Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 147 ]
|
Proposed changes of P.NAMS ToR for the IPTV Application Area
|
Deutsche Telekom AG
|
Q14/12
|
2010-09-06 |
|
[ 146 ]
|
Ericsson participation in P.OLQA characterization
|
Ericsson AB
|
Q9/12
|
2010-09-06 |
|
[ 145 ]
|
P.OLQA validation cross check results
|
Ericsson AB
|
Q9/12
|
2010-09-06 |
|
[ 144 ]
|
Comments and Proposal on P.OLQA Standardization
|
Qualcomm Inc.
|
Q9/12
|
2010-09-06 |
|
[ 143 ]
|
Draft Requirement Specification for P.AMD (Perceptual Approaches for Multi-Dimensional Analysis)
|
Deutsche Telekom AG
|
Q9/12
|
2010-09-06 |
|
[ 142 ]
|
Proposed study items for the POLQA characterization phase
|
Ascom (Switzerland) Ltd.
|
Q9/12
|
2010-09-03 |
|
[ 141 ]
|
Stable Draft of New Recommendation P.863
|
OPTICOM
,
SwissQual
,
TNO
|
Q9/12
|
2010-09-02 |
|
[ 140 ]
|
Playout buffer events as performance parameters
|
France Telecom Orange
|
Q17/12, Q13/12
|
2010-05-10 |
|
[ 139 ]
|
Comments on Recommendation Y.1221
|
France Telecom Orange
|
Q11/12
|
2010-05-10 |
|
[ 138 ]
|
Bitrate measurement and traffic characterisation
|
France Telecom Orange
|
Q17/12, Q11/12
|
2010-05-10 |
|
[ 137 ]
|
Updated Draft Terms of Reference (ToR) for P.NBAMS
|
Ericsson
|
Q14/12
|
2010-05-10 |
|
[ 136 ]
|
Comments on P.OLQA cross-check results
|
Psytechnics Ltd
|
Q9/12
|
2010-05-10 |
|
[ 135 ]
|
Subjective Databases Required for P.NAMS Standardisation
|
Deutsche Telekom Labs
,
Ericsson Research
,
Psytechnics Ltd
|
Q14/12
|
2010-05-10 |
|
[ 134 ]
|
Proposal on update text for G.RQAM - Reference guide to QoE assessment methodologies
|
Brazil
|
Q13/12
|
2010-05-07 |
|
[ 133 ]
|
Proposed performance criteria for P.OLQA model re-calibration
|
OPTICOM
,
SwissQual
,
TNO
|
Q9/12
|
2010-05-07 |
|
[ 132 ]
|
Phase 4 modelling with Y.1540 Appendix VII: Performance parameters for stream repair techniques
|
AT&T
|
Q17/12, Q14/12, Q13/12
|
2010-05-07 |
|
[ 131 ]
|
QoS mapping and interworking between Ethernet, IP and MPLS
|
Deutsche Telekom
|
Q17/12
|
2010-05-07 |
|
[ 130 ]
|
Y.1541 Class 0 IPDV Requirements and G.114 Appendix III
|
Telekom Austria
|
Q17/12, Q11/12, Q10/12
|
2010-05-07 |
|
[ 129 ]
|
Proposal for clarifying the scope of Y.1542
|
KDDI, Japan
|
Q11/12
|
2010-05-07 |
|
[ 128 ]
|
P.OLQA technologies
|
Psytechnics Ltd
|
Q9/12
|
2010-05-07 |
|
[ 127 ]
|
Progress update on Psytechnics' P.OLQA model
|
Psytechnics Ltd
|
Q9/12
|
2010-05-07 |
|
[ 126 ]
|
Proposal for initial Q.16 work item
|
Psytechnics Ltd
|
Q16/12
|
2010-05-07 |
|
[ 125 ]
|
Proposed new Question on conferencing and telemeeting assessment
|
Germany
,
Sweden
|
Q1/12
|
2010-05-07 |
|
[ 124 ]
|
Extending the E-model to better capture terminal effects
|
Deutsche Telekom AG
,
Head Acoustics GmbH
|
Q8/12
|
2010-05-07 |
|
[ 123 ]
|
Consideration of send-side ambient noise in the E-model
|
Deutsche Telekom AG
|
Q8/12
|
2010-05-07 |
|
[ 122 ]
|
Extending Suppl. 24 to P-Series towards multimodal systems and services
|
Deutsche Telekom AG
|
Q7/12, Q1/12
|
2010-05-07 |
|
[ 121 ]
|
Position towards a perceptual dimension analysis
|
Detusche Telekom AG
,
France Telecom Orange
|
Q9/12, Q16/12
|
2010-05-07 |
|
[ 120 ]
+Add.1 |
First draft listening WB E-model
|
Deutsche Telekom AG
|
Q8/12
|
2010-05-07 |
|
[ 119 ]
|
Towards a Super-wideband E-model
|
Deutsche Telekom AG
|
Q8/12
|
2010-05-07 |
|
[ 118 ]
|
Subjective quality evaluation of audio streaming applications: ACR vs. MUSHRA
|
Deutsche Telekom AG
|
Q14/12, Q13/12
|
2010-05-07 |
|
[ 117 ]
|
Announcement of OPTICOM, SwissQual and TNO to submit a joint P.OLQA model
|
OPTICOM
,
SwissQual
,
TNO
|
Q9/12
|
2010-05-07 |
|
[ 116 ]
|
Corrigendum: SwissQual's P.OLQA Candidate Model
|
SwissQual AG
|
Q9/12
|
2010-05-07 |
|
[ 115 ]
|
Clarification of process to incorporate new applications in Y.1541
|
AT&T
,
NTT Corporation
|
Q17/12
|
2010-05-07 |
|
[ 114 ]
|
Typical example of PC-based delay measurement inaccuracy
|
NTT Corporation
|
Q17/12
|
2010-05-07 |
|
[ 113 ]
|
Correction for Y.1221
|
NTT Corporation
|
Q11/12
|
2010-05-07 |
|
[ 112 ]
|
Some aspects related to P.OLQA standard
|
Ascom Network Testing
|
Q9/12
|
2010-05-07 |
|
[ 111 ]
|
Universal Headset/Headphone Interface Solution for Wireless Digital Terminals
|
MIIT China
|
Q4/12, Q3/12
|
2010-05-07 |
|
[ 110 ]
|
Revision of ITU-T P.341
|
MIIT China
|
Q3/12
|
2010-05-07 |
|
[ 109 ]
|
Revision of ITU-T P.311
|
MIIT China
|
Q3/12
|
2010-05-07 |
|
[ 108 ]
|
Why SG12 must standardize only one model for the future P.OLQA standard
|
France Telecom Orange
,
AT&T
,
Deutsche Telekom
,
Huawei Technologies
|
Q9/12
|
2010-05-07 |
|
[ 107 ]
|
Automated double talk analysis procedure
|
HEAD Acoustics GmbH
|
Q6/12, Q4/12
|
2010-05-04 |
|
[ 106 ]
|
Specification of Acoustical Interfaces (Artificial Ears, Artificial Mouths) for Super-Wideband Testing
|
Deutsche Telekom Labs
,
HEAD Acoustics GmbH
|
Q7/12, Q5/12
|
2010-05-04 |
|
[ 105 ]
|
Proposal to launch the study of the end-user requirements for quality assurance and assessment for video streaming services
|
Huawei Technologies Co., Ltd.
|
Q13/12
|
2010-05-04 |
|
[ 104 ]
|
Universal German speech sample for use in objective and subjective test applications
|
Deutsche Telekom AG
,
SwissQual AG
|
Q9/12, Q7/12, Q6/12
|
2010-05-04 |
|
[ 103 ]
|
Requirements for wideband terminals
|
France Telecom Orange
|
Q3/12
|
2010-04-30 |
|
[ 102 ]
|
Performance comparisons of subjective quality assessment methods
|
NTT, Japan
|
Q14/12
|
2010-04-30 |
|
[ 101 ]
|
Investigation of IPTV services
|
NTT, Japan
|
Q14/12
|
2010-04-30 |
|
[ 100 ]
|
Handling of error recovery schemes in P.NAMS and P.NBAMS projects
|
NTT, Japan
|
Q14/12
|
2010-04-30 |
|
[ 99 ]
|
Packet loss and coding impact on quality of synthesized speech predicted by PESQ and P.563 models
|
Ministry PTT, Slovakia
|
Q9/12
|
2010-04-30 |
|
[ 98 ]
|
Updates to P.862.3 on the Usage Scenarios for EVRC Family Codecs
|
Qualcomm Inc.
|
Q9/12, Q7/12
|
2009-10-26 |
Results:347 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):