Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 19 ]
|
Proposed preliminary draft new Recommendation [HAPS-EESS] - Methodology for the impact evaluation of uplink transmission in the fixed service using high altitude platform stations (HAPS) in the Earth exploration-satellite service (EESS)..
|
Japan
|
|
2001-10-01 |
|
[ 18 ]
|
Proposed preliminary draft new Recommendation [HAPS-IB] - Methodology for impact evaluation and operational procedure of the fixed service using high altitude platform stations (HAPS) for frequency sharing with other co-primary ...
|
Japan
|
|
2001-10-01 |
|
[ 17 ]
|
Proposed preliminary draft new Recommendation [HAPS-MT] - Interference mitigation techniques and their advantages for systems using high altitude platform station (HAPS) in the frequency range 18-32 GHz
|
Japan
|
|
2001-10-01 |
|
[ 16 ]
|
Proposed preliminary draft new Recommendation [KA-HAPS] - Technical and operational characteristics for the fixed service using high-altitude platform stations in the bands 27.5-28.35 GHz and 31.0-31.3 GHz
|
Japan
|
|
2001-10-01 |
|
[ 15 ]
|
Proposal for a Recommendation on a frequency channel arrangement for digital radio-relay systems operating in the frequency band 406.1 to 450 MHz
|
Brazil (Federative Republic of)
|
|
2001-10-01 |
|
[ 14 ]
|
Consideration of deployment scenarios of IMT-2000 networks
|
Germany (Federal Republic of)
|
|
2001-10-01 |
|
[ 13 ]
|
Consideration on future status of JRG 8A-9B and review of scopes of Working Parties within Study Group 9
|
France
|
|
2001-10-01 |
|
[ 12 ]
|
Questions identified as suitable for approval by the alternative procedure according to Resolution ITU-R 45
|
Chairman, SG 9
|
|
2001-10-01 |
|
[ 11 ]
|
Recommendations to be brought to the attention of Study Group 9 Working Parties
|
Chairman, SG 9
|
|
2001-10-01 |
|
[ 10 ]
+Add.1 |
Consideration on future status of JRG 8A-9B and review of scopes of Working Parties within Study Group 9
|
Chairman, WP 9B
|
|
2001-10-01 |
|
[ 9 ]
|
Questions to be brought to the attention of Study Group 9 Working Parties
|
Chairman, SG 9
|
|
2001-10-01 |
|
[ 8 ]
|
Updating of certain maintained Recommendations in Sections 9B and 9C
|
Chairman, WP 9B
|
|
2001-10-01 |
|
[ 7 ]
|
Liaison statement to WPs 4-9S and 9B - Interference analysis from High Altitude Platform Stations to passive sensors in the band 31.3-31.8 GHz
|
WP 7C
|
|
2001-10-01 |
|
[ 6 ]
+Add.1 |
Additional report to the next Working Party 9B meeting (18-26 September 2000)
|
Chairmen, WPs 4-9S, 9A, 9B, 9C and 9D
|
|
2001-10-01 |
|
[ 5 ]
|
Liaison statement from Working Party 3M to Working Party 9B concerning propagation aspects relating to Resolutions 726 and 133 (WRC-97)
|
WP 3M
|
|
2001-10-01 |
|
[ 4 ]
|
Liaison statement from WP 3M to WP 9B and WP 4-9S Concerning - Rec. ITU-R F.1500 - Preferred characteristics of systems in the fixed service using hihg altitude platform operating in the bands 47.2-47.5 GHz and 47.9-48.2 GHz
|
WP 3M
|
|
2001-10-01 |
|
[ 3 ]
|
Principal Rapporteurs, JRG 8A-9B - Report of the seventh meeting (Geneva, 13-17 March 2000)
|
JRG 8A-9B
|
|
2001-10-01 |
|
[ 2 ]
|
Liaison statement to ITU-T Study Groups 4, 6, 9, 11, 12, 13 and ITU-R Study Groups 4, 8 and 9
|
ITU-T SG 15 (WP 1/15)
|
|
2001-10-01 |
|
[ 1 ]
|
Documents to be carried forward to the next study period (2000-2002)
|
BR Secretariat
|
|
2001-10-01 |
Results:219 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5
|
Multiple Document Download: Formats and Languages to be included (when available):