Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 198 ]
|
G.8271.2: Editor's Corrections
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-05 |
|
[ 197 ]
|
G.8271: Editor's Corrections
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-05 |
|
[ 196 ]
|
Correction to QL values for new clocks, Option II Networks - G.8264
|
Nokia USA
|
Q13/15
|
2017-06-05 |
|
[ 195 ]
(Rev.1) |
Support of clearing counters for legacy type PM MEs
|
Calnex Solutions Limited (United Kingdom)
|
Q2/15
|
2017-06-05 |
|
[ 194 ]
(Rev.1) |
Support of Extended VLAN filtering type for upper layer protocols
|
Calnex Solutions Limited (United Kingdom)
|
Q2/15
|
2017-06-05 |
|
[ 193 ]
(Rev.1) |
G.vdsl: Proposed changes in Annex D and main body for LR-VDSL
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-05 |
|
[ 192 ]
(Rev.1) |
LR-VDSL2 upstream PSD
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2017-06-05 |
|
[ 191 ]
|
PON PMD Calculator - OOC, OOB and IBXT
|
Calnex Solutions Limited (United Kingdom)
|
Q2/15
|
2017-06-05 |
|
[ 190 ]
(Rev.1-3) |
In-Band Crosstalk Due To Multiple ONU Reflections - Version 2
|
Calnex Solutions Limited (United Kingdom)
|
Q2/15
|
2017-06-05 |
|
[ 189 ]
|
G.fast: Triggering Criteria for RMCR
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 188 ]
|
G.fast: Improving RMCR
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 187 ]
|
G.fast: DTA and RPA
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 186 ]
|
G.fast: A Coordinated DTA Procedure to Avoid Unexpected NEXT
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 185 ]
|
G.fast: Comparison of two power control methods for precoding
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 184 ]
|
G.mgfast: Constellation Shaping with LDPC Coded Modulation
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 183 ]
|
G.fast: Simulation Results for Maximum Ration Transmission
|
Futurewei Technologies US R&D Center (United States)
|
Q4/15
|
2017-06-05 |
|
[ 182 ]
|
G.8273.2: Noise transfer: SyncE to PTP frequency response
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-05 |
|
[ 181 ]
(Rev.1) |
Proposal on extending G.sup56 to support beyond 10G interface optimized for the transport of CPRI
|
China Mobile Communications Corporation
,
CAICT
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Intel Corporation (United States)
,
IP Light
,
Xilinx Incorporation
|
Q11/15
|
2017-06-05 |
|
[ 180 ]
|
G.hn: Secure Admission - auto-mode mechanism
|
Sigma Designs Israel S.D.I Ltd.
|
Q18/15
|
2017-06-05 |
|
[ 179 ]
(Rev.1) |
Layer adjacency discovery based on FlexE and FlexO/OTUCn
|
China Unicom
,
FiberHome Technologies Group (China)
|
Q14/15
|
2017-06-05 |
|
[ 178 ]
|
Relationship between G.800 topology and G.7711 FDs/Links
|
China Unicom
,
FiberHome Technologies Group (China)
|
Q14/15, Q12/15
|
2017-06-05 |
|
[ 177 ]
(Rev.1) |
Interaction between SDN Controller and Applications
|
China Unicom
,
FiberHome Technologies Group (China)
|
Q14/15, Q12/15
|
2017-06-05 |
|
[ 176 ]
|
Validate resilience model of G.7711 for simple ERP
|
China Unicom
,
FiberHome Technologies Group (China)
|
Q9/15, Q14/15
|
2017-06-05 |
|
[ 175 ]
|
Secure Admission in G.hn networks - passphrase based procedure
|
Sigma Designs Israel S.D.I Ltd.
|
Q18/15
|
2017-06-05 |
|
[ 174 ]
|
Proposed 40 channels application parameters for G.metro
|
ADVA Optical Networking (United Kingdom)
,
China Unicom
,
Finisar Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Telefon AB - LM Ericsson (Sweden)
,
ZTE Corporation (China)
|
Q6/15
|
2017-06-05 |
|
[ 173 ]
|
Terrestrial deployment and 400G system test results of G.654 fibre in China Unicom
|
China Unicom
|
Q6/15, Q5/15
|
2017-06-05 |
|
[ 172 ]
|
ESMC Padding bits in G.8264
|
Huawei Technologies Co., Ltd. (China)
,
Nokia USA
,
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2017-06-05 |
|
[ 171 ]
(Rev.1) |
G.8271.1 Appendix V failure scenarios
|
Telefon AB - LM Ericsson (Sweden)
|
Q13/15
|
2017-06-05 |
|
[ 170 ]
|
G.8273.2: Noise transfer: PTP to PTP frequency response
|
Calnex Solutions Limited
|
Q13/15
|
2017-06-05 |
|
[ 169 ]
|
Architecture Requirement of 5G transport network
|
China Mobile Communications Corporation
,
FiberHome Technologies Group (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q12/15, Q11/15, Q10/15
|
2017-06-05 |
|
[ 168 ]
|
Defects of time degradation
|
China Mobile Communications Corporation
|
Q13/15
|
2017-06-05 |
|
[ 167 ]
|
Proposal on mapping table of PTP clockClass to SSM
|
China Mobile Communications Corporation
|
Q13/15
|
2017-06-05 |
|
[ 166 ]
|
Frequency offset monitoring function
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q13/15
|
2017-06-05 |
|
[ 165 ]
|
Considerations on sync requirements and network budget for 5G
|
China Mobile Communications Corporation
|
Q13/15
|
2017-06-05 |
|
[ 164 ]
|
Requirement and solutions for PON systems above 10Gbps per wavelength
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2017-06-05 |
|
[ 163 ]
|
Proposal for revising G.697 to improve e-OTDR related contents
|
China Mobile Communications Corporation
,
FiberHome Technologies Group (China)
,
Huawei Technologies Co., Ltd. (China)
|
Q6/15
|
2017-06-05 |
|
[ 162 ]
|
Analysis on PON synchronization alarms
|
China Mobile Communications Corporation
|
Q2/15
|
2017-06-05 |
|
[ 161 ]
|
Analysis on PON ONU synchronization configuration
|
China Mobile Communications Corporation
|
Q2/15
|
2017-06-05 |
|
[ 160 ]
|
Proposal on sync management requirements and model
|
China Mobile Communications Corporation
|
Q14/15
|
2017-06-05 |
|
[ 159 ]
|
Standards Gap Analysis of FlexE
|
China Mobile Communications Corporation
,
FiberHome Technologies Group (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q9/15, Q10/15
|
2017-06-05 |
|
[ 158 ]
|
Dual-Homing Coordination for MPLS-TP
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q9/15, Q14/15, Q10/15
|
2017-06-05 |
|
[ 157 ]
|
Requirements of future 5G mobile transport network
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2017-06-05 |
|
[ 156 ]
|
Proposal to start the work for the revision of G.9973
|
Fujitsu Limited (Japan)
,
Japan Advanced Institute of Science and Technology
,
Mitsubishi Electric Corporation
|
Q18/15
|
2017-06-05 |
|
[ 155 ]
|
The Relationship between Management and SDN controller
|
China Unicom
|
Q14/15, Q12/15
|
2017-06-05 |
|
[ 154 ]
|
Proposal to start new projects to specify 5G transport over OTN
|
China Mobile Communications Corporation
,
FiberHome Technologies Group (China)
,
Huawei Technologies Co., Ltd. (China)
,
Microsemi Corporation (United States)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q11/15
|
2017-06-05 |
|
[ 153 ]
|
Cascaded protection
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q9/15, Q11/15
|
2017-06-05 |
|
[ 152 ]
|
Consideration on partial rate granularity of FlexE aware signal on each PHY
|
Fujitsu Limited (Japan)
|
Q11/15
|
2017-06-05 |
|
[ 151 ]
|
OTN interface protection
|
China Unicom
|
Q9/15, Q11/15
|
2017-06-05 |
|
[ 150 ]
|
G.mgfast: Proposing some basic agreements
|
Sckipio Technologies S.I. Ltd. (Israel)
|
Q4/15
|
2017-06-05 |
|
[ 149 ]
|
Comments on draft new Recommendation L.110 (ex L.dsa)
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q16/15
|
2017-06-05 |
Results:398 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):