Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Resultados :307 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Siguiente Next
Contribuciones  [ AI/Cuestión: 2/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 866 ]  
 
Rogue ONU draft supplement     Verizon   Q2/15   2010-05-18
[ 848 ]  
 
Draft supplement: 10-Gigabit-capable Passive Optical Networks (XG-PON): MAC/SERDES TO PMD interface     PMC-Sierra   Q2/15   2010-05-17
[ 825 ]  
 
Requirement for multi stages multiplex/demultiplex configuration     China Telecom , China Mobile , China Unicom , ZTE   Q9/15, Q14/15, Q12/15   2010-05-17
[ 817 ]  
 
Comments on Transitional Link Study Points     Huawei   Q12/15   2010-05-16
[ 811 ]  
 
Distributed Boundary and Transparent Clocks     ADTRAN , Calix , Symmetricom   Q4/15, Q2/15, Q13/15   2010-05-16
[ 809 ]  
 
Support of SSM for Synchronous Ethernet in OMCI     ADTRAN   Q2/15, Q13/15   2010-05-16
[ 806 ]  
 
Proposed ITU-T Rec. on remote management of CPE     AT&T , ASSIA Inc , Qwest , Verizon   Q4/15, Q2/15, Q1/15   2010-05-16
[ 789 ]  
 
Concern with G.ptneq & E-OTN     Canada   Q9/15, Q12/15   2010-05-14
[ 785 ]  
 
Proposed ITU-T Rec. on remote management of CPE     Alcatel-Lucent , BT , Cable & Wireless Communications , France Telecom Orange , Nokia Siemens Networks , Swisscom , Technicolor , Telecom Italia   Q4/15, Q2/15, Q1/15   2010-05-14
[ 782 ]  
 
Proposed New Recommendation on remote management of CPE over broadband networks - CPE WAN Management Protocol (CWMP)     Alcatel-Lucent Bell NV   Q4/15, Q2/15, Q1/15   2010-05-12
[ 761 ]  
 
OTUk-AIS used for OTN alarm suppression     Ericsson   Q9/15, Q12/15, Q11/15   2010-04-29
[ 754 ]  
 
Transitional Links and Resource allocation     Ciena Corporation   Q12/15   2010-04-28
[ 717 ]  
 
ODU TCM Layer for OTN Auto-discovery as defined in G.7714.1     Alcatel-Lucent   Q14/15, Q12/15   2009-09-20
[ 709 ]  
 
MEs for TDM pseudowire over MPLS     Huawei technologies   Q2/15   2009-09-20
[ 708 ]  
 
A Nested PON Architecture     Huawei technologies   Q2/15   2009-09-20
[ 707 ]  
 
N:1 Protection for Long Reach GPON     Huawei technologies   Q2/15   2009-09-20
[ 702 ]  
 
Description of Transparency in G.800     Huawei Technologies   Q12/15   2009-09-20
[ 683 ]  
 
G.800 Transport Entities     Huawei Technologies   Q12/15   2009-09-20
[ 662 ]  
 
Discussion on providing an accurate time synchronization service using the native capabilities of time capable network technologies.     Tellabs , France Telecom Orange   Q2/15   2009-09-20
[ 620 ]  
 
Proposed of 3R regeneration in G.872     Deutsche Telekom   Q12/15   2009-09-20
[ 619 ]  
 
OCh definitions in G.872     Deutsche Telekom   Q12/15   2009-09-20
[ 592 ]  
 
Proposal of definition of maintenance points (MEP and MIP)     NTT   Q12/15, Q10/15   2009-09-18
[ 587 ]  
 
Further consideration about subnetwork blocking resource management in G.8080     ZTE Corporation   Q12/15   2009-09-18
[ 586 ]  
 
Consideration on ODUflex resizing     ZTE Corporation   Q14/15, Q12/15, Q11/15   2009-09-18
[ 583 ]  
 
Proposals to consider resource sharing in G.8080     ZTE Corporation   Q12/15   2009-09-18
[ 569 ]  
 
Proposal of re-using equipment protection profile for supporting N:1 protection in G.984.4     Huawei Technologies   Q2/15   2009-09-18
[ 568 ]  
 
Proposal for supporting related BM-CM RE and WC-enabled RE configuration in G.984.4     Huawei Technologies   Q2/15   2009-09-18
[ 558 ]  
 
Proposal of adding GEM layer 2 service related attributions to managed entity ONT2-G     MIIT   Q2/15   2009-09-18
[ 557 ]  
 
Description & implementation examples for a WDM1r with dedicated OTDR and RF video ports     ZTE Corporation   Q2/15   2009-09-18
[ 556 ]  
 
Description & implementation examples for a WDM1r with a dedicated OTDR port     ZTE Corporation   Q2/15   2009-09-18
[ 500 ]  
 
Frequency grid for GPON wavelength converted Reach Extenders     Nortel Networks (Canada)   Q6/15, Q2/15   2009-09-17
[ 499 ]  
 
Revision of wavelength allocation grid in G.984.6Am1     Nortel Networks (Canada)   Q2/15   2009-09-17
[ 498 ]  
 
Updation of the text providing example of single fibre WC-enabled seeded RE units     Nortel Networks (Canada)   Q2/15   2009-09-17
[ 494 ]  
 
Transitional Links as SNPP Links     Nortel Networks (Canada)   Q12/15   2009-09-17
[ 467 ]  
 
Proposal to introduce multi-granularity in photonic cross-connect switching in AON/WSON     NTT   Q12/15   2009-09-16
[ 460 ]  
 
Proposed modification for G.8121 and consideration of Ethernet as MPLS-TP client     Fujitsu   Q9/15, Q14/15, Q12/15, Q10/15   2009-09-16
[ 457 ]  
 
Directory listing capability, file transfer controller in G.984.4 am 2     Ericsson   Q2/15   2009-09-16
[ 456 ]  
 
Document withdrawn     Ericsson   Q2/15   2009-09-16
[ 455 ]  
 
Additional VoIP attributes in G.984.4 am 2     Ericsson   Q2/15   2009-09-16
[ 453 ]  
 
Considerations on the description of the ODU layer network in G.872 and G.8080     Huawei Technologies   Q14/15, Q12/15   2009-09-16
[ 445 ]  
 
Management of high capacity connections in the OTN     Huawei Technologies   Q12/15   2009-09-16
[ 443 ]  
 
Text proposal to align clause 9/G.872 with draft revised G.709     Huawei Technologies   Q12/15   2009-09-16
[ 441 ]  
 
GPON over OTN mapping     Huawei Technologies , China Mobile Communications Corporation , PMC-Sierra   Q2/15, Q11/15   2009-09-16
[ 431 ]  
 
G.709 "Black Link" OTM-1r.m Interface as IrDI     AT&T   Q6/15, Q12/15, Q11/15   2009-09-16
[ 414 ]  
 
Proposal of architecture of G.omci     NTT   Q2/15   2009-09-15
[ 411 ]  
 
Sublayers and WSON in G.872     Ciena Corp   Q12/15   2009-09-15
[ 410 ]  
 
An updated Topology model for WSON     Ciena Corp   Q12/15   2009-09-15
[ 409 ]  
 
Some thoughts on Transport Entities     Ciena Corp   Q12/15   2009-09-15
[ 408 ]  
 
Characteristic Information, Sublayers and Media     Ciena Corp   Q12/15   2009-09-15
[ 401 ]  
 
Propose to add requirement of discovery support on MPLS-TP OAM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
Resultados :307 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-6-27