International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7B  C 

ITU-R WP7B

Space Radiocommunication Applications

Results:416 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 216 ]  
 
Apportionment of aggregate interference criterion for dara relay satellite systems in 26 GHz     Russian Federation     2017-10-17
[ 215 ]  
 
Proposals for the preliminary draft new Report ITU-R SA.[400 MHz-LIMITS]     Russian Federation   AI1.2   2017-10-17
[ 214 ]  
 
Preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - CHARACTERISTICS] - Technical characteristics for telemetry, tracking and command in the space operation service below 1 GHz for non-GSO satellites with short duration missions     Korea (Republic of)   AI1.7   2017-10-17
[ 213 ]  
 
Preliminary draft new Report ITU-R SA.[EESS-METSAT CHAR] - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies     Korea (Republic of)     2017-10-17
[ 212 ]  
 
Draft liaison statement to Working Party 4C - WRC-19 agenda item 1.2     United States of America   AI1.2   2017-10-11
[ 211 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 4C     2017-10-16
[ 210 ]  
 
Reply liaison statement to Task Group 5/1 (copy to WPs 4A, 5B, 7B and 7C for information) - Reply to request for additional information on parameters in support of sharing and compatibility studies with IMT-2020     WP 4C     2017-10-16
[ 209 ]  
 
Proposed new ITU-R SA Recommendation - Use of the 2 200-2 290 MHz band by SRS/EESS/SOS satellites     European Space Agency     2017-10-16
[ 208 ]  
 
Sharing between short duration NGSO satellites and the radio astronomy service in the 150.05-153 MHz and 406.1-410 MHz frequency bands     Netherlands (Kingdom of the)   AI1.7   2017-10-16
[ 207 ]  
 
Proposed amendments to PDNR ITU-R SA.[SHORT DURATION NGSO REQUIREMENTS]     Netherlands (Kingdom of the)   AI1.7   2017-10-16
[ 206 ]  
 
Proposed amendments to PDNR ITU-R SA.[SHORT DURATION NGSO-CHARACTERISTICS]     Netherlands (Kingdom of the)   AI1.7   2017-10-16
[ 205 ]  
 
Reply liaison statement to Working Party 7B - WRC-19 agenda item 1.3     WP 4C     2017-10-16
[ 204 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 7B) - Inconsistency between filed RR Appendix 4 C/N objectives and other technical parameters     WP 4C     2017-10-16
[ 203 ]  
 
Draft reply liaison statement to TG 5-1 Questions     United States of America     2017-10-11
[ 202 ]  
 
Recommendation ITU-R SA.1164-2 - Sharing and coordination criteria for service links in data collection systems using GSO satellites in the earth exploration-satellite and meteorological-satellite services     United States of America     2017-10-11
[ 201 ]  
 
Preliminary draft revision of Recommendation ITU-R SA.1016 - Sharing considerations relating to deep space research     United States of America     2017-10-11
[ 200 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[SRS FRQ] - Preferred frequencies and bandwidths for manned and unmanned near-Earth research satellites     United States of America     2017-10-11
[ 199 ]  
 
Preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - REQUIREMENTS] - Studies to accommodate spectrum requirements in the space operation service for non-geostationary satellites with short duration missions     United States of America   AI1.7   2017-10-11
[ 198 ]  
 
Draft CPM text on WRC-19 agenda item 1.3 - Agenda item 1.3     United States of America   AI1.3   2017-10-11
[ 197 ]  
 
Preliminary draft new Report ITU-R SA.[460 MHZ METSAT-EESS] - Studies related to proposed change in 460-470 MHz secondary allocation for METSAT to primary and addition of primary allocation to EESS     United States of America   AI1.3   2017-10-11
[ 196 ]  
 
Preliminary draft new Report ITU-R SA.[400 MHZ-LIMITS] - To considerer establishing in-band power limits for earth stations operating in the frequency ranges 399.9-400.05 MHz and 401-403 MHz within the MSS, EESS and METSAT services     United States of America   AI1.2   2017-10-11
[ 195 ]  
 
Draft CPM text on WRC-19 agenda item 1.2 - Agenda item 1.2     United States of America   AI1.2   2017-10-11
[ 194 ]  
 
Preliminary draft new Report ITU-R SA.[EESS-METSAT CHAR] - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies     United States of America     2017-10-11
[ 193 ]  
 
Recommendation ITU-R SA.1163-2 - Aggregate interference criteria for service links in data collection systems for GSO satellites in the earth exploration-satellite and meteorological-satellite     United States of America     2017-10-11
[ 192 ]  
 
Preliminary draft new Report ITU-R SA. [SHORT DURATION NGSO - CHARACTERISTICS] - Technical characteristics for telemetry, tracking and command in the space operations service below 1 GHz for non-GSO satellites with short duration missions     United States of America   AI1.7   2017-10-11
[ 191 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - SHARING STUDIES] - Studies on the suitability of existing allocations to the space operation service below 1 GHz and additional sharing studies on possible new and/or upgraded allocations     United States of America   AI1.7   2017-10-11
[ 190 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7     United States of America   AI1.7   2017-10-11
[ 189 ]  
 
Proposed revisions to draft CPM text on WRC-19 agenda item 1.7     United States of America   AI1.7   2017-10-11
[ 188 ]  
 
Cost recovery for non-GSO satellite networks     Director, BR     2017-10-10
[ 187 ]  
 
Report of the thirteenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     International Maritime Organization     2017-09-11
[ 186 ]  
 
Reply liaison statement to Working Party 7B regarding divergence between Recommendations ITU-R P.2001-2 and ITU-R P.452-16     WP 3M     2017-09-06
[ 185 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 7A, 7B and 7D) - WRC-23 agenda item 2.2 regarding EESS (active) around the 45 MHz frequency region     WP 3L     2017-09-06
[ 184 ]  
 
Need for protecting the 26 GHz EESS band and EESS (passive) bands for remote sensing     Director, BR     2017-08-14
[ 183 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations     WP 1A     2017-07-10
[ 182 ]  
 
Reply liaison statement to Working Party 7D (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, and 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services     WP 1A     2017-07-10
[ 181 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12)     WP 1A     2017-07-10
[ 180 ]  
 
Reply liaison statement to Working Party 7B (copied for information to Working Party 5C and Task Group 5/1) - Response to Working Party 7B Questions and Issues regarding PDN Recommendation ITU-R M.[AMS-CHAR 24]     WP 5B     2017-06-19
[ 179 ]  
 
Liaison statement to Working Party 7B regarding WRC-19 agenda item 1.3 (copied for information to Working Parties 5B and 5D)     WP 5A   AI1.3   2017-06-05
[ 178 ]  
 
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5D, 7B,7C, 7D and Task Group 5/1 - WRC-19 agenda item 1.14     WP 5C   AI1.14   2017-06-05
[ 177 ]  
 
Reply liaison statement to Working Party 7B on WRC-19 agenda item 1.3     WP 5C   AI1.3   2017-06-01
[ 176 ]  
 
Liaison statement to Working Party 7B (copy to Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz     WP 5C     2017-06-01
[ 175 ]  
 
Liaison statement to Working Party 7B - Maritime mobile service characteristic for WRC-19 agenda item 1.3     WP 5B   AI1.3   2017-05-30
[ 174 ]  
 
Liaison statement to Working Parties 4A, 4C, 5B, 7B and 7C - Request for additional information on parameters in support of sharing and compatibility studies with IMT-2020     TG 5/1     2017-05-23
[ 173 ]  
 
Liaison statement to Working Parties 4C, 5A and 7B - Modifications to RR Appendix 4 data elements to be provided for non-geostationary satellite networks/systems     WP 4A     2017-05-19
[ 172 ]  
 
Liaison statement to Working Parties 4C, 5A and 7B - Inconsistency between filed RR Appendix 4 C/N objectives and other technical parameters     WP 4A     2017-05-19
[ 171 ]  
 
Note to Chairman of Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Microsoft EXCEL implementation of clutter loss and building entry loss calculations     Chairmen, SG 3 and WPs 3J, 3K & 3M     2017-04-13
[ 170 ]  
+Ann.1-21 
Report on the April 2017 meeting of Working Party 7B with a view to its next meeting (October 2017) (Geneva, 5-11 April 2017)     Chairman, WP 7B     2017-04-11
[ 169 ]  
 
Final list of participants: Working Party 7B (Geneva, 4-11 April 2017)     Director, BR     2017-04-11
[ 168 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services     WP 7D     2017-04-07
[ 167 ]  
 
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13     Chairman, WP 6A   AI1.13   2017-04-05
Results:416 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-01-11