International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 715 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Parties 5A, 5C, an 7C) - Aeronautical mobile service (AMS) systems technical characteristics in 21.2-2-22 GHz     WP 5B     2018-06-19
[ 714 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MSS in the frequency band 27.5-29.5 GHz     Japan   AI1.5   2018-06-18
[ 713 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz     Japan   AI1.5   2018-06-18
[ 712 ]  
 
Proposed modifications to working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2     Japan   AI9.1   2018-06-18
[ 711 ]  
 
Proposed modifications to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]     Japan   AI9.1   2018-06-18
[ 710 ]  
 
Considerations on the PFD and EPM criteria relating to WRC-19 agenda item 7, issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments     Japan   AI7   2018-06-18
[ 709 ]  
 
Proposed working document towards draft CPM text - WRC-19 agenda item 7, Issue M (Working Party 4A/ Working Party 4C)     Iran (Islamic Republic of)     2018-06-10
[ 708 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - Clarification of HAPS characteristics and studies     WP 5C   AI1.14   2018-06-05
[ 707 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - Information on Adaptive Transmit Power Control (ATPC)     WP 5C   AI1.14   2018-06-05
[ 706 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (copy for information to Working Parties 3M and 5B) - Progress on WRC-19 agenda item 1.14     WP 5C   AI1.14   2018-06-05
[ 705 ]  
 
WRC-19 agenda item 7, issue J - Information about the application of the power flux-density limit specified in section 1 of Annex 1 to RR Appendix 30     Director, BR   AI7   2018-06-05
[ 704 ]  
(Rev.1) 
Liaison statement on work which is under study in ITU-T Q3/5     ITU-T SG 5     2018-06-04
[ 703 ]  
 
Reply liaison statement to ITU-R Working Party 4A (copy for information to Working Party 5C) - Studies relating to the use of the frequency bands 17.7-19.7 GHz (space to Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service under WRC-19 agenda item 1.5     WP 5A   AI1.5   2018-06-01
[ 702 ]  
 
Reply liaison statement to Working Party 4A concerning WRC-19 agenda item 9.1, issue 9.1.9     WP 5C   AI9.1   2018-05-31
[ 701 ]  
 
Liaison statement to Working Parties 4A, 4C, 7B, 7C and 7D - Revision of Recommendation ITU-R F.1245     WP 5C     2018-05-31
[ 700 ]  
 
Reply liaison statement to Working Parties 1A and 4C (copy for information to Working Parties 4A, 5D, 7B, and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WPs, 5A, 5B, 5C     2018-05-31
[ 699 ]  
 
Liaison statement to Working Parties 4A and 4C - Draft documents including draft CPM text related to WRC-19 agenda item 9.1, issue 9.1.4 - Resolution 763 (WRC-15)     WP 5B     2018-05-30
[ 698 ]  
 
Draft CPM text for WRC-19 agenda item 1.4     Spain   AI1.4   2018-05-30
[ 697 ]  
 
Reply liaison statement to ITU-R Working Party 5C (copy for information to Working Parties 3M, 4A, 4C, 5B, 5D, 7B, 7C, 7D and Task Group 5/1) - WRC-19 agenda item 1.14     WP 5A   AI1.14   2018-05-25
[ 696 ]  
 
Liaison statement from ITU-D Study Group 1 Question 1/1 to ITU-R Study Groups 1, 4 and 5 on collaboration     ITU-D SG 1     2018-05-24
[ 695 ]  
 
Liaison statement to Working Party 4A on WRC-19 agenda item 7, issues H and I, for satellite systems operating under EESS, SRS, SOS, ISS, EESS (passive and active) and SRS (active and passive) allocations     WPs 7B and 7C   AI7   2018-05-22
[ 694 ]  
 
Liaison statement to Working Party 4A on non-GSO BIU (WRC-19 agenda item 7, Issue A), for satellite systems, operating under EESS, SRS, SOS, ISS, EESS (passive and active) and SRS (active and passive) allocations     WPs 7B & 7C     2018-05-22
[ 693 ]  
 
Liaison statement to Working Party 4A - Analysis of RFI caused to EESS (passive) in the 18.6-18.8 GHz band     WP 7C     2018-05-22
[ 692 ]  
 
Reply liaison statement to Working Party 4A - WRC-19 agenda items 1.6 and 9.1, Issue 9.1.9     WP 7C   AI9.1, AI1.6   2018-05-22
[ 691 ]  
 
Liaison statement to Working Party 1A (copy to Working Parties 1C, 4A and 4B) - Broadcasting-satellite receiving equipment and harmful interference to EESS (passive) remote sensors     WP 7C     2018-05-22
[ 690 ]  
 
Reply liaison statement to Working Party 4A - Draft CPM text on WRC-19 agenda item 1.6     WP 7D   AI1.6   2018-05-21
[ 689 ]  
 
Reply liaison statement to Working Party 4A - Agenda item 9.1, issue 9.1.9     WP 7D   AI9.1   2018-05-21
[ 688 ]  
 
Reply liaison statement to Working Party 4A - Agenda item 9.1, issue 9.1.9 - Preliminary draft new Report ITU-R S.[SPECTRUM_SHARING]: Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands     WP 7D   AI9.1   2018-05-21
[ 687 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - Status of WRC-19 agenda item 1.7     WP 7B   AI1.7   2018-05-23
[ 686 ]  
(Rev.1) 
Reply liaison statement to Working Party 4A (copy to Working Parties 5B, 5C, 5D, 6A, 7B, 7C for information - Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz adjacent band studies] - Protection of EESS (passive) and RAS systems for non-GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands     WP 7D   AI1.6   2018-05-21
[ 685 ]  
 
Liaison statement from ITU-D Study Group 2 on disaster relief use cases     ITU-D SG 2     2018-05-21
[ 684 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 7B     2018-05-17
[ 683 ]  
 
Proposals regarding WRC-19 agenda item 7, Issue G - Updating the reference situation for Regions 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments     Norway   AI7   2018-05-11
[ 682 ]  
 
Proposals regarding WRC-19 agenda item 7, issues E, F and M - Measures to facilitate new administrations entering into the RR Appendix 30B List     Norway   AI7   2018-05-11
[ 681 ]  
 
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7     WP 6A   AI1.7   2018-05-10
[ 680 ]  
 
Reply liaison statement to ITU-R Working Party 7A on UTC (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding broadcasting systems     WP 6B     2018-05-04
[ 679 ]  
 
Preliminary position on WRC-19 Agenda     World Meteorological Organization     2018-05-03
[ 678 ]  
 
Current status of draft CPM text     Chairman, WP 4A     2018-05-03
[ 677 ]  
 
"Conclusion" section of the draft CPM texts on the 9 issues under WRC-19 agenda item 9.1     Chairman, CPM     2018-04-30
[ 676 ]  
 
Recommendation ITU-R F.699-8 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to 86 GHz     SG 5     2018-03-06
[ 675 ]  
+Ann.1-55 
Report on the meeting of Working Party 4A (Geneva, 20 February - 2 March 2018)     Chairman, WP 4A     2018-03-05
[ 674 ]  
 
Final list of participants - Working Party 4A (Geneva, 20 February - 2 March 2018)     Director, BR     2018-03-02
[ 673 ]  
 
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding FSS/MSS/BSS     WP 4B     2018-02-23
[ 672 ]  
 
List of documents issued (Documents 4A/519 - 4A/672)     BR Study Groups Department     2018-02-20
[ 671 ]  
 
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems     WP 4C     2018-02-20
[ 670 ]  
 
Liaison Statement to Working Party 1A (Copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 4C     2018-02-19
[ 669 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions     WP 4C     2018-02-19
[ 668 ]  
 
Reply liaison statement to Working Party 4A on WRC-19 agenda item 7, issues H and I - Comments related to additional RR Appendix 4 data elements for non-GSO systems as regards RNSS systems     WP 4C   AI7   2018-02-19
[ 667 ]  
 
Reply liaison statement to Working Party 4A on non-GSO BIU (WRC-19 agenda item 7, issue A), as regards RNSS systems - Comments related to non-GSO BIU as regards RNSS systems     WP 4C   AI7   2018-02-19
[ 666 ]  
 
Liaison statement to Working Party 4A - Application of coordination arc in the Ka band under WRC-19 agenda item 7, Issue B     WP 4C   AI7   2018-02-19
Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-18