 650 MHz currently under the protection of the footnote 802
|
United Kingdom
|
|
2002-02-11 |
|
[ 53 ]
(Rev.1) |
Liaison statement to WP 7C - Sharing between the Earth exploration-satellite (passive) service and the ARNS in the band 4 200-4 400 MHz
|
WP 8B
|
|
2002-02-11 |
|
[ 52 ]
(Rev.1) |
Liaison statement to Working Party 7C - Studies concerning WRC-03 agenda item 1.31
|
WP 8D
|
|
2002-02-11 |
|
[ 51 ]
(Rev.1) |
Liaison statement to Working Parties 7C, 7D, 7E and 9D - Studies concerning WRC-03 agenda item 1.16
|
WP 8D
|
|
2002-02-11 |
|
[ 50 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F and 9B - Proposals for reviewing the definitions of the spectral properties of transmitter emissions
|
SG 1
|
|
2002-02-11 |
|
[ 49 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 6S, 7C, 8D and 9D - Concerning the band-by-band study between the earth exploration-satellite service (EESS) and other services
|
SG 1
|
|
2002-02-11 |
|
[ 48 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 6E, 6S, 7C, 7D, 8A, 8B, 8D, 8F, 9B, 9C and 9D - Rapporteur's Group on WRC-03 agenda item 1.8.1
|
SG 1
|
|
2002-02-11 |
|
[ 47 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 6S, 7C, 7D, 8B, 8D and 9D - Task Group on WRC-03 Agenda item 1.8.2 concerning the protection of passive services bands from unwanted emissions
|
SG 1
|
|
2002-02-11 |
|
[ 46 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 4B, 6E, 6S, 7C, 7D, 8A, 8B, 8D, 8F, 9B, 9C, and 9D - Four Draft Recommendations on unwanted emissions and new definitions
|
SG 1
|
|
2002-02-11 |
|
[ 45 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 6S, 7C, 7D, and 8D - Concerning a Working Document towards a methodology for the interference analysis between transmitters and the passive service operating in different bands
|
SG 1
|
|
2002-02-11 |
|
[ 44 ]
(Rev.1) |
Liaison statement to Working Party 7C - Sharing between spaceborne passive sensors and other services in the 36-37 GHz band
|
WP 8A
|
|
2002-02-11 |
|
[ 43 ]
(Rev.1) |
Liaison statement to WPs 9B, 9D, 7C and 7E - Impact of HAPS interference to EESS (passive) operations in the 31.3-31.8 GHz band
|
WP 4-9S
|
|
2002-02-11 |
|
[ 42 ]
(Rev.1) |
Liaison statement to Working Party 7C and Joint Task Group 4-7-8-9 - Information for conducting sharing studies in frequency bands between 5 250 and 5 850 MHz
|
WP 8B
|
|
2002-02-11 |
|
[ 41 ]
(Rev.1) |
Liaison statement to Working Parties 1A, 1B, 7C, 8D and 8F and JTG 4-7-8-9 - Radar Correspondence Group
|
WP 8B
|
|
2002-02-11 |
|
[ 40 ]
(Rev.1) |
Liaison statement to WP 7C - Interference analysis from high altitude platform stations to passive sensors in the bands 31.3-31.8 GHz
|
WP 9B
|
|
2002-02-11 |
|
[ 39 ]
(Rev.1) |
[7C/39, 7E/9] Liaison statement to WPs 7C and 7E - Studies related to WRC-03 agenda item 1.38 EESS (active) and existing services in the band 420-470 MHz
|
WP 8A
|
|
2002-02-11 |
|
[ 38 ]
(Rev.1) |
Liaison statement from Working Party 7C to Task Group 1/5, and Working Parties 7C and 7D concerning the band-by-band study
|
WP 4A
|
|
2002-02-11 |
|
[ 37 ]
(Rev.1) |
Liaison statement to Working Party 7C - Sharing between space borne passive sensors and the fixed service operating near 118 GHz and 183 GHz
|
WP 9D
|
|
2002-02-11 |
|
[ 36 ]
(Rev.1) |
Liaison statement to Working Party 7C
|
WP 9D
|
|
2002-02-11 |
|
[ 35 ]
(Rev.1) |
Liaison statement to Working Party 7C - Typical parameters concerning fixed service that may use the band 36-37 GHz
|
WP 9D
|
|
2002-02-11 |
|
[ 34 ]
(Rev.1) |
Liaison statement to Working Parties 8B and 7C - Sharing between the proposed radiolocation service allocation upgrade and other services in the 5 350-5 650 MHz band
|
JTG 4-7-8-9
|
|
2002-02-11 |
|
[ 33 ]
(Rev.1) |
Liaison statement to Working Party 8B (for information to Working Party 7C and JRG 8A-9B) - Preliminary draft CPM text related to Resolves 3 of WRC-2000 Resolution 736, WRC-03 Agenda item 1.5
|
JTG 4-7-8-9
|
|
2002-02-11 |
|
[ 32 ]
(Rev.1) |
Report to Working Party 7C on its meeting (31 July-4 August 2000) with a view to its next meeting (9-17 May 2001)
|
Chairman, WP 7C
|
|
2002-02-11 |
|
[ 31 ]
(Rev.1) |
List of participants (Richmond, 31 July - 4 August 2000)
|
BRSGD
|
|
2002-02-11 |
|
[ 30 ]
(Rev.1) |
List of documents issued
|
BRSGD
|
|
2002-02-11 |
|
[ 29 ]
(Rev.1) |
Sharing in the band 5 250-5 350 MHz between the earth exploration-satellite service (active) allocated in this band and the radio local area networks (RLANs)
|
Rapporteur 8A-9B
|
|
2002-02-11 |
|
[ 28 ]
(Rev.1) |
Out-of-band emission masks for Earth exploration-satellite service (active) sensors
|
USA
|
|
2002-02-11 |
|
[ 27 ]
(Rev.1) |
Concerning a preliminary draft new Recommendation on the protection of the Earth exploration-satellite (passive) service from out-of-band emissions
|
USA
|
|
2002-02-11 |
|
[ 26 ]
(Rev.1) |
Concerning a preliminary draft new Recommendation on the protection of passive services from unwanted emissions
|
USA
|
|
2002-02-11 |
|
[ 25 ]
(Rev.1) |
Analysis of potential interference between spaceborne SARS and fixed wireless access (FWA) systems in the band 5 250-5 350 MHz
|
USA
|
|
2002-02-11 |
|
[ 24 ]
(Rev.1) |
Analysis of potential interference between spaceborne SARS and U-NII devices around 5.3 GHz
|
USA
|
|
2002-02-11 |
|
[ 23 ]
(Rev.1) |
Preliminary draft revision of Rec. ITU-R SA.1165-1 - Technical characteristics and performance criteria for radiosonde systems in the Meteorological Aids Service
|
WP 7C
|
|
2002-02-11 |
|
[ 22 ]
(Rev.1) |
A proposal for an SRS, SOS, and EESS OOB emission mask in response to TG 1/5 liaison statements
|
USA
|
|
2002-02-11 |
|
[ 21 ]
(Rev.1) |
Sharing between spaceborne passive sensors and aeronautical radionavigation service (airborne altimeters) in the 4200-4400 MHz band
|
USA
|
|
2002-02-11 |
|
[ 20 ]
(Rev.1) |
Protection of passive services from unwanted emissions - WRC-03 - Agenda Item 1.8.2 and Recommendation 66 (Rev. WRC-2000)
|
WMO
|
|
2002-02-11 |
|
[ 19 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[PMP26GHZ] - Technical and operational requirements that facilitate sharing between point-to-multipoint systems in the fixed service and the inter-satellite service in the band 25.25-27.5 GHz
|
WP 7D & 9D
|
|
2002-02-11 |
|
[ 18 ]
(Rev.1) |
Proposal for out-of-band emission mask for space services
|
EUMETSAT
|
|
2002-02-11 |
Results:267 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):