Contribuciones |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 110 ]
|
OTN Sec : Security for OTN beyond 100 Gbit/s
|
Applied Micro Circuits Corporation (AMCC)
|
Q11/15
|
2013-06-14 |
|
[ 109 ]
|
G.975.1 Appendix I.4 corrections
|
Applied Micro Circuits Corporation (AMCC)
|
Q8/15
|
2013-06-14 |
|
[ 108 ]
|
G.fast: SOS-like Scheme as Fast OLR
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2013-06-14 |
|
[ 107 ]
|
G.fast: Transmitter Initiated Gain and Bit-Loading Adjustment
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2013-06-14 |
|
[ 106 ]
|
G.fast: Configuration of Gap Time Parameter Tg2
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2013-06-14 |
|
[ 105 ]
|
G.vdsl: Low Power Mode proposal and working text
|
TQ DELTA. LLC
|
Q4/15
|
2013-06-14 |
|
[ 104 ]
(Rev.1) |
G.vector, G.hs: Potential Ghost Start Issue in G.vector
|
Ikanos Communications
|
Q4/15
|
2013-06-14 |
|
[ 103 ]
|
Proposed Revisions to the Current G.mdsp Draft
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2013-06-14 |
|
[ 102 ]
|
G.fast: Maximum aggregate transmit power
|
Deutsche Telekom AG
,
Swisscom SA
|
Q4/15
|
2013-06-14 |
|
[ 101 ]
|
G.metro scope proposal
|
ADVA Optical Networking
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
Italy
,
Nokia Siemens Networks GmbH & Co. KG
,
Telefon AB - LM Ericsson
|
Q6/15
|
2013-06-14 |
|
[ 100 ]
|
G.hn: Backup security controller mechanism
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2013-06-14 |
|
[ 99 ]
|
G.hn: Improving the existing domain merging procedure
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2013-06-14 |
|
[ 98 ]
|
Considerations on flexible ODU and OTU overhead [SP7]
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 97 ]
|
Comparisons between single and multi OTUCm/OCh signal approaches [SP4, SP5]
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 96 ]
|
Considerations on B100G OTN multiplexing hierarchy [SP23]
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 95 ]
(Rev.1) |
Consideration on B100G OTN multiplexing
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 94 ]
|
Comments and proposal on the restructuring of G.652 & G.657 categories
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2013-06-14 |
|
[ 93 ]
|
Consideration on 400GE signal transmission over B100G OTN
|
Fujitsu Limited
|
Q11/15
|
2013-06-14 |
|
[ 92 ]
|
Proposal for starting the procedure of the new Recommendation about micro-ducts technology and its application in the access network.
|
Italy
|
Q16/15
|
2013-06-14 |
|
[ 91 ]
|
Beginning Of Life ("BOL") versus End-Of-Life ("EOL") approach in the specification of passive optical components.
|
Italy
|
Q7/15, Q2/15, Q16/15
|
2013-06-14 |
|
[ 90 ]
|
Application scenarios for low-cost DWDM metro systems
|
Italy
|
Q6/15
|
2013-06-14 |
|
[ 89 ]
|
Requirements for low-cost DWDM metro systems
|
Italy
|
Q6/15
|
2013-06-14 |
|
[ 88 ]
|
Proposal about compatibility issues for the revision of G.65x Recommendations on optical fibres
|
Italy
|
Q5/15
|
2013-06-14 |
|
[ 87 ]
|
Operational examples of 2-stage ODU SMP APS protocol
|
Tellabs Oy
|
Q9/15
|
2013-06-13 |
|
[ 86 ]
|
Resource availability notifications in ODU shared mesh protection
|
Tellabs Oy
|
Q9/15
|
2013-06-13 |
|
[ 85 ]
|
Proposed changes to Recommendation G.977 for 40G and 100G systems
|
Ciena Canada
|
Q8/15
|
2013-06-13 |
|
[ 84 ]
|
Proposal for Update to G.977 considering 40G and 100G Coherent Systems
|
Ciena Canada
|
Q8/15
|
2013-06-13 |
|
[ 83 ]
|
How to handle unused PTP fields in BMCA/G.781 [G.8275.1]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 82 ]
|
Noise Generation & Noise Transfer Text [G.8273.2]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 81 ]
|
Adding Applicable Interfaces to PRTC [G.8272]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 80 ]
|
Wander Generation Variable Temperature [G.8263]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 79 ]
|
Clarification of Holdover Requirements for PEC-S [G.8263]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 78 ]
|
Using G.781 for Time Profile [G.827x]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 77 ]
|
Compliant & Non-Compliant Networks (Re-routes, Outage, Congestion) with FPP [G.8260, G.8261.1]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 76 ]
|
Proposal to change the approval process for G.8113.1 and G.8113.2 from TAP to AAP
|
Canada
|
Q10/15
|
2013-06-13 |
|
[ 75 ]
|
Spectral excursion analysis for advanced modulation formats
|
Ciena Canada
|
Q6/15
|
2013-06-13 |
|
[ 74 ]
|
Effective frequency slot characterisation
|
Ciena Canada
|
Q6/15, Q12/15
|
2013-06-13 |
|
[ 73 ]
|
G.It: Discussion on accuracy of multi-component measurements
|
Microsemi Semiconductor Corporation
|
Q4/15
|
2013-06-13 |
|
[ 72 ]
|
G.It: Request for revision of G.996.2 3-element capacitance measurement accuracies
|
Microsemi Semiconductor Corporation
|
Q4/15
|
2013-06-13 |
|
[ 71 ]
|
G.8273.2 latest draft - editorial comments
|
Integrated Device Technology (IDT)
|
Q13/15
|
2013-06-13 |
|
[ 70 ]
|
G.8273 latest draft - editorial comments
|
Integrated Device Technology (IDT)
|
Q13/15
|
2013-06-13 |
|
[ 69 ]
|
G.8263 Holdover
|
Integrated Device Technology (IDT)
|
Q13/15
|
2013-06-13 |
|
[ 68 ]
(Rev.1-2) |
Proposal of SDN-based transport network standardization
|
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2013-06-13 |
|
[ 67 ]
(Rev.1-3) |
Proposal of research on NBI functionality of controller in SDN-based transport network
|
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2013-06-13 |
|
[ 66 ]
(Rev.1-2) |
The research of the functions features of the transport network controller
|
China Unicom
,
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2013-06-13 |
|
[ 65 ]
(Rev.1-2) |
Proposal of research on transport network resource virtualization or abstraction
|
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2013-06-13 |
|
[ 64 ]
(Rev.1-2) |
Proposal of research resource partitioning of SDN-based transport network
|
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2013-06-13 |
|
[ 63 ]
(Rev.1-2) |
Proposal of research on coexistence and interworking between current transport network and SDN-based network
|
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2013-06-13 |
|
[ 62 ]
(Rev.1-2) |
Proposal of research Secure Channel in SDN-based transport network
|
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2013-06-13 |
|
[ 61 ]
(Rev.1-2) |
Proposal of research architecture for network management, controller and transport plane
|
China Unicom
,
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2013-06-13 |
Resultados :2210 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):