Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 899 ]
|
Updated Telecom Slave Model
|
Huawei
,
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 898 ]
|
Flag Fields
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 897 ]
|
Test Results of IEEE1588v2 hop-by-hop time synchronization using Boundary Clocks
|
Huawei
,
China Mobile Communications Corporation
|
Q13/15
|
2010-05-18 |
|
[ 896 ]
|
The use of SyncE and IEEE1588v2 for Time Distribution
|
Huawei
,
China Mobile Communications Corporation
|
Q13/15
|
2010-05-18 |
|
[ 895 ]
|
ESMC Transport over GPON
|
Huawei
,
BT
|
Q2/15, Q13/15
|
2010-05-18 |
|
[ 894 ]
|
G.8264 Amendment: editorial comments regarding the use of physical methods to deliver timing in a multi-operator context
|
Huawei
,
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 893 ]
|
Usage of PTP domain number for the time-profile
|
Huawei
|
Q13/15
|
2010-05-18 |
|
[ 892 ]
|
Proposed text modifications to the delay measurement process in G.8021
|
NEC Corporation
|
Q9/15
|
2010-05-18 |
|
[ 891 ]
|
Proposed text for ETH group functions in G.8021
|
NEC Corporation
|
Q9/15
|
2010-05-18 |
|
[ 890 ]
|
Consideration of the proactive FD/FDV measurements in G.8021/Y.1731
|
NEC Corporation
|
Q9/15, Q14/15, Q10/15
|
2010-05-18 |
|
[ 889 ]
|
Consideration of the enhancement of performance monitoring in G.8021/Y.1731
|
NEC Corporation
|
Q9/15, Q14/15, Q10/15
|
2010-05-18 |
|
[ 888 ]
|
Proposal for OMCI transport in Ethernet PON
|
Mitsubishi
,
Ericsson
,
HItachi
,
NTT
|
Q2/15
|
2010-05-18 |
|
[ 887 ]
|
Black-hole problem due to address mis-learning in G.8032
|
Korea (Republic of)
|
Q9/15
|
2010-05-18 |
|
[ 886 ]
|
Proposal to modify failure of protocol conditions in G.8031 and G.873.1
|
Korea (Republic of)
|
Q9/15
|
2010-05-18 |
|
[ 885 ]
|
MS-W (Manual Switch to Working) in revertive operation in G.8031
|
Korea (Republic of)
|
Q9/15
|
2010-05-18 |
|
[ 884 ]
|
Proposal to comprehensively classify modulation/demodulation and multiplex/demultiplex schemes used in optical transmission systems
|
NTT
|
Q6/15
|
2010-05-18 |
|
[ 883 ]
|
Applications of G.9960, G.9961 Transceivers for Smart Grid applications: Advanced Metering infrastructure, Energy Management in the home, and Electric Vehicles
|
Lantiq Beteiligungs
,
DS2
|
Q4/15
|
2010-05-18 |
|
[ 882 ]
|
Consideration of jitter performance measurement method for XG-PON optical interfaces
|
CIAJ
|
Q2/15, Q15/15
|
2010-05-18 |
|
[ 881 ]
|
Proposal for definition of COTDR
|
CIAJ
|
Q8/15, Q15/15
|
2010-05-18 |
|
[ 880 ]
|
Proposal for correction of table1 parameters in O.174
|
CIAJ
|
Q15/15
|
2010-05-18 |
|
[ 879 ]
|
Proposal for addition of jitter test parameters and text in O.174
|
CIAJ
|
Q15/15
|
2010-05-18 |
|
[ 878 ]
|
Proposal for Title, Summary and Scope of O.xgponjitter
|
CIAJ
|
Q2/15, Q15/15
|
2010-05-18 |
|
[ 877 ]
|
Comments on the protocol specifications in Y.1731
|
NEC Corporation
|
Q10/15
|
2010-05-18 |
|
[ 876 ]
|
Issues with the Transparent Clock concept of PTPv2 in a telecom environment
|
France Télécom
|
Q4/15, Q2/15, Q13/15
|
2010-05-18 |
|
[ 875 ]
|
Architecture for phase and time distribution
|
France Télécom
|
Q4/15, Q2/15, Q13/15
|
2010-05-18 |
|
[ 874 ]
|
G.hn: 802.1Qat support in G.hn
|
Intel Corp.
|
Q4/15
|
2010-05-18 |
|
[ 873 ]
|
G.8260: discussion on packet pre-selection criteria and comments on cluster and FWPR PDV metrics
|
France Télécomq
|
Q13/15
|
2010-05-18 |
|
[ 872 ]
|
G.8260: technical comments regarding WD115 (PDV metrics) from San Jose interim meeting
|
France Télécom
,
Tellabs
|
Q13/15
|
2010-05-18 |
|
[ 871 ]
|
G.8260: definition of floor delay, delay steps, and comments on Appendix I
|
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 870 ]
|
G.8260: list of requirements for PDV metrics
|
France Télécom
|
Q13/15
|
2010-05-18 |
|
[ 869 ]
|
G.cx: A concern regarding operation with non-standardized systems
|
CopperGate Communications
|
Q4/15
|
2010-05-18 |
|
[ 868 ]
|
G.hn: IPR Statement of CopperGate Communications
|
CopperGate Communications
|
Q4/15
|
2010-05-18 |
|
[ 867 ]
|
G3 Low Frequency Narrow Band OFDM PLC Proposal
|
Maxim Integrated Products, Inc.
|
Q4/15
|
2010-05-18 |
|
[ 866 ]
|
Rogue ONU draft supplement
|
Verizon
|
Q2/15
|
2010-05-18 |
|
[ 865 ]
|
G.8260: methodology to perform a PDV measurement
|
France Télécom, Ericsson
|
Q13/15
|
2010-05-18 |
|
[ 864 ]
|
G.hnem: Report on informal ad-hoc - Performance of the FEC for G.hnem
|
Lantiq
,
DS2
,
Yitran
|
Q4/15
|
2010-05-18 |
|
[ 863 ]
|
G.hnem: Proposal to specify immediate acknowledgement
|
Lantiq
|
Q4/15
|
2010-05-18 |
|
[ 862 ]
(Rev.1) |
The removal of Floor Delay steps in Network PDV metrics
|
Calnex Solutions
|
Q13/15
|
2010-05-18 |
|
[ 861 ]
|
Development of a Wander requirement for 1588v2 Boundary Clocks
|
Calnex Solutions
|
Q13/15
|
2010-05-18 |
|
[ 860 ]
|
Proposed addition of 'No APS Message Received' defect to G.8021
|
Tellabs
|
Q9/15
|
2010-05-18 |
|
[ 859 ]
|
Further considerations for ODUk delay measurement processes
|
Tellabs
|
Q9/15
|
2010-05-18 |
|
[ 858 ]
|
Adding administrative state to ODU multiplexing adaptation functions
|
Tellabs
|
Q9/15
|
2010-05-18 |
|
[ 857 ]
|
G.hnem: Proposal for G.hnem encryption scheme
|
Lantiq
|
Q4/15
|
2010-05-18 |
|
[ 856 ]
|
G.INP: SRA Proposal for G.998.4
|
Broadcom
|
Q4/15
|
2010-05-18 |
|
[ 855 ]
|
G.vdsl: Proposed Text for Distribution of Time-of-Day over VDSL2 Links
|
Broadcom
|
Q4/15
|
2010-05-18 |
|
[ 854 ]
|
G.vdsl: G.adsl: Comments and way forward on INM accuracy
|
Broadcom
|
Q4/15
|
2010-05-18 |
|
[ 853 ]
|
Proposed description of optical source for optical phase sensitive modulation/demodulation schemes used for high-speed large-capacity WDM transmission
|
NTT
|
Q7/15
|
2010-05-17 |
|
[ 852 ]
|
Proposal for adding a new category, A3, to ITU-T Recommendation G.657 (Full Texts)
|
Corning
|
Q5/15
|
2010-05-17 |
|
[ 851 ]
|
Number not used
|
SoftBank Telecom
|
Q5/15
|
2010-05-17 |
|
[ 850 ]
|
VDSL2 issues for discussion at dedicated DSL meetings
|
Swisscom Ltd
|
Q4/15
|
2010-05-17 |
Resultados :352 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):