Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 79 ]
|
Liaison statement to WPs 9D, 7B and 7D concerning Resolution 79 (WRC-2000)
|
Chairman, WP 3M
|
|
2002-02-11 |
|
[ 78 ]
|
Report on the February 2002 meeting of Working Party 7B with a view to its next meeting (September/October 2002)
|
Chairman, WP 7B
|
|
2002-02-11 |
|
[ 77 ]
|
List of documents issued
|
BRSGD
|
|
2002-02-11 |
|
[ 76 ]
|
Examination under No. S11.32 of frequency assignments relating an inter-satellite (space-to-space) network composed of a space station on a geostationary satellite and a space station on a non-geostationary satellite
|
Director, BR
|
|
2002-02-11 |
|
[ 75 ]
|
Proposed draft revised Recommendation ITU-R SA.1278 regarding addition of the space research service to the band 25.5-27.0 GHz
|
European Space Agency (ESA)
|
|
2002-02-11 |
|
[ 74 ]
|
Preliminary draft new Question - Need for frequency allocations above 275 GHz to the EESS (passive) and SRS (passive)
|
France
|
|
2002-02-11 |
|
[ 73 ]
|
Determination of coordination distance / exclusion zone between radio astronomy antenna and fixed service systems operating at 43 GHz - Resolution 79
|
France
|
|
2002-02-11 |
|
[ 72 ]
|
A sharing analysis between a single SRS system and FSS systems in the 37.5-38.0 GHz band
|
France
|
|
2002-02-11 |
|
[ 71 ]
|
Estimation of feasibility to allocate up to 3 MHz spectrum in the frequency band 235.0-328.6 MHz to implement telecommand uplinks in space research and space operation services
|
Russian Federation
|
|
2002-02-11 |
|
[ 70 ]
|
Sharing analysis between METS and FSS in the 37.5-38.0 Band (II)
|
Japan
|
|
2002-02-11 |
|
[ 69 ]
|
PDNR on sharing considerations and interim consultation process for high density fixed service sharing with the space research service (space-to-Earth) in the 31.8-32.3 and 37-38 GHz bands
|
United States of America
|
|
2002-02-11 |
|
[ 68 ]
|
Conditions for stations in the space research service (space-to-earth) to share with BSS feeder links in the 14.5-14.8 GHz band
|
United States of America
|
|
2002-02-11 |
|
[ 67 ]
|
Sharing between the mobile service (aeronautical mobile) and the space research service (space-to-Earth) in the frequency band 37-38 GHz
|
United States of America
|
|
2002-02-11 |
|
[ 66 ]
|
Working document towards draft CPM text on the 15 GHz element of Agenda item 1.12 (WRC-03) Resolution 723, resolves 4
|
United States of America
|
|
2002-02-11 |
|
[ 65 ]
|
Working document towards draft CPM text on the 26 GHz element of Agenda item 1.12 (WRC-2003) Resolution 723 resolves 4
|
United States of America
|
|
2002-02-11 |
|
[ 64 ]
|
Draft response to Document 7B/37 - Liaison from JTG 4-7-8
|
United States of America
|
|
2002-02-11 |
|
[ 63 ]
|
A preliminary draft CPM text addressing the feasibility of sharing between the space research service (space-to-Earth) and the fixed satellite service (space-to-Earth) in the band 37.5-38 GHz
|
Japan
|
|
2002-07-31 |
|
[ 62 ]
|
Review of Recommendations ITU-R SA. Series
|
Vice-Chairman, SG 7
|
|
2002-02-11 |
|
[ 61 ]
|
Liaison statement to WP 7B - Modifications to data relay satellite orbital locations
|
WP 9D
|
|
2002-02-11 |
|
[ 60 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 6S, 7E, 7B, 8D, 9A, 9B and 9D - A draft new Recommendation and a draft new revision of Recommendations dealing with sharing bewtween the FS and FSS operating in the band 37.5 to 42.5 GHz
|
WP 4-9S
|
|
2002-02-11 |
|
[ 59 ]
|
Liaison statement to WPs 4A, 7B, 7D, 7E and 9D - Agenda item 1.11 of WRC-03
|
WP 8D
|
|
2002-02-11 |
|
[ 58 ]
|
Liaison to WPs 1C, 4A, 6S, 7B, 7C, 7D, 8B, 8D, 9B, 9C and 9D
|
TG 1/7
|
|
2002-02-11 |
|
[ 57 ]
|
Liaison statement to Working Parties 4A, 6E, 6S, 7A, 7B, 7C, 8A, 8B, 8D, 8F and 9B - Definitions of the spectral properties of transmitter emissions
|
WP 1A
|
|
2002-02-11 |
|
[ 56 ]
|
Liaison statement to WPs 3J, 4A, 4B, 6E, 6S, 7B, 7D, 8A, 8B and 9D - Compatibility between Ultra Wideband (UWB) emissions and Radiocommunication Services
|
WPs 1A and 1B
|
|
2002-02-11 |
|
[ 55 ]
|
Liaison statement from WP 9D - Resolution 79 (WRC-2000) on the coordination distance between radio astronomy and earth stations in bands above 30 GHz and P-MP high density applications in the fixed servce
|
WP 9D
|
|
2002-02-11 |
|
[ 54 ]
|
Working document towards draft CPM text on the 15 GHz element on Agenda Item 1.12 (WRC-03) Resolution 723 resolves 4
|
WP 7E
|
|
2002-02-11 |
|
[ 53 ]
|
Working document towards draft CPM text on the 26 GHz element of Agenda item 1.12 (WRC-03) Resolution 723 resolves 4
|
WP 7E
|
|
2002-02-11 |
|
[ 52 ]
|
Working document toward draft CPM text for Agenda item 1.12 resolves 1
|
WP 7E
|
|
2002-02-11 |
|
[ 51 ]
|
Liaison statement to WP 8D on compatibility between the AMSS and the radio astronomy service in the 14.0-14.5 GHz band
|
WP 7E
|
|
2002-02-11 |
|
[ 50 ]
|
Examination under No. S11.32 of frequency assignments relating to an inter-satellite (space-to-space) network comprising a space statin on a geostationary satellite and a space station on a non-geostationary satellite
|
SG 7
|
|
2002-02-11 |
|
[ 49 ]
|
Note by Study Group 7 Chairman
|
SG 7
|
|
2002-02-11 |
|
[ 48 ]
(Rev.1) |
Response to liaison statement from WP 7B in Doc. 4A/215
|
WP 4A
|
|
2002-02-11 |
|
[ 47 ]
|
Liaison statement to WPs 7B and 7E - CPM text concerning WRC-03 Agenda item 1.12
|
WP 9D
|
|
2002-02-11 |
|
[ 46 ]
|
Liaison statement to Working Parties 7B and 7E - CPM text concerning WRC-03 Agenda item 1.12
|
WP 9D
|
|
2002-02-11 |
|
[ 45 ]
|
Liaison statement to Working Parties 7B and 7E - Studies related to WRC-03 Agenda item 1.12, Resolution 723 (WRC-2000), resolves 1 - Summary of the available information on the provision of spectrum for telecommand links in the space research and space operation service in frequency bands from 100 MHz to 1 GHz
|
WP 9D
|
|
2002-02-11 |
|
[ 44 ]
|
Liaison statement to WP 7E and for information to WP 7B - CPM text addressing the feasibility of sharing between the space research service (space-to-Earth) and the fixed service in the band 14.8-15.35 GHz
|
WP 9D
|
|
2002-02-11 |
|
[ 43 ]
|
Liaison to Working Parties 1A, 6S, 7B, 7C, 8D, Satellite Backlog Action Group and the Radiocommunications Bureau - Development of specifications for automating Article S5 and other provisions of the radio regulations
|
WP 4A
|
|
2002-02-11 |
|
[ 42 ]
+Add.1 |
Liaison Statement to the Special Committee, Working Parties 1A, 6S, 7B, 7C and 8D and Note to the Director, Radiocommunication Bureau
|
WP 4A
|
|
2002-02-11 |
|
[ 41 ]
|
Liaison statement to WPs 7B and 7E - Draft CPM text addressing the feasibility of sharing between the space research service (Deep Space) and the inter-satellite service in the band 32.0-32.3 GHz
|
WP 4A
|
|
2002-02-11 |
|
[ 40 ]
|
Liaison statement to WPs 7B, 7E, 8A, 8D, 8F and JTG 1-6-8-9 in respect of sharing of spectrum for WRC-03 Agenda Items seeking spectrum allocations within VHF/UHF terrestrial television bands - Current and future spectrum requirements for terrestrial television broadcasting
|
WP 6E
|
|
2002-02-11 |
|
[ 39 ]
|
Reply to liaison statement from Working Party 7B - WRC-03 Agenda item 1.12, Resolution 712, resolves 1
|
WP 6S
|
|
2002-02-11 |
|
[ 38 ]
|
Liaison statement to Working Party 7B - Unwanted emission characteristics of mobile stations and base stations using the terrestrial radio interfaces of IMT-2000
|
WP 8F
|
|
2002-02-11 |
|
[ 37 ]
|
Liaison statement to WP 7B and 4A on consideration of an analysis on the possible extension of the SRS co-primary 6 MHz band allocation under S5.503 by 4 MHz in the band 13.75-13.8 GHz
|
JTG 4-7-8
|
|
2002-02-11 |
|
[ 36 ]
|
Liaison statement to Working Parties 7B and 7E - Characteristics of non-GSO MSS systems for use in existing allocations in the 450-460 MHz range
|
WP 8D
|
|
2002-02-11 |
|
[ 35 ]
|
Liaison statement to Working Parties 7B, 7D and 7E - Response to Liaison Statement from Working Party 7D regarding Agenda item 1.11 of WRC-03
|
WP 8D
|
|
2002-02-11 |
|
[ 34 ]
|
Liaison statement to Working Parties 7B and 7E - Information on systems using frequency bands under consideration for possible use by telecommand links (earth-to-space) for the space research and space operations services
|
WP 8B
|
|
2002-02-11 |
|
[ 33 ]
|
Report on the 8-17 May 2001 meeting of Working Party 7B with a view to its next meeting (February 2002)
|
Chairman, WP 7B
|
|
2002-02-11 |
|
[ 32 ]
+Corr.1 |
Liaison statement to WPs 7B, 7D and 9D - Working document concerning Agenda item 1.11 of WRC-03
|
WP 4A
|
|
2002-02-11 |
|
[ 31 ]
|
Liaison statement to Working Parties 1A, 6S, 7C, 8D and the BR - Automating Article S5 and other provisions of the Radio Regulations
|
WP 4A
|
|
2002-02-11 |
|
[ 30 ]
|
Liaison Statement to WP 7B - FSS information for FSS/SRS frequency sharing near 40 GHz
|
WP 4A
|
|
2002-02-11 |
Results:104 total items. Result page:
-
1 -
2 -
3
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):