Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1713 ]
|
Withdrawn - Duplicate of C-1709
Withdrawn
|
Cisco Systems, Inc.
,
Juniper Networks
,
Verizon Communication Corporation
|
|
2011-11-21 |
|
[ 1712 ]
(Rev.1) |
G.8131 Single Document
|
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
Q9/15
|
2011-11-21 |
|
[ 1711 ]
(Rev.1) |
G.8113.2 comments
|
Cisco Systems, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
QALL/15, Q10/15
|
2011-11-21 |
|
[ 1710 ]
(Rev.1) |
Proposed changes to G.8113.1
|
Cisco Systems, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
Q10/15
|
2011-11-21 |
|
[ 1709 ]
(Rev.1) |
Updated text for G.8131/Y.1382
|
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
Q9/15
|
2011-11-21 |
|
[ 1708 ]
(Rev.1) |
Security with Timing as a Managed Service
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1707 ]
(Rev.1) |
Considerations on Packet Rate for the PEC-S-F
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1706 ]
(Rev.1) |
Lack of consensus on G.8113.1
|
Cisco Systems, Inc.
,
France Télécom Orange
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
QALL/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1705 ]
|
Enhanced delay measurement for OTN
|
Korea (Rep. of)
|
Q11/15
|
2011-11-21 |
|
[ 1704 ]
|
Considerations for G.8031 corrigendum
|
Korea (Rep. of)
|
Q9/15
|
2011-11-21 |
|
[ 1703 ]
(Rev.1) |
PEC-S-F Output Timing Signals
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1702 ]
(Rev.1) |
Noise Tolerance for the Packet Slave Clock (PEC-S-F)
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1701 ]
|
Synchronization Requirement in OTN
|
China Mobile Communications Corporation
|
Q13/15, Q11/15
|
2011-11-21 |
|
[ 1700 ]
(Rev.1) |
Noise Generation for the Packet Slave Clock (PEC-S-F)
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1699 ]
|
The OAM structure and functions requirements for Packet-based synchronization network
|
China Mobile Communications Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1698 ]
(Rev.1) |
Propose to consent G.8113.1 OAM for large scale application in China Mobile
|
China Mobile Communications Corporation
|
Q10/15
|
2011-11-21 |
|
[ 1697 ]
(Rev.1) |
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
,
France Télécom Orange
,
Telecom Italia S.p.A.
|
Q4/15
|
2011-11-21 |
|
[ 1696 ]
(Rev.1) |
Testing of Packet Slave Clocks
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1695 ]
(Rev.1) |
Measuring PRTC Accuracy
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1694 ]
|
Withdrawn, duplicate of C-1843 - G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
Withdrawn
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-21 |
|
[ 1693 ]
(Rev.1) |
Cesium Clock Wander Contribution to Grandmaster Clock Characterization
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1692 ]
(Rev.1) |
Inconsistencies in G.829 following corrigendum 2007
|
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2011-11-21 |
|
[ 1691 ]
(Rev.1-2) |
Testing Packet Slave Clocks using Flicker Noise
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1690 ]
(Rev.1) |
Proposal to study the convergence of PON and transport network in the next study period
|
ZTE Corporation
|
Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1689 ]
(Rev.1) |
Proposal to study the convergence of optical and packet in the next study period
|
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2011-11-21 |
|
[ 1688 ]
(Rev.1) |
Proposal for joint discussion about flexible grid network
|
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-21 |
|
[ 1687 ]
|
Propose update G.8031/G.8032 to support Multipoint Ethernet connection protection
|
Alcatel-Lucent Bell N.V.
|
Q9/15
|
2011-11-21 |
|
[ 1686 ]
(Rev.1) |
Comments and proposal on revision of G.654
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q8/15, Q5/15
|
2011-11-21 |
|
[ 1685 ]
(Rev.1) |
G.8273.2: Discussion on text for Sections 6 through 9.
|
Calnex Solutions Limited
|
Q13/15
|
2011-11-21 |
|
[ 1684 ]
(Rev.1) |
Comments on draft G.8260, Section I.5 'PDV Metrics studying minimum floor delay packet population.'
|
Calnex Solutions Limited
|
Q13/15
|
2011-11-21 |
|
[ 1683 ]
(Rev.1) |
Including Normative references to IETF RFCs in G.8113.2
|
Nokia Siemens Networks GmbH & Co. KG
|
QALL/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1682 ]
(Rev.1-2) |
Proposal of supported functions in the first version of G.873.2
|
Alcatel-Lucent Deutschland AG
|
Q9/15
|
2011-11-21 |
|
[ 1681 ]
(Rev.1) |
Updated definition of EVM for G.698.2
|
Ciena Corporation
|
Q6/15
|
2011-11-21 |
|
[ 1680 ]
(Rev.1-2) |
G.798 proposal for dealing with incoming frame slips (LL Study point 2)
|
Alcatel-Lucent Deutschland AG
|
Q9/15
|
2011-11-21 |
|
[ 1679 ]
(Rev.1) |
Considerations for an OTU5/ODU5 definition
|
ITEK
|
Q11/15
|
2011-11-21 |
|
[ 1678 ]
(Rev.1-3) |
G.798 MSI processing
|
ITEK
|
Q9/15
|
2011-11-21 |
|
[ 1677 ]
(Rev.1) |
Draft contents of new Recommendation G.odusmp
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2011-11-21 |
|
[ 1676 ]
(Rev.1) |
Noises Introduced by Boundary Clocks
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1675 ]
(Rev.1) |
Consideration on client signal mapping for ODU5/OTU5
|
Fujitsu Limited
|
Q11/15
|
2011-11-21 |
|
[ 1674 ]
(Rev.1) |
G.8265 and G.8265.1 Editorial change
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1673 ]
(Rev.1) |
Time transient build out and time offset response
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1672 ]
(Rev.1) |
The mixed SSM_PTP application for frequency synchronization
|
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1671 ]
(Rev.1) |
Consideration for G.8012.1 (updates to cd02)
|
Fujitsu Limited
|
Q10/15
|
2011-11-21 |
|
[ 1670 ]
(Rev.1) |
Consideration on SP#23 in Y.1731 Living List
|
Fujitsu Limited
|
Q10/15
|
2011-11-21 |
|
[ 1669 ]
(Rev.1) |
Consideration on counter wrapping issues in Ethernet OAM functions
|
Fujitsu Limited
|
Q10/15
|
2011-11-21 |
|
[ 1668 ]
(Rev.1) |
Proposed clarification of the timer behaviour in SLR reception
|
Fujitsu Limited
|
Q10/15
|
2011-11-21 |
|
[ 1667 ]
(Rev.1) |
Proposal of the combination of jumping and sliding window
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1666 ]
(Rev.1) |
Proposed mechanism and format for 1SL
|
Fujitsu Limited
|
Q9/15, Q10/15
|
2011-11-21 |
|
[ 1665 ]
(Rev.1) |
Proposed input for progressing Distributed Network Protection (DNP) with interworking
|
Fujitsu Limited
|
Q9/15
|
2011-11-21 |
|
[ 1664 ]
(Rev.1) |
Comments and proposal on the clause 8 in draft G.873.2
|
Fujitsu Limited
|
Q9/15
|
2011-11-21 |
Results:420 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):